2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTG F10-2006
JTG F10-2006   Technical Specification for Construction of Highway Subgrades (English Version)
Standard No.: JTG F10-2006 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 43000 words Translation Price(USD):280.0 remind me the price change

Email:

Implemented on:2007-1-1 Delivery: via email in 1 business day

→ → →

,2019-12-1,2007-1-1,14113749951204CAB65222D6268DD
Standard No.: JTG F10-2006
English Name: Technical Specification for Construction of Highway Subgrades
Chinese Name: 公路路基施工技术规范
Chinese Classification: P66    Highway engineering
Professional Classification: JT    Professional Standard - Transport
ICS Classification: 93.08 93.08    Road engineering 93.08
Source Content Issued by: MOT
Issued on: 2006-8-31
Implemented on: 2007-1-1
Status: superseded
Superseded by:JTG/T 3610-2019 Technical Specifications for Construction of Highway Subgrades
Superseded on:2019-12-1
Superseding:JTJ 015-1991 Specifications for Design of Highway Reinforced Earth Engineering
JTJ 016-1993 Technical specifications for Design and construction for Fly ash Embankment
JTJ 017-1996 Technical specifications for design and construction of highway embankment on soft ground
JTJ 033-1995 Technical Specification for Construction of Highway Subgrades
JTJ 035-1991 Technical Specifications for Construction of Highway Reinforced Earth Engineering
Target Language: English
File Format: PDF
Word Count: 43000 words
Translation Price(USD): 280.0
Delivery: via email in 1 business day
1.0.1 This Specification is formulated with a view to improve the technical levels for construction of highway subgrade engineering and to ensure the construction quality. 1.0.2 This Specification is applicable to the construction of newly-built and renovated (extended) subgrade engineering. 1.0.3 The highway subgrade shall meet the strength, stability and durability required by the design. 1.0.4 The construction of highway subgrade must abide by the laws and regulations on national safety production, so as to establish technical safety measures, to promote safety management, to strictly implement the safe operation specification, and therefore, to ensure the safety construction. 1.0.5 The construction of highway subgrade must abide by the laws and regulations of national occupational healthy safety, so as to sound the employees' healthy safety control system and ameliorate the safety conditions of occupational health. 1.0.6 The construction of highway subgrade must abide by relevant laws and regulations on national ecology, environmental protection and land management, so as to protect the geomorphy of the existing vegetation and prevent noise and dust nuisance. Moreover, the construction wastes must be carefully disposed. 1.0.7 The construction of highway subgrade must abide by the laws and regulations on protection of national historical relics; once meeting the cultural relics, the construction shall be ceased immediately, and the site must be well protected and shall be treated carefully together with the organizations all concerned. 1.0.8 Construction management plan shall be prepared before the construction of the highway subgrade. 1.0.9 As for the construction of highway subgrade, new technology, new process, new material and new facilities are encouraged to be adopted while meeting the quality standard. 1.0.10 The subgrade in special road segments should be dynamically constructed. 1.0.11 Not only the requirements stipulated in this Specification, but also those in the current relevant ones of the nation shall be complied with in the construction of highway subgrade.
Contents 1. General provisions 2. Terminologies and symbols 2.1 Terminologies 2.2 Symbols 3. Preparation of construction 3.1 General rules 3.2 Measurement 3.3 Test 3.4 Site clearing 3.5 Test pavement section 4. General subgrade construction 4.1 General rules 4.2 Embankment construction 4.3 Excavation subgrade construction 4.4 Construction of light filler embankment 4.5 Widening of the subgrade 5. Subgrade drainage 5.1 General rules 5.2 Surface drainage 5.3 Underground drainage 5.4 Engineering quality standard of subgrade drainage 6. Special subgrade construction 6.1 General rules 6.2 Construction of wet clay subgrade 6.3 Construction of soft ground subgrade 6.4 Subgrade construction in red-clay region 6.5 Subgrade construction in expansive soil region 6.6 Subgrade construction in loess region 6.7 Subgrade construction in saline soil region 6.8 Subgrade construction in eolian sand and desert regions 6.9 Subgrade Construction in Seasonal Frozen Soil Regions 6.10 Subgrade Construction in Permafrost Regions 6.11 Subgrade Construction along the Drift Ice Section 6.12 Subgrade Construction at Snow Damage Sections 6.13 Subgrade Construction at Landslide Section 6.14 Subgrade Construction at Dilapidation and Rock Stake Section 6.15 Subgrade Construction in Mudflow Region 6.16 Subgrade construction at karst regions 6.17 Subgrade construction at goaf 6.18 Subgrade construction at regions along rivers and brooks 6.19 Subgrade construction at regions with reservoirs 6.20 Subgrade construction at offshore regions 7. Subgrade construction of winter and rainy season 7.1 General rules 7.2 Winter construction 7.3 Rainy season construction 8. Subgrade protection or supporting and retaining 8.1 General rules 8.2 Slope protection 8.3 Protection of subgrade along the river 8.4 Retaining wall 8.5 Side slope anchoring protection 8.6 Brad support 8.7 Friction stake 9. Subgrade Safe Construction and Environmental Protection 9.1 General Rule 9.2 Safe Construction 10. Subgrade Renovation and Handover Acceptance 10.1 Subgrade Renovation 10.2 Handover Acceptance Annex A Explanation of Wording in this Specification
JTG F10-2006 is referred in:
*GB/T 32546-2016 Technical requirements for application of steel slag
Code of China
Standard
JTG F10-2006  Technical Specification for Construction of Highway Subgrades (English Version)
Standard No.JTG F10-2006
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count43000 words
Price(USD)280.0
Implemented on2007-1-1
Deliveryvia email in 1 business day
Detail of JTG F10-2006
Standard No.
JTG F10-2006
English Name
Technical Specification for Construction of Highway Subgrades
Chinese Name
公路路基施工技术规范
Chinese Classification
P66
Professional Classification
JT
ICS Classification
Issued by
MOT
Issued on
2006-8-31
Implemented on
2007-1-1
Status
superseded
Superseded by
JTG/T 3610-2019 Technical Specifications for Construction of Highway Subgrades
Superseded on
2019-12-1
Abolished on
Superseding
JTJ 015-1991 Specifications for Design of Highway Reinforced Earth Engineering
JTJ 016-1993 Technical specifications for Design and construction for Fly ash Embankment
JTJ 017-1996 Technical specifications for design and construction of highway embankment on soft ground
JTJ 033-1995 Technical Specification for Construction of Highway Subgrades
JTJ 035-1991 Technical Specifications for Construction of Highway Reinforced Earth Engineering
Language
English
File Format
PDF
Word Count
43000 words
Price(USD)
280.0
Keywords
JTG F10-2006, JTG/T F10-2006, JTGT F10-2006, JTGF10-2006, JTG F10, JTGF10, JTG/TF10-2006, JTG/T F10, JTG/TF10, JTGTF10-2006, JTGT F10, JTGTF10
Introduction of JTG F10-2006
1.0.1 This Specification is formulated with a view to improve the technical levels for construction of highway subgrade engineering and to ensure the construction quality. 1.0.2 This Specification is applicable to the construction of newly-built and renovated (extended) subgrade engineering. 1.0.3 The highway subgrade shall meet the strength, stability and durability required by the design. 1.0.4 The construction of highway subgrade must abide by the laws and regulations on national safety production, so as to establish technical safety measures, to promote safety management, to strictly implement the safe operation specification, and therefore, to ensure the safety construction. 1.0.5 The construction of highway subgrade must abide by the laws and regulations of national occupational healthy safety, so as to sound the employees' healthy safety control system and ameliorate the safety conditions of occupational health. 1.0.6 The construction of highway subgrade must abide by relevant laws and regulations on national ecology, environmental protection and land management, so as to protect the geomorphy of the existing vegetation and prevent noise and dust nuisance. Moreover, the construction wastes must be carefully disposed. 1.0.7 The construction of highway subgrade must abide by the laws and regulations on protection of national historical relics; once meeting the cultural relics, the construction shall be ceased immediately, and the site must be well protected and shall be treated carefully together with the organizations all concerned. 1.0.8 Construction management plan shall be prepared before the construction of the highway subgrade. 1.0.9 As for the construction of highway subgrade, new technology, new process, new material and new facilities are encouraged to be adopted while meeting the quality standard. 1.0.10 The subgrade in special road segments should be dynamically constructed. 1.0.11 Not only the requirements stipulated in this Specification, but also those in the current relevant ones of the nation shall be complied with in the construction of highway subgrade.
Contents of JTG F10-2006
Contents 1. General provisions 2. Terminologies and symbols 2.1 Terminologies 2.2 Symbols 3. Preparation of construction 3.1 General rules 3.2 Measurement 3.3 Test 3.4 Site clearing 3.5 Test pavement section 4. General subgrade construction 4.1 General rules 4.2 Embankment construction 4.3 Excavation subgrade construction 4.4 Construction of light filler embankment 4.5 Widening of the subgrade 5. Subgrade drainage 5.1 General rules 5.2 Surface drainage 5.3 Underground drainage 5.4 Engineering quality standard of subgrade drainage 6. Special subgrade construction 6.1 General rules 6.2 Construction of wet clay subgrade 6.3 Construction of soft ground subgrade 6.4 Subgrade construction in red-clay region 6.5 Subgrade construction in expansive soil region 6.6 Subgrade construction in loess region 6.7 Subgrade construction in saline soil region 6.8 Subgrade construction in eolian sand and desert regions 6.9 Subgrade Construction in Seasonal Frozen Soil Regions 6.10 Subgrade Construction in Permafrost Regions 6.11 Subgrade Construction along the Drift Ice Section 6.12 Subgrade Construction at Snow Damage Sections 6.13 Subgrade Construction at Landslide Section 6.14 Subgrade Construction at Dilapidation and Rock Stake Section 6.15 Subgrade Construction in Mudflow Region 6.16 Subgrade construction at karst regions 6.17 Subgrade construction at goaf 6.18 Subgrade construction at regions along rivers and brooks 6.19 Subgrade construction at regions with reservoirs 6.20 Subgrade construction at offshore regions 7. Subgrade construction of winter and rainy season 7.1 General rules 7.2 Winter construction 7.3 Rainy season construction 8. Subgrade protection or supporting and retaining 8.1 General rules 8.2 Slope protection 8.3 Protection of subgrade along the river 8.4 Retaining wall 8.5 Side slope anchoring protection 8.6 Brad support 8.7 Friction stake 9. Subgrade Safe Construction and Environmental Protection 9.1 General Rule 9.2 Safe Construction 10. Subgrade Renovation and Handover Acceptance 10.1 Subgrade Renovation 10.2 Handover Acceptance Annex A Explanation of Wording in this Specification
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTG F10-2006, JTG/T F10-2006, JTGT F10-2006, JTGF10-2006, JTG F10, JTGF10, JTG/TF10-2006, JTG/T F10, JTG/TF10, JTGTF10-2006, JTGT F10, JTGTF10