2025-12-5 216.73.216.21
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
GB/T 20972.3-2025 Petroleum and natural gas industries—Material for use in H2S-containing environments in oil and gas production—Part 3:Cracking-resistant CRAs(corrosion-resistant alloys)and other alloys 1200.0 via email in 1~5 business day valid,,2025-8-1
GB/T 20972.2-2025 Petroleum and natural gas industries—Materials for use in H2S-containing environments in oil and gas production—Part 2: Cracking-resistant carbon and low alloy steels, and the use of cast irons 735.0 via email in 1~5 business day valid,,2025-8-1
SY/T 5922-2024 Specification for operation of gas pipelines 495.0 via email in 1~5 business day valid,,2025-3-24
SY/T 7033-2024 Specification for emergency repair of oil and gas steel pipelines 255.0 via email in 1~3 business day valid,,2025-3-24
T/CSRME 027-2022 Technical manual for the leaching of salt cavern gas storage by connected wells 435.0 via email in 1~5 business day valid,,2023-1-1
GB/T 8423.3-2018 Petroleum and natural gas industries terminology—Part 3:Oil-gas surface engineering 630.0 via email in 1~5 business day valid,,2019-7-1
SY/T 6102-2006 Oil field development monitoring and data requirement 105.0 via email in 1~3 business day superseded,2023-5-4,2007-1-1
SY/T 6510-2000 Technical requirement for steam injection development project design of heavy oil reservoir 120.0 via email in 1~3 business day superseded,2015-3-1,2001-6-1
SY/T 6366-1998 The main technical target of production for oil field development and itcalculated methods 380.0 via email in 1~3 business day superseded,2005-10-1,1999-10-1
SY/T 6661-2012 Calibration Methods for Geophone 224.0 via email in 1~3 business day superseded2025-03-24,2025-3-24,2012-3-1
SY/T 6529-2002 Specification for permanent type fire -- fighting system operation of crude oil storage 105.0 via email in 1~3 business day superseded,2011-5-1,2002-8-1
SY/T 6434-2000 Analysis for natural gas reservoir fluids physical properties 345.0 via email in 1~5 business day superseded,2010-5-1,2000-10-1
SY/T 5387-2000 Technological requirement of geology for conventional oil reservoir production test 165.0 via email in 1~3 business day superseded,2023-5-4,2001-6-1
SY/T 6756-2009 Specification for workover in hydrocarbon reservoir underground gas storage 120.0 via email in 1~3 business day abolished2025-03-24,2025-3-24,2010-5-1
SY/T 5386-2000 The regulations of proved reserves calculation of petroleum The part of fractured oil and gas reservoir 315.0 via email in 1~5 business day superseded2010-12-15,2010-12-15,2001-6-1
SY/T 6996-2014 Assessment of steel oil & gas pipeline with dent 140.0 via email in 1~3 business day superseded,2025-6-25,2015-3-1
SY/T 5358-2002 Formation damage evaluation by flow test 810.0 via email in 1~5 business day superseded2010-12-15,2010-12-15,2002-8-1
SY/T 10027-2012 Technical specification for marine high resolution seismic data acquisition 304.0 via email in 1~3 business day superseded2020-05-01 ,2020-5-1,2012-12-1
SY/T 6234-2003 Determination of gross heat transfer factor for the buried pipeline 240.0 via email in 1~3 business day abolished2010-12-15,2010-12-15,2003-8-1
SY/T 6177-2000 Economic evaluation method of development program for natural gas reservoir 285.0 via email in 1~3 business day superseded,2010-5-1,2000-10-1
Previous Page     Next Page



Code of China
Search

GB/T 20972.3-2025 Petroleum and natural gas industries—Material for use in H2S-containing environments in oil and gas production—Part 3:Cracking-resistant CRAs(corrosion-resistant alloys)and other alloys 
  Issued on: 2025-01-24   Price(USD): 1200.0
GB/T 20972.2-2025 Petroleum and natural gas industries—Materials for use in H2S-containing environments in oil and gas production—Part 2: Cracking-resistant carbon and low alloy steels, and the use of cast irons 
  Issued on: 2025-01-24   Price(USD): 735.0
SY/T 5922-2024 Specification for operation of gas pipelines 
  Issued on: 2024-09-24   Price(USD): 495.0
SY/T 7033-2024 Specification for emergency repair of oil and gas steel pipelines 
  Issued on: 2024-09-24   Price(USD): 255.0
T/CSRME 027-2022 Technical manual for the leaching of salt cavern gas storage by connected wells 
  Issued on: 2022-11-28   Price(USD): 435.0
GB/T 8423.3-2018 Petroleum and natural gas industries terminology—Part 3:Oil-gas surface engineering 
  Issued on: 2018-12-28   Price(USD): 630.0
SY/T 6102-2006 Oil field development monitoring and data requirement 
  Issued on: 2006-7-10   Price(USD): 105.0
SY/T 6510-2000 Technical requirement for steam injection development project design of heavy oil reservoir 
  Issued on: 2000-12-25   Price(USD): 120.0
SY/T 6366-1998 The main technical target of production for oil field development and itcalculated methods 
  Issued on: 1999-03-03   Price(USD): 380.0
SY/T 6661-2012 Calibration Methods for Geophone 
  Issued on: 2012-01-04   Price(USD): 224.0
SY/T 6529-2002 Specification for permanent type fire -- fighting system operation of crude oil storage 
  Issued on: 2002-05-28   Price(USD): 105.0
SY/T 6434-2000 Analysis for natural gas reservoir fluids physical properties 
  Issued on: 2000-03-31   Price(USD): 345.0
SY/T 5387-2000 Technological requirement of geology for conventional oil reservoir production test 
  Issued on: 2000-12-25   Price(USD): 165.0
SY/T 6756-2009 Specification for workover in hydrocarbon reservoir underground gas storage 
  Issued on: 2009-12-31   Price(USD): 120.0
SY/T 5386-2000 The regulations of proved reserves calculation of petroleum The part of fractured oil and gas reservoir 
  Issued on: 2000-12-25   Price(USD): 315.0
SY/T 6996-2014 Assessment of steel oil & gas pipeline with dent 
  Issued on: 2014-10-15   Price(USD): 140.0
SY/T 5358-2002 Formation damage evaluation by flow test 
  Issued on: 2002-05-28   Price(USD): 810.0
SY/T 10027-2012 Technical specification for marine high resolution seismic data acquisition 
  Issued on: 2012-8-23   Price(USD): 304.0
SY/T 6234-2003 Determination of gross heat transfer factor for the buried pipeline 
  Issued on: 2003-03-18   Price(USD): 240.0
SY/T 6177-2000 Economic evaluation method of development program for natural gas reservoir 
  Issued on: 2000-03-31   Price(USD): 285.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040