AQ/T 2073-2019 |
Electrical safety testing-inspecting specification of in-service high-voltage switchgear for metal and nonmetal mines |
$210.00 |
via email in 1~3 business day |
superseded,2020-2-1,2020-2-1 |
|
CECS 31-2006 |
Code for design of steel cable tray engineering |
$300.00 |
immediately |
abolished2018-3-1,2018-3-1,2006-8-1 |
|
DB15/T 3413-2024 |
Code for construction of power supply and distribution facilities in residential communities and commercial buildings |
|
via email in business day |
valid,,2024-5-15 |
|
DB31/T 1034-2017 |
Service specifications for distributed photovoltaic power application |
$375.00 |
via email in 1~5 business day |
abolished2023-11-30 ,,2017-5-1 |
|
DB31/T 668.15-2015 |
Energy savings M&V and calculation method for energy conservation technicalretrowit and EPC project-Part 15:Transport &distribution electric cable |
$165.00 |
via email in 1~3 business day |
valid,,2016-1-1 |
|
DB32/T 3952-2020 |
Wind turbine generator system—Code of practice for maintenance of manned lifting equipment |
$255.00 |
via email in 1~3 business day |
valid,,2021-1-15 |
|
DB32/T 4363-2022 |
Technical requirements for the energy-converting lightning protection grounding device |
|
via email in business day |
valid,, |
|
DB32/T 4878-2024 |
Standard for construction of power supply and distribution facilities in residential districts |
|
via email in business day |
valid,,2025-5-1 |
|
DB32/T 4895-2024 |
Technical specification for continuous monitoring of power frequency electromagnetic environment in substations |
|
via email in business day |
valid,,2024-12-7 |
|
DB37/T 3517-2019 |
|
|
via email in business day |
valid,,2019-4-21 |
|
DB45/T 864-2012 |
Technical guide for interconnecting microgrids with distribution systems with voltages nomore than 10kV |
$270.00 |
via email in 1~3 business day |
valid,,2012-12-30 |
|
DB51/T 3149-2023 |
|
|
via email in business day |
valid,,2024-1-29 |
|
DL 5449-2012 |
Technical code for the design of 20kV electrical installation |
$810.00 |
via email in 1~3 business day |
abolished2025-03-24,2025-3-24,2012-3-1 |
|
DL/T 1006-2006 |
Patrol system for overhead lines |
$150.00 |
via email in 1~3 business day |
superseded,2024-6-28,2007-3-1 |
|
DL/T 1007-2006 |
Live wording-Guidelines for the installation of transmission line conductors and earthwires-Stringing equipment and accessory items |
$480.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.1-2006 |
High-voltage static VAR compensator Part 1:System design |
$360.00 |
via email in 1~3 business day |
to be superseded,2025-6-25,2007-3-1 |
|
DL/T 1010.2-2006 |
High-voltage static VAR compensator Part 2:Testing of thyristor valves |
$390.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.3-2006 |
High-voltage static VAR compensator Part 3:Control system |
$300.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.4-2006 |
High-voltage static VAR compensator Part 4:Field tests |
$240.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
DL/T 1010.5-2006 |
High-voltage static VAR compensator Part 5:Closed-loop water cooling system |
$240.00 |
via email in 1~3 business day |
valid,,2007-3-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10][11]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[1][2][3][4][5][6][7][8][9][10][11]
Next
End
|