2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50198-2011
GB 50198-2011   Technical code for project of civil closed circuit monitoring television system (English Version)
Standard No.: GB 50198-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 13000 words Translation Price(USD):120.0 remind me the price change

Email:

Implemented on:2012-6-1 Delivery: via email in 1 business day

→ → →

,,2012-6-1,14113818189987BA58515218917F5
Standard No.: GB 50198-2011
English Name: Technical code for project of civil closed circuit monitoring television system
Chinese Name: 民用闭路监视电视系统工程技术规范
Chinese Classification: P77    Broadcasting, movie and television engineering
Professional Classification: GB    National Standard
ICS Classification: 33.160.01 33.160.01    Audio, video and audiovisual systems in general 33.160.01
Source Content Issued by: MOHURD
Issued on: 2011-8-26
Implemented on: 2012-6-1
Status: valid
Superseding:GB 50198-1994 Technical code for requnation of civil closed circuit monitoring TV system
Target Language: English
File Format: PDF
Word Count: 13000 words
Translation Price(USD): 120.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to implementing the technical economy policy of the nation, regulating the project design, construction and acceptance of civil closed monitoring television system (hereinafter referred to as system), achieving advanced technology, economy and rationality, safety and usability, guaranteed quality, energy conservation and environmental protection . 1.0.2 This code is applicable to the design, construction and acceptance of new, renovation and extension project of closed circuit television system with the main purpose of civil monitoring. 1.0.3 The system should adopt digital, networked, intelligent and HD technology. 1.0.4 Design, construction and acceptance of project of civil closed monitoring television system shall not only comply with the requirements of this code, but also comply with those in the current relevant ones of the nation.
Contents 1 General Provisions 2 Terms 3 Project Design of System 3.1 General Requirements 3.2 Front End Part 3.3 Transmission Part 3.4 Surveillance & Control Center 3.5 Power Supply, Earthing and Safety Protection 4 Project Construction of the System 4.1 General Requirements 4.2 Installation of Front-end Equipment 4.3 Cable Laying 4.4 Surveillance & Control Sub-Center 4.5 Power Supply and Earthing 5 Project Acceptance of System 5.1 General Provisions 5.2 The Construction Quality of Systems Project. 5.3 Detection towards the Performance of System Functions. 5.4 Subjective Assessment towards the Image Quality. 5.5 Objective Test towards the Image Quality. 5.6 Files of Completion Acceptance Appendix A The Test Sequence of the Digital Image Appendix B System Project Acceptance Certificate Wording Explanation List of Quoted Standards
GB 50198-2011 is referred in:
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50049-2011 Code for design of small fossil fired power plant
* GB/T 2887-2011 General specification for computer field
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50049-2011 Code for design of small fossil fired power plant
* GB/T 2887-2011 General specification for computer field
* GB 50606-2010 Code for installation of Intelligented building system
* GB 50049-2011 Code for design of small fossil fired power plant
* GA 38-2015 Security requirements for bank commercial premises
* GB 50462-2015 Code for construction and acceptance of data center infrastructure
*GB 50348-2018 Technisal code for engineering of security and protection system
*GA 1517-2018 Security requirements for gold commercial premises
Code of China
Standard
GB 50198-2011  Technical code for project of civil closed circuit monitoring television system (English Version)
Standard No.GB 50198-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count13000 words
Price(USD)120.0
Implemented on2012-6-1
Deliveryvia email in 1 business day
Detail of GB 50198-2011
Standard No.
GB 50198-2011
English Name
Technical code for project of civil closed circuit monitoring television system
Chinese Name
民用闭路监视电视系统工程技术规范
Chinese Classification
P77
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2011-8-26
Implemented on
2012-6-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB 50198-1994 Technical code for requnation of civil closed circuit monitoring TV system
Language
English
File Format
PDF
Word Count
13000 words
Price(USD)
120.0
Keywords
GB 50198-2011, GB/T 50198-2011, GBT 50198-2011, GB50198-2011, GB 50198, GB50198, GB/T50198-2011, GB/T 50198, GB/T50198, GBT50198-2011, GBT 50198, GBT50198
Introduction of GB 50198-2011
1 General Provisions 1.0.1 This code is formulated with a view to implementing the technical economy policy of the nation, regulating the project design, construction and acceptance of civil closed monitoring television system (hereinafter referred to as system), achieving advanced technology, economy and rationality, safety and usability, guaranteed quality, energy conservation and environmental protection . 1.0.2 This code is applicable to the design, construction and acceptance of new, renovation and extension project of closed circuit television system with the main purpose of civil monitoring. 1.0.3 The system should adopt digital, networked, intelligent and HD technology. 1.0.4 Design, construction and acceptance of project of civil closed monitoring television system shall not only comply with the requirements of this code, but also comply with those in the current relevant ones of the nation.
Contents of GB 50198-2011
Contents 1 General Provisions 2 Terms 3 Project Design of System 3.1 General Requirements 3.2 Front End Part 3.3 Transmission Part 3.4 Surveillance & Control Center 3.5 Power Supply, Earthing and Safety Protection 4 Project Construction of the System 4.1 General Requirements 4.2 Installation of Front-end Equipment 4.3 Cable Laying 4.4 Surveillance & Control Sub-Center 4.5 Power Supply and Earthing 5 Project Acceptance of System 5.1 General Provisions 5.2 The Construction Quality of Systems Project. 5.3 Detection towards the Performance of System Functions. 5.4 Subjective Assessment towards the Image Quality. 5.5 Objective Test towards the Image Quality. 5.6 Files of Completion Acceptance Appendix A The Test Sequence of the Digital Image Appendix B System Project Acceptance Certificate Wording Explanation List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50198-2011, GB/T 50198-2011, GBT 50198-2011, GB50198-2011, GB 50198, GB50198, GB/T50198-2011, GB/T 50198, GB/T50198, GBT50198-2011, GBT 50198, GBT50198