2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 16507.5-2013
GB/T 16507.5-2013   Water-tube Boilers - Part 5: Fabrication (English Version)
Standard No.: GB/T 16507.5-2013 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 14000 words Translation Price(USD):350.0 remind me the price change

Email:

Implemented on:2014-7-1 Delivery: via email in 1 business day

→ → →

,1996-12-1,2014-7-1,14113818239240633E01A9EB470D6
Standard No.: GB/T 16507.5-2013
English Name: Water-tube Boilers - Part 5: Fabrication
Chinese Name: 水管锅炉 第5部分:制造
Chinese Classification: J98    Boiler and its auxiliary equipment
Professional Classification: GB    National Standard
ICS Classification: 27.060.30 27.060.30    Boilers and heat exchangers 27.060.30
Source Content Issued by: AQSIQ;SAC
Issued on: 2013-12-31
Implemented on: 2014-7-1
Status: superseded
Superseded by:GB/T 16507.5-2022 Water-tube boilers—Part 5: Fabrication
GB/T 16507-1996 Rules for Construction of Stationary Boilers
Superseded on:1996-12-1
Superseding::GB/T 16507-1996
Target Language: English
File Format: PDF
Word Count: 14000 words
Translation Price(USD): 350.0
Delivery: via email in 1 business day
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. GB/T 16507 “Water-Tube Boilers” covers the following eight parts: - Part 1: General Requirement; - Part 2: Materials; - Part 3: Structure Design; - Part 4: Strength Calculation of Pressure Parts; - Part 5: Fabrication; - Part 6: Inspection, Testing and Acceptance; - Part 7: Safety Appurtenances and Instruments; - Part 8: Installation and Operation. This part is Part 5 of GB/T 16507. This part was drafted according to the rules specified in GB/T 1.1-2009. This part partially supersedes GB/T 16507-1996 with the main technical differences as follows: - "Terms and Definitions" were added (see Chapter 3); - "Basic Requirements" were added (see Chapter 4); - Fabrication of shell boilers in original Chapter 7 were deleted; - Requirements for the assessment of bent tubes were refined; - "Tests of Pipe-bending Process" were added (see Appendix A); - "Additional Requirements for the Welding Procedure Qualification for Membrane Tube Panel of Boilers" were added (see Appendix B); - "Material Classification and Grouping for Welding Procedure Qualification of Boilers" were added (see Appendix C). This part was proposed by and is under the jurisdiction of National Technical Committee on Boilers and Pressure Vessels of Standardization Administration of China (SAC/TC 262). Chief drafting organization: Shanghai Boiler Works Co., Ltd. Participating drafting organizations of this part: Dongfang Boiler Group Co., Ltd., Harbin Boiler Company Limited, Babcock & Wilcox Beijing Company Ltd., Shanghai Power Equipment Research Institute, Wuhan Boiler Co., Ltd., Wuxi Huaguang Boiler Co., Ltd. and Hangzhou Boiler Group Co., Ltd. Chief drafting staff of this part: Ye Shangyun, Jiang Xiuhua, Gu Weihong, Wang Dongping, Zhou Qiang, Zhang Qi, Zhang Rui, Lu Yi, Fu Chunxin, Zhang Shuixing, Ma Hong and Luo Fei. The previous edition of the standard superseded by this part is as follows: - GB/T 16507-1996. NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA 中华人民共和国国家标准 GB/T 16507.5-2013 Partially supersedes GB/T 16507-1996 Water-Tube Boilers - Part 5: Fabrication 水管锅炉 第5部分:制造 1 Scope This part of GB/T 16507 specifies requirements about the marking, cold and hot forming, expansion connection, welding and heat treatment, etc. of water-tube boilers during fabrication. This part is applicable to the fabrication of water-tube boilers as defined in GB/T 16507.1. 2 Normative References The following referenced documents are indispensable for the application of this part. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 985.1 Recommended Joint Preparation for Gas Welding Manual Metal Arc Welding Gas-shield Arc Welding and Beam Welding GB/T 985.2 Recommended Joint Preparation for Submerged Arc Welding GB/T 2652 Tensile Test Methods on Weld and Deposited Metal GB/T 3101.1 Tolerances for Fasteners - Bolts, Screws, Studs and Nuts GB/T 16507.1 Water-Tube Boilers - Part 1: General Requirement GB/T 16507.2 Water-Tube Boilers - Part 2: Materials GB/T 16507.3 Water-Tube Boilers - Part 3: Structure Design GB/T 16507.4 Water-Tube Boilers - Part 4: Strength Calculation of Pressure Parts GB/T 16507.6 Water-Tube Boilers - Part 6: Inspection, Testing and Acceptance JB/T 3223 Rules of Quality Management of Welding Materials JB/T 9626 Specification for Boiler Forging NB/T 47014 Welding Procedure Qualification for Pressure Equipment NB/T 47016 Mechanical Property Tests of Product Welded Test Coupons for Pressure Equipment NB/T 47018 Technical Permission of Welding Materials for Pressure Equipment TSG G0001 Boiler Safety Technical Supervision Administration Regulation 3 Terms and Definitions For the purposes of this document, the terms and definitions defined in GB/T 16507.1 and the following ones apply. 3.1 Cold forming The plastic deformation processing conducted below the recrystallization temperature of work piece material. In engineering practice, the plastic deformation conducted below the environmental temperature are often called cold forming; and the plastic deformation processing between cold forming and hot forming are referred to as warm forming. 3.2 Hot forming The plastic deformation processing conducted above the recrystallization temperature of work piece material. 3.3 Tube forming The fabricating process, like pipe bending, upsetting, necking and flaring. 4 Basic Requirements 4.1 The boiler manufacturer shall have corresponding manufacturing license required in GB/T 16507.1; welding and non-destructive inspection personnel shall have corresponding qualification for personnel of special equipment and shall be trained and managed according to relevant requirements; personnel in charge of lifting and transportation shall also fulfill the qualification requirements for safety operation on the post. 4.2 The structure of boiler pressure components shall meet those specified in GB/T 16507.3 and the strength calculation shall meet the requirements of GB/T 16507.4. 4.3 The fabrication document and the qualified drawing shall meet the production condition of the manufacturer. 4.4 The fabrication of pressure components shall be in proper process and method and free from additional stress and injurious defects which will influence the safety and use. 4.5 All the equipment and instruments involved in the fabrication of boiler pressure components shall meet the given precision and be tested or corrected periodically. 4.6 Raw materials shall meet the requirements of both GB/T 16507.2 and the design drawing. 5 Marking 5.1 Material marking 5.1.1 Procedures for identifying the materials of pressure components and main bearing members shall be formulated. 5.1.2 The material marking for main pressure components of boils (drum, head, header and tubes with the nominal outside diameter larger than or equal to 219mm) shall be traceable to the material quality certificate, and for other pressure components (tubes with the nominal outside diameter less than 219mm) and non-pressure but bearing load components (supports and hangers on drums and header products) shall be easy to be identified so as to avoid the mixture of materials. 5.2 Material marking transfer During fabrication, material marking shall be reserved. Before cutting of materials of boiler pressure components, marking shall be transferred and shall be easy to identify. 5.3 Markings in the fabrication 5.3.1 There are temporary markings and permanent markings in the product fabrication. 5.3.2 Welding markings and non-destructive testing markings shall be reserved as permanent markings; if markings are covered during fabrication or lost as the result of processing, marking transfer shall be done. 5.4 Marking method 5.4.1 The follow marking methods or their combinations shall be adopted: a) Steel seal; b) Vibration etching or other etching tools; c) Marking by painting or with markers; d) Other methods causing no damage to the safety of boilers (e.g. sticking ticket). 5.4.2 Steel impression marking shall not be used under the following conditions: a) The tube made of stainless steel and less than 5mm in wall thickness; b) In the area of inner and outer arcs of tube bend; c) Materials on which steel impression marking are prohibited by the customer. 5.4.3 Positioning maps may be used if welding marking and non-destructive testing marking cannot be marked near the weld.
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 Basic Requirements 5 Marking 6 Cold and Hot Forming 7 Expansion Connection 8 Welding 9 Heat Treatment Appendix A (Informative) Tests of Tube Bending Process Appendix B (Normative) Additional Requirements for the Welding Procedure Qualification for Membrane Panel of Boilers Appendix C (Normative) Material Classification and Grouping for Welding Procedure Qualification of Boilers
Referred in GB/T 16507.5-2013:
*GB/T 985.1-2008 Recommended Joint Preparation for Gas Welding, Manual Metal Arc
*GB/T 985.2-2008 Recommended Joint Preparation for Submerged Arc Welding
*GB/T 2652-2022 Destructive tests on welds in metallic materials—Longitudinal tensile test on weld metal in fusion welded joints
*GBT3101.1-
*GB/T 16507.1-2022 Water-tube boilers—Part 1: General requirements
*GB/T 16507.2-2022 Water-tube boilers—Part 2: Materials
*GB/T 16507.3-2022 Water-tube boilers—Part 3: Structure design
*GB/T 16507.4-2022 Water-tube boilers—Part 4: Strength calculation of pressure parts
*GB/T 16507.6-2022 Water-tube boilers—Part 6: Inspection, testing and acceptance
*JB/T 3223-2017 Welding consumables quality management procedures
*JB/T 9626-1999 Specification for Boiler Forging
*NB/T 47014-2011 Welding procedure qualification for pressure equipment
*NB/T 47016-2011 Mechanical Property Tests of Product Welded Test Coupons for Pressure Equipments
*NB/T 47018-2011 Technical permission of welding materials for pressure equipment
*TSG G0001-2012/XG1-2017 Boiler Safety Technical Supervision Administration Regulation
GB/T 16507.5-2013 is referred in:
* GB/T 16507.1-2013 Water-tube Boilers - Part 1: General Requirement
* GB/T 16507.1-2013 Water-tube Boilers - Part 1: General Requirement
* GB/T 16507-2013 Water-tube boilers (GB/T 16507.1~16507.8-2013)
* GB/T 16507-2013 Water-tube boilers (GB/T 16507.1~16507.8-2013)
* GB/T 16507.1-2013 Water-tube Boilers - Part 1: General Requirement
* GB/T 16507.6-2013 Water-tube Boilers - Part 6: Inspection, Testing and Acceptance
* GB/T 16507.4-2013 Water-tube boilers—Part 4:Strength calculation of pressure parts
* GB/T 16507-2013 Water-tube boilers (GB/T 16507.1~16507.8-2013)
* GB/T 16507.1-2013 Water-tube Boilers - Part 1: General Requirement
* GB/T 16507-2013 Water-tube boilers (GB/T 16507.1~16507.8-2013)
* GB/T 16507.6-2013 Water-tube Boilers - Part 6: Inspection, Testing and Acceptance
* GB/T 16508.4-2013 Shell Boilers - Part 4: Fabrication, Inspection and Acceptance
Code of China
Standard
GB/T 16507.5-2013  Water-tube Boilers - Part 5: Fabrication (English Version)
Standard No.GB/T 16507.5-2013
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count14000 words
Price(USD)350.0
Implemented on2014-7-1
Deliveryvia email in 1 business day
Detail of GB/T 16507.5-2013
Standard No.
GB/T 16507.5-2013
English Name
Water-tube Boilers - Part 5: Fabrication
Chinese Name
水管锅炉 第5部分:制造
Chinese Classification
J98
Professional Classification
GB
ICS Classification
Issued by
AQSIQ;SAC
Issued on
2013-12-31
Implemented on
2014-7-1
Status
superseded
Superseded by
GB/T 16507.5-2022 Water-tube boilers—Part 5: Fabrication
GB/T 16507-1996 Rules for Construction of Stationary Boilers
Superseded on
1996-12-1
Abolished on
Superseding
:GB/T 16507-1996
Language
English
File Format
PDF
Word Count
14000 words
Price(USD)
350.0
Keywords
GB/T 16507.5-2013, GB 16507.5-2013, GBT 16507.5-2013, GB/T16507.5-2013, GB/T 16507.5, GB/T16507.5, GB16507.5-2013, GB 16507.5, GB16507.5, GBT16507.5-2013, GBT 16507.5, GBT16507.5
Introduction of GB/T 16507.5-2013
Codeofchina.com is in charge of this English translation. In case of any doubt about the English translation, the Chinese original shall be considered authoritative. GB/T 16507 “Water-Tube Boilers” covers the following eight parts: - Part 1: General Requirement; - Part 2: Materials; - Part 3: Structure Design; - Part 4: Strength Calculation of Pressure Parts; - Part 5: Fabrication; - Part 6: Inspection, Testing and Acceptance; - Part 7: Safety Appurtenances and Instruments; - Part 8: Installation and Operation. This part is Part 5 of GB/T 16507. This part was drafted according to the rules specified in GB/T 1.1-2009. This part partially supersedes GB/T 16507-1996 with the main technical differences as follows: - "Terms and Definitions" were added (see Chapter 3); - "Basic Requirements" were added (see Chapter 4); - Fabrication of shell boilers in original Chapter 7 were deleted; - Requirements for the assessment of bent tubes were refined; - "Tests of Pipe-bending Process" were added (see Appendix A); - "Additional Requirements for the Welding Procedure Qualification for Membrane Tube Panel of Boilers" were added (see Appendix B); - "Material Classification and Grouping for Welding Procedure Qualification of Boilers" were added (see Appendix C). This part was proposed by and is under the jurisdiction of National Technical Committee on Boilers and Pressure Vessels of Standardization Administration of China (SAC/TC 262). Chief drafting organization: Shanghai Boiler Works Co., Ltd. Participating drafting organizations of this part: Dongfang Boiler Group Co., Ltd., Harbin Boiler Company Limited, Babcock & Wilcox Beijing Company Ltd., Shanghai Power Equipment Research Institute, Wuhan Boiler Co., Ltd., Wuxi Huaguang Boiler Co., Ltd. and Hangzhou Boiler Group Co., Ltd. Chief drafting staff of this part: Ye Shangyun, Jiang Xiuhua, Gu Weihong, Wang Dongping, Zhou Qiang, Zhang Qi, Zhang Rui, Lu Yi, Fu Chunxin, Zhang Shuixing, Ma Hong and Luo Fei. The previous edition of the standard superseded by this part is as follows: - GB/T 16507-1996. NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA 中华人民共和国国家标准 GB/T 16507.5-2013 Partially supersedes GB/T 16507-1996 Water-Tube Boilers - Part 5: Fabrication 水管锅炉 第5部分:制造 1 Scope This part of GB/T 16507 specifies requirements about the marking, cold and hot forming, expansion connection, welding and heat treatment, etc. of water-tube boilers during fabrication. This part is applicable to the fabrication of water-tube boilers as defined in GB/T 16507.1. 2 Normative References The following referenced documents are indispensable for the application of this part. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 985.1 Recommended Joint Preparation for Gas Welding Manual Metal Arc Welding Gas-shield Arc Welding and Beam Welding GB/T 985.2 Recommended Joint Preparation for Submerged Arc Welding GB/T 2652 Tensile Test Methods on Weld and Deposited Metal GB/T 3101.1 Tolerances for Fasteners - Bolts, Screws, Studs and Nuts GB/T 16507.1 Water-Tube Boilers - Part 1: General Requirement GB/T 16507.2 Water-Tube Boilers - Part 2: Materials GB/T 16507.3 Water-Tube Boilers - Part 3: Structure Design GB/T 16507.4 Water-Tube Boilers - Part 4: Strength Calculation of Pressure Parts GB/T 16507.6 Water-Tube Boilers - Part 6: Inspection, Testing and Acceptance JB/T 3223 Rules of Quality Management of Welding Materials JB/T 9626 Specification for Boiler Forging NB/T 47014 Welding Procedure Qualification for Pressure Equipment NB/T 47016 Mechanical Property Tests of Product Welded Test Coupons for Pressure Equipment NB/T 47018 Technical Permission of Welding Materials for Pressure Equipment TSG G0001 Boiler Safety Technical Supervision Administration Regulation 3 Terms and Definitions For the purposes of this document, the terms and definitions defined in GB/T 16507.1 and the following ones apply. 3.1 Cold forming The plastic deformation processing conducted below the recrystallization temperature of work piece material. In engineering practice, the plastic deformation conducted below the environmental temperature are often called cold forming; and the plastic deformation processing between cold forming and hot forming are referred to as warm forming. 3.2 Hot forming The plastic deformation processing conducted above the recrystallization temperature of work piece material. 3.3 Tube forming The fabricating process, like pipe bending, upsetting, necking and flaring. 4 Basic Requirements 4.1 The boiler manufacturer shall have corresponding manufacturing license required in GB/T 16507.1; welding and non-destructive inspection personnel shall have corresponding qualification for personnel of special equipment and shall be trained and managed according to relevant requirements; personnel in charge of lifting and transportation shall also fulfill the qualification requirements for safety operation on the post. 4.2 The structure of boiler pressure components shall meet those specified in GB/T 16507.3 and the strength calculation shall meet the requirements of GB/T 16507.4. 4.3 The fabrication document and the qualified drawing shall meet the production condition of the manufacturer. 4.4 The fabrication of pressure components shall be in proper process and method and free from additional stress and injurious defects which will influence the safety and use. 4.5 All the equipment and instruments involved in the fabrication of boiler pressure components shall meet the given precision and be tested or corrected periodically. 4.6 Raw materials shall meet the requirements of both GB/T 16507.2 and the design drawing. 5 Marking 5.1 Material marking 5.1.1 Procedures for identifying the materials of pressure components and main bearing members shall be formulated. 5.1.2 The material marking for main pressure components of boils (drum, head, header and tubes with the nominal outside diameter larger than or equal to 219mm) shall be traceable to the material quality certificate, and for other pressure components (tubes with the nominal outside diameter less than 219mm) and non-pressure but bearing load components (supports and hangers on drums and header products) shall be easy to be identified so as to avoid the mixture of materials. 5.2 Material marking transfer During fabrication, material marking shall be reserved. Before cutting of materials of boiler pressure components, marking shall be transferred and shall be easy to identify. 5.3 Markings in the fabrication 5.3.1 There are temporary markings and permanent markings in the product fabrication. 5.3.2 Welding markings and non-destructive testing markings shall be reserved as permanent markings; if markings are covered during fabrication or lost as the result of processing, marking transfer shall be done. 5.4 Marking method 5.4.1 The follow marking methods or their combinations shall be adopted: a) Steel seal; b) Vibration etching or other etching tools; c) Marking by painting or with markers; d) Other methods causing no damage to the safety of boilers (e.g. sticking ticket). 5.4.2 Steel impression marking shall not be used under the following conditions: a) The tube made of stainless steel and less than 5mm in wall thickness; b) In the area of inner and outer arcs of tube bend; c) Materials on which steel impression marking are prohibited by the customer. 5.4.3 Positioning maps may be used if welding marking and non-destructive testing marking cannot be marked near the weld.
Contents of GB/T 16507.5-2013
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 Basic Requirements 5 Marking 6 Cold and Hot Forming 7 Expansion Connection 8 Welding 9 Heat Treatment Appendix A (Informative) Tests of Tube Bending Process Appendix B (Normative) Additional Requirements for the Welding Procedure Qualification for Membrane Panel of Boilers Appendix C (Normative) Material Classification and Grouping for Welding Procedure Qualification of Boilers
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 16507.5-2013, GB 16507.5-2013, GBT 16507.5-2013, GB/T16507.5-2013, GB/T 16507.5, GB/T16507.5, GB16507.5-2013, GB 16507.5, GB16507.5, GBT16507.5-2013, GBT 16507.5, GBT16507.5