2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JGJ 6-2011
JGJ 6-2011   Technical code for tall building raft foundations and box foundations (English Version)
Standard No.: JGJ 6-2011 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 25000 words Translation Price(USD):620.0 remind me the price change

Email:

Implemented on:2011-12-1 Delivery: via email in 1 business day

→ → →

,,2011-12-1,1411377541871156B7F439472F8F4
Standard No.: JGJ 6-2011
English Name: Technical code for tall building raft foundations and box foundations
Chinese Name: 高层建筑筏形与箱形基础技术规范
Professional Classification: JG    Professional Standard - Building
Source Content Issued by: MOC
Issued on: 2011-01-28
Implemented on: 2011-12-1
Status: valid
Superseding:JGJ 6-1999 Technical code for tall building box foundations and raft foundations
Target Language: English
File Format: PDF
Word Count: 25000 words
Translation Price(USD): 620.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with a view to achieving safety and usability, environmental protection, energy saving, economy and rationality, quality guarantee and advanced technology in the design and construction of tall building raft foundation and box foundation. 1.0.2 This code is applicable to the design, construction and monitoring of tall building raft foundations and box foundations. 1.0.3 For the design and construction of tall building raft foundations and box foundations, the geological conditions of the whole building site, construction method, construction sequence, service requirements and mutual influence with adjacent buildings shall be comprehensively analyzed. 1.0.4 The design, construction and monitoring of tall building raft foundations and box foundations shall not only comply with the requirements of this code, but also those in the current relevant ones of the nation.
1 General Provisions 1 2 Terms and Symbols 1 2.1 Terms 1 2.2 Symbols 1 3 Basic Requirement 4 4 Subsoil Investigation 5 4.1 General Requirement 5 4.2 Requirements of Exploration 7 4.3 Laboratory and In-situ Tests 9 4.4 Groundwater 9 5 Calculation of Subsoil 11 5.1 General Requirement 11 5.2 Embedded Depth of Foundation 12 5.3 Calculation of Bearing Capacity 12 5.4 Calculation of Deformation 14 5.5 Calculation of Stability 17 6 Requirements of Structural Design and Detail 18 6.1 General Requirement 18 6.2 Raft Foundation 21 6.3 Box Foundation 29 6.4 Piled Raft Foundation and Piled Box Foundation 35 7 Construction 37 7.1 General Requirement 37 7.2 Groundwater Control 39 7.3 Excavation of Foundation Pit 41 7.4 Construction of Raft Foundation and Box Foundation 42 8 Inspection and Monitoring 44 8.1 General Requirement 44 8.2 Construction Inspection 44 8.3 Foundation Excavations Inspection 45 8.4 Monitoring of Building Settlement 45 Appendix A Essentials of Subgrade Coefficient from Load Test 47 Appendix B Additional Stress Coefficient α and Average Additional Stress Coefficient 49 Appendix C Coefficient δ for Settlement Calculation Using E0 65 Appendix D Calculation for the Perimeter and Polar Moment of Inertia of the Critical Punching Section 66 Appendix E Coefficient of Subgrade Reaction 69 Appendix F Simplified Calculation Method for Integral Bending Moment of Raft Foundation and Box Foundation 73 Explanation of Wording in this Code 75 List of Quoted Standards 76
Referred in JGJ 6-2011:
* GB 50007-2011 Code for design of building foundation
* GB 50009-2012 Load Code for the Design of Building Structures
* GB 50010-2010 Code for design of concrete structures
* GB 50011-2010 Code for seismic design of buildings
* GB 50021-2001 Code for investigation of geotechnical engineering (2009 version)
* GB 50038-2005 Code for design of civil air defence basement
* GB 50164-2011 Standard of quality control of concrete
* GB 50202-2002 Code for Acceptance of Construction Quality of Building Foundation
* GB 50204-2002(2011) Code for acceptance of constructional quallty of concrete structures
* JGJ 8-2007 Code for Deformation Measurement of Building and Structure
* JGJ 72-2004 Specification for geotechnical investigation of tall buildings
* JGJ 94-2008 Technical Code for Building Pile Foundations
JGJ 6-2011 is referred in:
* JGJ 3-2010 Technical Specification for Concrete Structures of Tall Building
* JGJ 3-2010 Technical Specification for Concrete Structures of Tall Building
Code of China
Standard
JGJ 6-2011  Technical code for tall building raft foundations and box foundations (English Version)
Standard No.JGJ 6-2011
Statusvalid
LanguageEnglish
File FormatPDF
Word Count25000 words
Price(USD)620.0
Implemented on2011-12-1
Deliveryvia email in 1 business day
Detail of JGJ 6-2011
Standard No.
JGJ 6-2011
English Name
Technical code for tall building raft foundations and box foundations
Chinese Name
高层建筑筏形与箱形基础技术规范
Chinese Classification
Professional Classification
JG
ICS Classification
Issued by
MOC
Issued on
2011-01-28
Implemented on
2011-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
JGJ 6-1999 Technical code for tall building box foundations and raft foundations
Language
English
File Format
PDF
Word Count
25000 words
Price(USD)
620.0
Keywords
JGJ 6-2011, JGJ/T 6-2011, JGJT 6-2011, JGJ6-2011, JGJ 6, JGJ6, JGJ/T6-2011, JGJ/T 6, JGJ/T6, JGJT6-2011, JGJT 6, JGJT6
Introduction of JGJ 6-2011
1.0.1 This code is formulated with a view to achieving safety and usability, environmental protection, energy saving, economy and rationality, quality guarantee and advanced technology in the design and construction of tall building raft foundation and box foundation. 1.0.2 This code is applicable to the design, construction and monitoring of tall building raft foundations and box foundations. 1.0.3 For the design and construction of tall building raft foundations and box foundations, the geological conditions of the whole building site, construction method, construction sequence, service requirements and mutual influence with adjacent buildings shall be comprehensively analyzed. 1.0.4 The design, construction and monitoring of tall building raft foundations and box foundations shall not only comply with the requirements of this code, but also those in the current relevant ones of the nation.
Contents of JGJ 6-2011
1 General Provisions 1 2 Terms and Symbols 1 2.1 Terms 1 2.2 Symbols 1 3 Basic Requirement 4 4 Subsoil Investigation 5 4.1 General Requirement 5 4.2 Requirements of Exploration 7 4.3 Laboratory and In-situ Tests 9 4.4 Groundwater 9 5 Calculation of Subsoil 11 5.1 General Requirement 11 5.2 Embedded Depth of Foundation 12 5.3 Calculation of Bearing Capacity 12 5.4 Calculation of Deformation 14 5.5 Calculation of Stability 17 6 Requirements of Structural Design and Detail 18 6.1 General Requirement 18 6.2 Raft Foundation 21 6.3 Box Foundation 29 6.4 Piled Raft Foundation and Piled Box Foundation 35 7 Construction 37 7.1 General Requirement 37 7.2 Groundwater Control 39 7.3 Excavation of Foundation Pit 41 7.4 Construction of Raft Foundation and Box Foundation 42 8 Inspection and Monitoring 44 8.1 General Requirement 44 8.2 Construction Inspection 44 8.3 Foundation Excavations Inspection 45 8.4 Monitoring of Building Settlement 45 Appendix A Essentials of Subgrade Coefficient from Load Test 47 Appendix B Additional Stress Coefficient α and Average Additional Stress Coefficient 49 Appendix C Coefficient δ for Settlement Calculation Using E0 65 Appendix D Calculation for the Perimeter and Polar Moment of Inertia of the Critical Punching Section 66 Appendix E Coefficient of Subgrade Reaction 69 Appendix F Simplified Calculation Method for Integral Bending Moment of Raft Foundation and Box Foundation 73 Explanation of Wording in this Code 75 List of Quoted Standards 76
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JGJ 6-2011, JGJ/T 6-2011, JGJT 6-2011, JGJ6-2011, JGJ 6, JGJ6, JGJ/T6-2011, JGJ/T 6, JGJ/T6, JGJT6-2011, JGJT 6, JGJT6