![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
DB34/T 4254-2022 Superconducting cyclotron—Specification for installation management
Issued on: 2022-08-31 Price(USD): |
|
GB/T 15221-2025 Analytical method for cobalt-60 in water
Issued on: 2025-10-05 Price(USD): 255.0 |
|
GB/T 15220-2025 Analytical method for the radioactive iron in water
Issued on: 2025-10-05 Price(USD): 315.0 |
|
GB/T 4833.1-2025 Multichannel analyzers—Part 1: Technical requirements and test methods for pulse amplitude analysis
Issued on: 2025-10-05 Price(USD): |
|
GB/T 20130-2025 Self-shielding electron beam facility for radiation processing
Issued on: 2025-04-25 Price(USD): 315.0 |
|
GB/T 44772-2024 Control of contact materials in manufacturing, packaing, storage and transportation of PWR nuclear fuel elements
Issued on: 2024-10-26 Price(USD): 150.0 |
|
GB/T 44771-2024 Process and product qualification requirements for manufacturing of PWR nuclear fuel assemblies
Issued on: 2024-10-26 Price(USD): 315.0 |
|
NB/T 20238-2023 Nuclear power plant radiation monitoring system installation technical regulation
Issued on: 2023-12-28 Price(USD): 135.0 |
|
NB/T 20173-2023 Technical regulations for construction and test of polar crane at PWR reactor building
Issued on: 2023-12-28 Price(USD): 195.0 |
|
NB/T 20697-2023 Design criteria for on-site emergency facilities of nuclear power plants
Issued on: 2023-10-11 Price(USD): 420.0 |
|
NB/T 20695-2023 Qualification of ex-core neutron detectors for nuclear power plants
Issued on: 2023-10-11 Price(USD): 285.0 |
|
NB/T 20690-2023 Design criteria for spent fuel pool cooling and cleaning system of pressurized waterreactor nuclear power plants
Issued on: 2023-10-11 Price(USD): 165.0 |
|
NB/T 20469-2023 Technical guideline for loss offsite power test of PWR nuclearpower plant
Issued on: 2023-10-11 Price(USD): 210.0 |
|
NB/T 20196.2-2023 The condition monitoring methods of cable important to safety in nuclear powerplants Part 6: Insulation resistance
Issued on: 2023-10-11 Price(USD): 285.0 |
|
NB/T 20421.6-2023 The condition monitoring methods of cable important to safety in nuclear powerplants Part 6: Insulation resistance
Issued on: 2023-10-11 Price(USD): 285.0 |
|
NB/T 20129-2023 General technical regulation for installation||test and acceptance of emergency diesel generator of nuclear island in pressurized water reactor nuclear power plants
Issued on: 2023-10-11 Price(USD): 345.0 |
|
NB/T 11295-2023 Technical Specification for Glass- fiber Reinforced Plastic Cladding Reinforced Concrete Piping for Nuclear Power Plants
Issued on: 2023-10-11 Price(USD): 315.0 |
|
NB/T 20663-2023 Technical Specification for Installation of Ventilation System of PWR Nuclear Power Plant Nuclear Island
Issued on: 2023-5-26 Price(USD): 285.0 |
|
NB/T 20674-2023 Technical specification for installation of primary piping|| surge line and related supports in PWR nuclear power plant
Issued on: 2023-5-26 Price(USD): 210.0 |
|
NB/T 20672-2023 Technical Specification for Installation of Steam Generators in PWR nuclear power plant
Issued on: 2023-5-26 Price(USD): 270.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||