This part of GB/T 16507 specifies requirements about the marking, cold and hot forming, expansion connection, welding and heat treatment, etc. of water-tube boilers during fabrication.
This part is applicable to the fabrication of water-tube boilers as defined in GB/T 16507.1.
Foreword I
1 Scope 1
2 Normative References 1
3 Terms and Definitions 2
4 Basic Requirements 2
5 Marking 2
6 Cold and Hot Forming 3
7 Expansion Connection 18
8 Welding 21
9 Heat Treatment 27
Appendix A (Informative) Tests of Tube Bending Process 35
Appendix B (Normative) Additional Requirements for the Welding Procedure Qualification for Membrane Panel of Boilers 38
Appendix C (Normative) Material Classification and Grouping for Welding Procedure Qualification of Boilers 40
This part of GB/T 16507 specifies requirements about the marking, cold and hot forming, expansion connection, welding and heat treatment, etc. of water-tube boilers during fabrication.
This part is applicable to the fabrication of water-tube boilers as defined in GB/T 16507.1.
Contents of GB/T 16507.5-2013
Foreword I
1 Scope 1
2 Normative References 1
3 Terms and Definitions 2
4 Basic Requirements 2
5 Marking 2
6 Cold and Hot Forming 3
7 Expansion Connection 18
8 Welding 21
9 Heat Treatment 27
Appendix A (Informative) Tests of Tube Bending Process 35
Appendix B (Normative) Additional Requirements for the Welding Procedure Qualification for Membrane Panel of Boilers 38
Appendix C (Normative) Material Classification and Grouping for Welding Procedure Qualification of Boilers 40