2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/EJ/T 1022.15-1996
EJ/T 1022.15-1996   PWR nuclear power plant valve-Part 15: Seismic identification test (English Version)
Standard No.: EJ/T 1022.15-1996 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 5000 words Translation Price(USD):100.0 remind me the price change

Email:

Implemented on:1996-8-1 Delivery: via email in 1 business day

→ → →

,,1996-8-1,14374476293500003098a6467812ab2e
Standard No.: EJ/T 1022.15-1996
English Name: PWR nuclear power plant valve-Part 15: Seismic identification test
Chinese Name: 压水堆核电厂阀门 抗震鉴定试验
Professional Classification: EJ    Professional Standard - Nuclear Industry
Implemented on: 1996-8-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 5000 words
Translation Price(USD): 100.0
Delivery: via email in 1 business day
1 Subject Content and Application Scope This standard specifies the basic requirements of seismic evaluation test for active valve assemblies in PWR nuclear power plant. This standard is applicable to the seismic evaluation test of power-operated active valve assemblies in nuclear power plant. This standard is not applicable to power-operated pressure relief valve and self-operated valve. 2 Normative References EJ/T 1022.14 PWR Nuclear Power Plant Valve - Stress Analysis and Seismic Analysis 3 Terminologies 3.1 Active valve The valve parts implementing system safety function and achieving opening or closing by using such external input as triggering, mechanical movement or power source. 3.2 Valve device The combination of valve (including the functional auxiliary parts directly installed on valve) and drive device. 3.3 Required input motion (RIM) Input motion expressed by acceleration, speed and displacement, generally expressed by frequency function. It is required that the test apparatus shall withstand this input motion and still be able to complete its original function. 3.4 Cutoff frequency The frequency on response spectrum at the beginning of zero period acceleration asymptote. Above this frequency, single-degree-of-freedom oscillator shows no magnification of motion and indicates the upper limit of frequency components of to-be-analyzed waveform. 3.5 Flexible valve The valve whose lowest resonance frequency is less than the cutoff frequency of response spectrum. Generally valves lower than 33Hz. 3.6 Rigid valve The valve whose lowest resonance frequency is greater than the cutoff frequency of response spectrum. Generally valves greater than 33Hz. 3.7 Octave (oct) The interval of two frequencies with the frequency ratio of 2, e.g. one-third-octave band refers to two frequencies with the frequency ratio of 21/3, from 1 to 1.26Hz, 1.26 to 1.59Hz, and 1.59 to 2Hz, etc.
1 Subject Content and Application Scope 2 Normative References 3 Terminologies 4 General Rules 5 Test Preparation 6 Seismic Evaluation Test of Valves 7 Inspection 8 Acceptance 9 Evaluation Report Additional Explanation:
Referred in EJ/T 1022.15-1996:
* EJ/T 1022.14-1996 PWR nuclear power plant valve-Part 14: Stress analysis and seismic analysis
EJ/T 1022.15-1996 is referred in:
* EJ/T 1022.1-1996 PWR nuclear power plant valve - Part 1: General rules for design and manufacture
* EJ/T 1022.11-1996 PWR nuclear power plant valve-Part 11: Electric actuator
Code of China
Standard
EJ/T 1022.15-1996  PWR nuclear power plant valve-Part 15: Seismic identification test (English Version)
Standard No.EJ/T 1022.15-1996
Statusvalid
LanguageEnglish
File FormatPDF
Word Count5000 words
Price(USD)100.0
Implemented on1996-8-1
Deliveryvia email in 1 business day
Detail of EJ/T 1022.15-1996
Standard No.
EJ/T 1022.15-1996
English Name
PWR nuclear power plant valve-Part 15: Seismic identification test
Chinese Name
压水堆核电厂阀门 抗震鉴定试验
Chinese Classification
Professional Classification
EJ
ICS Classification
Issued by
Issued on
Implemented on
1996-8-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
5000 words
Price(USD)
100.0
Keywords
EJ/T 1022.15-1996, EJ 1022.15-1996, EJT 1022.15-1996, EJ/T1022.15-1996, EJ/T 1022.15, EJ/T1022.15, EJ1022.15-1996, EJ 1022.15, EJ1022.15, EJT1022.15-1996, EJT 1022.15, EJT1022.15
Introduction of EJ/T 1022.15-1996
1 Subject Content and Application Scope This standard specifies the basic requirements of seismic evaluation test for active valve assemblies in PWR nuclear power plant. This standard is applicable to the seismic evaluation test of power-operated active valve assemblies in nuclear power plant. This standard is not applicable to power-operated pressure relief valve and self-operated valve. 2 Normative References EJ/T 1022.14 PWR Nuclear Power Plant Valve - Stress Analysis and Seismic Analysis 3 Terminologies 3.1 Active valve The valve parts implementing system safety function and achieving opening or closing by using such external input as triggering, mechanical movement or power source. 3.2 Valve device The combination of valve (including the functional auxiliary parts directly installed on valve) and drive device. 3.3 Required input motion (RIM) Input motion expressed by acceleration, speed and displacement, generally expressed by frequency function. It is required that the test apparatus shall withstand this input motion and still be able to complete its original function. 3.4 Cutoff frequency The frequency on response spectrum at the beginning of zero period acceleration asymptote. Above this frequency, single-degree-of-freedom oscillator shows no magnification of motion and indicates the upper limit of frequency components of to-be-analyzed waveform. 3.5 Flexible valve The valve whose lowest resonance frequency is less than the cutoff frequency of response spectrum. Generally valves lower than 33Hz. 3.6 Rigid valve The valve whose lowest resonance frequency is greater than the cutoff frequency of response spectrum. Generally valves greater than 33Hz. 3.7 Octave (oct) The interval of two frequencies with the frequency ratio of 2, e.g. one-third-octave band refers to two frequencies with the frequency ratio of 21/3, from 1 to 1.26Hz, 1.26 to 1.59Hz, and 1.59 to 2Hz, etc.
Contents of EJ/T 1022.15-1996
1 Subject Content and Application Scope 2 Normative References 3 Terminologies 4 General Rules 5 Test Preparation 6 Seismic Evaluation Test of Valves 7 Inspection 8 Acceptance 9 Evaluation Report Additional Explanation:
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
EJ/T 1022.15-1996, EJ 1022.15-1996, EJT 1022.15-1996, EJ/T1022.15-1996, EJ/T 1022.15, EJ/T1022.15, EJ1022.15-1996, EJ 1022.15, EJ1022.15, EJT1022.15-1996, EJT 1022.15, EJT1022.15