Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
CECS 206-2006 |
Technical specification for steel jacket pre-insulated pipeline with vacuum layer |
450.0 |
via email in 1~3 business day |
valid,,2006-11-1 |
|
DB37/T 3069-2017 |
|
|
via email in business day |
valid,,2018-1-13 |
|
DBJT 11-105-1998 |
Installation of prefabricated prefabricated drectly-buried cyano-polyester-plastics heat insulation pipe |
540.0 |
via email in 1~5 business day |
valid,,2002-5-1 |
|
GB 50184-1993 |
Standard for checking and evaluating the quality of industrial metallic piping |
730.0 |
via email in 1~8 business day |
abolished2008-10-01,2011-12-1,1994-2-1 |
|
GB 50184-2011 |
Code for acceptance of construction quality of industrial metallic piping enguneering |
120.0 |
via email in 1 business day |
valid,,2011-12-1 |
|
GB 50235-1997 |
Code for Construction and Acceptance of Industrial Metallic Piping |
320.0 |
via email in 1 business day |
abolished2011-06-01,2011-6-1,1998-5-1 |
|
GB 50235-2010 |
Code for construction of industrial metallic piping engineering |
140.0 |
via email in 1 business day |
valid,,2011-6-1 |
|
GB 50236-2011 |
Code for Construction of Field Equipment, Industrial Pipe Welding Engineering |
120.0 |
via email in 1 business day |
valid,,2011-10-1 |
|
GB 50470-2008 |
Seismic Technical Code for Oil and Gas Transmission Pipeline Engineering |
360.0 |
via email in 1 business day |
abolished2018-01-01,2018-1-1,2009-7-1 |
|
GB 50683-2011 |
Code for acceptance of field equipment,industrial pipe welding construction quality |
140.0 |
via email in 1 business day |
valid,,2012-5-1 |
|
GB/T 31032-2014 |
Welding and acceptance standard for steel pipings and pipelines |
520.0 |
via email in 1 business day |
valid,,2015-6-1 |
|
GB/T 50538-2010 |
Technical standard for anti-corrosion and insulation coating of buried steel pipeline |
1200.0 |
via email in 1~3 business day |
superseded,2021-6-1,2011-12-1 |
|
GBJ 126-1989 |
Specifications for construction and acceptance of industrial equipment and pipeline heat insulation |
660.0 |
via email in 1~8 business day |
abolished2008-08-01,2008-8-1,1990-1-1 |
|
GBJ 235-1982 |
Specifications for construction and acceptance of ventilation and air-conditioning work |
1490.0 |
via email in 1~10 business day |
superseded,1998-5-1,1982-8-1 |
|
GBJ 236-1982 |
Specifications for construction and acceptance of welding work of site equipment and industrial pipelines |
1500.0 |
via email in 1~10 business day |
abolished1999-06-01,1999-6-1,1982-8-1 |
|
HG/T 20544-1992 |
Technical Specification on Erection of Structure Parts for Chemical Furnace |
310.0 |
via email in 1~5 business day |
abolished2007-04-01,2007-4-1,1993-7-1 |
|
HG/T 20544-2006 |
Technical specification on erection of structure parts for chemical industrial furnace |
490.0 |
via email in 1~8 business day |
valid,,2007-4-1 |
|
HG/T 20549.1-1998 |
standard piping layout for chemical plant |
1000.0 |
via email in 1 business day |
valid,,1999-1-1 |
|
HG/T 20549.2-1998 |
standard piping layout for chemical plant |
300.0 |
via email in 1 business day |
valid,,1999-1-1 |
|
HG/T 20549.3-1998 |
standard piping layout for chemical plant |
240.0 |
via email in 1 business day |
valid,,1999-1-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
Next
End
|