2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50671-2011
GB 50671-2011   Code for design of aircraft paint hangar (English Version)
Standard No.: GB 50671-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:2012-5-1 Delivery: via email in 1 business day

→ → →

,,2012-5-1,1411381818967095569F2AF9F0CE9
Standard No.: GB 50671-2011
English Name: Code for design of aircraft paint hangar
Chinese Name: 飞机喷漆机库设计规范
Chinese Classification: P68    Aviation and aerospace engineering
Professional Classification: GB    National Standard
Source Content Issued by: MOHURD
Issued on: 2011-4-2
Implemented on: 2012-5-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is prepared for the purpose of ensuring advanced technology of design, economic feasibility and safety and usability of aircraft paint hangar, and meeting the requirements of occupational health and safety, environmental protection and energy conservation and emission reduction. 1.0.2 This code is applicable to the design of newly-built, extended and rebuilt aircraft paint hangar. 1.0.3 The design of aircraft paint hangar shall comply with the requirements stipulated in this code and with those stipulated in the current relevant standards of the nation. 2 Terms 2.0.1 aircraft paint hangar the building used for painting and de-painting aircraft complete machine or major components such as wing, vertical tail plane, tail plane and body section 2.0.2 aircraft paint area the area in aircraft paint hangar, which is used for de-painting and painting of aircraft complete machine or major component 2.0.3 working area the area for carrying out preparation, cleaning, polishing, de-painting, painting and drying of aircraft or major components along the shape of aircraft complete machine or major component with certain safety production distance considered 2.0.4 production auxiliary room the room outside the aircraft paint area, which is used to meet the painting production requirements 2.0.5 unfueled aircraft the aircraft with aviation fuel quantity less than 0.5% of total capacity of fuel tank and pipeline 2.0.6 air supply system for mask the compressed air system used for respirator 3 Classification for Aircraft Paint Hangars and Explosion Hazard Zones 3.0.1 Aircraft paint hangar may be classified into Classes I, II and III, and the allowable maximum building area of aircraft paint area in various aircraft paint hangars shall be in accordance with those specified in Table 3.1.1.
Foreword II 1 General Provisions 2 Terms 3 Classification for Aircraft Paint Hangars and Explosion Hazard Zones 4 Process 4.1 Process Layout 4.2 Process Equipment 4.3 Requirement for the Environment and Facilities of Paint Area 5 Architecture and Structure 5.1 General Plan Layout 5.2 Plan Layout and Fire Protection 5.3 Architecture 6 Water Supply and Drainage and Fire Protection Facilities 6.1 Water Supply 6.2 Drainage 6.3 Fire Protection Facilities 7 Heating, Ventilation and Air Conditioning 7.1 Heating 7.2 Production Heat Supply and Air Humidification 7.3 Ventilation 7.4 Air Conditioning 7.5 Fire Protection and Explosion Proof 7.6 Monitoring and Control 8 Compressed Air Supply 9 Electrical 9.1 Power Supply and Distribution 9.2 Lighting 9.3 Lightning Protection, Earthing and Equipotential 9.4 Electrical Control 9.5 Automatic Fire Alarming and Control 9.6 Telecommunication and Safety Explanation of Wording in This Code List of Quoted Standards
Code of China
Standard
GB 50671-2011  Code for design of aircraft paint hangar (English Version)
Standard No.GB 50671-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on2012-5-1
Deliveryvia email in 1 business day
Detail of GB 50671-2011
Standard No.
GB 50671-2011
English Name
Code for design of aircraft paint hangar
Chinese Name
飞机喷漆机库设计规范
Chinese Classification
P68
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2011-4-2
Implemented on
2012-5-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
GB 50671-2011, GB/T 50671-2011, GBT 50671-2011, GB50671-2011, GB 50671, GB50671, GB/T50671-2011, GB/T 50671, GB/T50671, GBT50671-2011, GBT 50671, GBT50671
Introduction of GB 50671-2011
1 General Provisions 1.0.1 This code is prepared for the purpose of ensuring advanced technology of design, economic feasibility and safety and usability of aircraft paint hangar, and meeting the requirements of occupational health and safety, environmental protection and energy conservation and emission reduction. 1.0.2 This code is applicable to the design of newly-built, extended and rebuilt aircraft paint hangar. 1.0.3 The design of aircraft paint hangar shall comply with the requirements stipulated in this code and with those stipulated in the current relevant standards of the nation. 2 Terms 2.0.1 aircraft paint hangar the building used for painting and de-painting aircraft complete machine or major components such as wing, vertical tail plane, tail plane and body section 2.0.2 aircraft paint area the area in aircraft paint hangar, which is used for de-painting and painting of aircraft complete machine or major component 2.0.3 working area the area for carrying out preparation, cleaning, polishing, de-painting, painting and drying of aircraft or major components along the shape of aircraft complete machine or major component with certain safety production distance considered 2.0.4 production auxiliary room the room outside the aircraft paint area, which is used to meet the painting production requirements 2.0.5 unfueled aircraft the aircraft with aviation fuel quantity less than 0.5% of total capacity of fuel tank and pipeline 2.0.6 air supply system for mask the compressed air system used for respirator 3 Classification for Aircraft Paint Hangars and Explosion Hazard Zones 3.0.1 Aircraft paint hangar may be classified into Classes I, II and III, and the allowable maximum building area of aircraft paint area in various aircraft paint hangars shall be in accordance with those specified in Table 3.1.1.
Contents of GB 50671-2011
Foreword II 1 General Provisions 2 Terms 3 Classification for Aircraft Paint Hangars and Explosion Hazard Zones 4 Process 4.1 Process Layout 4.2 Process Equipment 4.3 Requirement for the Environment and Facilities of Paint Area 5 Architecture and Structure 5.1 General Plan Layout 5.2 Plan Layout and Fire Protection 5.3 Architecture 6 Water Supply and Drainage and Fire Protection Facilities 6.1 Water Supply 6.2 Drainage 6.3 Fire Protection Facilities 7 Heating, Ventilation and Air Conditioning 7.1 Heating 7.2 Production Heat Supply and Air Humidification 7.3 Ventilation 7.4 Air Conditioning 7.5 Fire Protection and Explosion Proof 7.6 Monitoring and Control 8 Compressed Air Supply 9 Electrical 9.1 Power Supply and Distribution 9.2 Lighting 9.3 Lightning Protection, Earthing and Equipotential 9.4 Electrical Control 9.5 Automatic Fire Alarming and Control 9.6 Telecommunication and Safety Explanation of Wording in This Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50671-2011, GB/T 50671-2011, GBT 50671-2011, GB50671-2011, GB 50671, GB50671, GB/T50671-2011, GB/T 50671, GB/T50671, GBT50671-2011, GBT 50671, GBT50671