2025-12-5 216.73.216.21
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
T/SDHS 3-2025 Guidelines for the supervision and management of the whole process of commissioning of nuclear power plant operators via email in business day valid,,2025-7-20
NB/T 20712-2023 Guidelines for zinc addition in primary coolant of pressurized water reactors 255.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20711-2023 Commissioning technical guidelines for the reactor cavity and spent fuel pit cooling and treatment system of PWR nuclear power plant 105.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20278-2023 Design criteria for emergency feedwater system of pressurized water reactor nuclear power plant 195.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20260-2023 Design criteria for residual heat removal system of pressurized water reactor nuclearpower plant 210.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20231-2023 Design criteria for engieered safety features of pressurized water reactor nuclearpower plants 270.0 via email in 1~3 business day valid,,2024-6-28
NB/T 20709-2023 Digital technical specification of radiographic film in nuclear power plant 225.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20704-2023 Guideline for long-term asset management in operating nuclear power plants 405.0 via email in 1~5 business day valid,,2024-4-11
NB/T 20706-2023 Guidance for the performance index of nuclear power plants 345.0 via email in 1~5 business day valid,,2024-4-11
NB/T 20701-2023 Specification for preparation of in-service inspection program in nuclear power plants 225.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20702-2023 Guidelines for the use of industrial safety signs for nuclear power plants 630.0 via email in 1~5 business day valid,,2024-4-11
NB/T 20700-2023 Application guidance of burnup credit for fuel assemblies of pressurized waterreactor nuclear power plants 210.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20703-2023 Chemistry control performance indicator for pressurized water reactor nuclear power plant 405.0 via email in 1~5 business day valid,,2024-4-11
NB/T 20698-2023 Technical requirements for control rod shim operation of pressurized water reactor nuclear power plants 135.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20696-2023 Periodic inspect and test of catalytic plate passive hydrogen recombiner for NPP 165.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20699-2023 Flow Stability Evaluation Method For Pressurized Water Reactor Nuclear Power Plant 225.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20694-2023 Analysis Requirements for Main Steam Line Break Accident of Pressurized Water Reactor Nuclear Power Plants 165.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20692-2023 Guidelines for the establishment and application of maintenance rule at nuclear power plants 285.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20693-2023 Regulation of content and depth of occupational safety facilities design report of nuclear power plants 225.0 via email in 1~3 business day valid,,2024-4-11
NB/T 20688-2023 Analysis Requirements for Reactor Coolant System Design Transients of Pressurized Water Reactor Nuclear Power Plants 135.0 via email in 1~3 business day valid,,2024-4-11
Previous Page     Next Page



Code of China
Search

T/SDHS 3-2025 Guidelines for the supervision and management of the whole process of commissioning of nuclear power plant operators 
  Issued on: 2025-06-20   Price(USD):
NB/T 20712-2023 Guidelines for zinc addition in primary coolant of pressurized water reactors 
  Issued on: 2023-12-28   Price(USD): 255.0
NB/T 20711-2023 Commissioning technical guidelines for the reactor cavity and spent fuel pit cooling and treatment system of PWR nuclear power plant 
  Issued on: 2023-12-28   Price(USD): 105.0
NB/T 20278-2023 Design criteria for emergency feedwater system of pressurized water reactor nuclear power plant 
  Issued on: 2023-12-28   Price(USD): 195.0
NB/T 20260-2023 Design criteria for residual heat removal system of pressurized water reactor nuclearpower plant 
  Issued on: 2023-12-28   Price(USD): 210.0
NB/T 20231-2023 Design criteria for engieered safety features of pressurized water reactor nuclearpower plants 
  Issued on: 2023-12-28   Price(USD): 270.0
NB/T 20709-2023 Digital technical specification of radiographic film in nuclear power plant 
  Issued on: 2023-10-11   Price(USD): 225.0
NB/T 20704-2023 Guideline for long-term asset management in operating nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 405.0
NB/T 20706-2023 Guidance for the performance index of nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 345.0
NB/T 20701-2023 Specification for preparation of in-service inspection program in nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 225.0
NB/T 20702-2023 Guidelines for the use of industrial safety signs for nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 630.0
NB/T 20700-2023 Application guidance of burnup credit for fuel assemblies of pressurized waterreactor nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 210.0
NB/T 20703-2023 Chemistry control performance indicator for pressurized water reactor nuclear power plant 
  Issued on: 2023-10-11   Price(USD): 405.0
NB/T 20698-2023 Technical requirements for control rod shim operation of pressurized water reactor nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 135.0
NB/T 20696-2023 Periodic inspect and test of catalytic plate passive hydrogen recombiner for NPP 
  Issued on: 2023-10-11   Price(USD): 165.0
NB/T 20699-2023 Flow Stability Evaluation Method For Pressurized Water Reactor Nuclear Power Plant 
  Issued on: 2023-10-11   Price(USD): 225.0
NB/T 20694-2023 Analysis Requirements for Main Steam Line Break Accident of Pressurized Water Reactor Nuclear Power Plants 
  Issued on: 2023-10-11   Price(USD): 165.0
NB/T 20692-2023 Guidelines for the establishment and application of maintenance rule at nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 285.0
NB/T 20693-2023 Regulation of content and depth of occupational safety facilities design report of nuclear power plants 
  Issued on: 2023-10-11   Price(USD): 225.0
NB/T 20688-2023 Analysis Requirements for Reactor Coolant System Design Transients of Pressurized Water Reactor Nuclear Power Plants 
  Issued on: 2023-10-11   Price(USD): 135.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040