2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/JTJ 034-2000
JTJ 034-2000   Technical Specificaitons for Construction of Highway Roadbases (English Version)
Standard No.: JTJ 034-2000 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 30000 words Translation Price(USD):750.0 remind me the price change

Email:

Implemented on:2000-10-1 Delivery: via email in 1 business day

→ → →

,,2000-10-1,14113736563856137507E198F08FE
Standard No.: JTJ 034-2000
English Name: Technical Specificaitons for Construction of Highway Roadbases
Chinese Name: 公路路面基层施工技术规范
Chinese Classification: R18    Highway protection and maintenance
Professional Classification: JT    Professional Standard - Transport
Source Content Issued by: MOT
Issued on: 2000-06-02
Implemented on: 2000-10-1
Status: valid
Superseded by:JTG/T F20-2015
Superseding:JTJ 034-1993 Technical Specifications for Construction of Highway Roadbases
Target Language: English
File Format: PDF
Word Count: 30000 words
Translation Price(USD): 750.0
Delivery: via email in 1 business day
1.0.1 This standard is formulated in order to adapt to the demand of the highway construction in China, construct the highway road base meet the quality requirements and avoid early damage due to poor quality of road base. 1.0.2 This standard is applicable to the construction of base and sub-base of rigid (cement concrete) pavement, semi-rigid (semi-rigid base asphalt) pavement or flexible (flexible base asphalt or medium- grade) pavement for new and rebuild highway at all classes. 1.0.3 This standard specifies the requirements on the construction / quality control of cement stabilized soil, lime stabilized soil, lime industrial waste stabilized soil, graded crushed rock, graded gravel and dry bound macadam. 1.0.4 When bituminous macadam mixture and bituminous-penetrating crushed rock are used as base, the technical requirement, construction method and quality control hereof shall meet the national standard “Code for Construction and Acceptance of Asphalt Pavement” (GB 50092). 1.0.5 When lean concrete and rolled concrete are used as base, the technical requirement, construction method and quality control hereof shall meet the requirements of the national standard “Specifications for Constructions and Acceptance of Road Concrete Pavement” (GBJ 97). 1.0.6 For all medium-grade pavement with the possibility of rebuilding for improving the grade hereof, the base structure specified in this standard shall be adopted as the main supporting course hereof, and the materials like gravel soil, screenings earth or sandy soil may be used for wearing course on the base structure. 1.0.7 The technical requirement, construction method and quality control of underlayer shall meet the requirements on sub-base of equivalent materials in this standard. 1.0.8 The maximum dry density gained by heavy compaction test shall be adopted as standard dry density in this standard. 1.0.9 The test methods involved in this standard shall meet the requirements on the testing regulations issued by the Ministry of Communications.
Contents Contents 1 General Provisions 2 Terms 3 Cement Stabilized Soil 3.1 General Requirements 3.2 Material 3.3 Composition Design of Composite 3.4 Road-mix Method Construction 3.5 Central-plant Mixing Construction 3.6 Curing and Traffic Control 3.7 Division of Construction Organization and Working Section 3.8 Others 4 Lime Stabilized Soil 4.1 General Provisions 4.2 Materials 4.3 Composite Composition Design 4.4 Road-mix Method Construction 4.5 Central-plant Mixing Construction in Central Station 4.6 Along-road Hand Mixing Method Construction 4.7 Curing and Traffic Control 4.8 Others 5 Lime industrial waste stabilized soil 5.1 General requirements 5.2 Material 5.3 Blend composition design 5.4 Mixed in place method construction 5.5 Master station plant mixing construction 5.6 Artificial road mixing method construction 5.7 Base-curing and traffic control 5.8 Miscellaneous 6 Graded crushed rock 6.1 General requirements 6.2 Materials 6.3 Mixed in place method construction 6.4 Master station centralized plant mixing construction 7 Graded gravel 7.1 General provisions 7.2 Material 7.3 Constructions 8 Dry bound macadam 8.1 General provisions 8.2 Material 8.3 Construction 9 Quality control and inspection acceptance 9.1 General provisions 9.2 Standard test of the material 9.3 Paving test section 9.4 Quality control 9.5 Inspection and acceptance Annex A Rebound deflection evaluation and inspection Annex B Location Determination of Random Sampling on Site
JTJ 034-2000 is referred in:
* GB 50156-2012 Code for design and construction of filling station
* GB 50156-2012 Code for design and construction of filling station
* SH/T 3529-2005 Code of Construction and Acceptance for Vertical Engineering in P
Code of China
Standard
JTJ 034-2000  Technical Specificaitons for Construction of Highway Roadbases (English Version)
Standard No.JTJ 034-2000
Statusvalid
LanguageEnglish
File FormatPDF
Word Count30000 words
Price(USD)750.0
Implemented on2000-10-1
Deliveryvia email in 1 business day
Detail of JTJ 034-2000
Standard No.
JTJ 034-2000
English Name
Technical Specificaitons for Construction of Highway Roadbases
Chinese Name
公路路面基层施工技术规范
Chinese Classification
R18
Professional Classification
JT
ICS Classification
Issued by
MOT
Issued on
2000-06-02
Implemented on
2000-10-1
Status
valid
Superseded by
JTG/T F20-2015
Superseded on
Abolished on
Superseding
JTJ 034-1993 Technical Specifications for Construction of Highway Roadbases
Language
English
File Format
PDF
Word Count
30000 words
Price(USD)
750.0
Keywords
JTJ 034-2000, JTJ/T 034-2000, JTJT 034-2000, JTJ034-2000, JTJ 034, JTJ034, JTJ/T034-2000, JTJ/T 034, JTJ/T034, JTJT034-2000, JTJT 034, JTJT034
Introduction of JTJ 034-2000
1.0.1 This standard is formulated in order to adapt to the demand of the highway construction in China, construct the highway road base meet the quality requirements and avoid early damage due to poor quality of road base. 1.0.2 This standard is applicable to the construction of base and sub-base of rigid (cement concrete) pavement, semi-rigid (semi-rigid base asphalt) pavement or flexible (flexible base asphalt or medium- grade) pavement for new and rebuild highway at all classes. 1.0.3 This standard specifies the requirements on the construction / quality control of cement stabilized soil, lime stabilized soil, lime industrial waste stabilized soil, graded crushed rock, graded gravel and dry bound macadam. 1.0.4 When bituminous macadam mixture and bituminous-penetrating crushed rock are used as base, the technical requirement, construction method and quality control hereof shall meet the national standard “Code for Construction and Acceptance of Asphalt Pavement” (GB 50092). 1.0.5 When lean concrete and rolled concrete are used as base, the technical requirement, construction method and quality control hereof shall meet the requirements of the national standard “Specifications for Constructions and Acceptance of Road Concrete Pavement” (GBJ 97). 1.0.6 For all medium-grade pavement with the possibility of rebuilding for improving the grade hereof, the base structure specified in this standard shall be adopted as the main supporting course hereof, and the materials like gravel soil, screenings earth or sandy soil may be used for wearing course on the base structure. 1.0.7 The technical requirement, construction method and quality control of underlayer shall meet the requirements on sub-base of equivalent materials in this standard. 1.0.8 The maximum dry density gained by heavy compaction test shall be adopted as standard dry density in this standard. 1.0.9 The test methods involved in this standard shall meet the requirements on the testing regulations issued by the Ministry of Communications.
Contents of JTJ 034-2000
Contents Contents 1 General Provisions 2 Terms 3 Cement Stabilized Soil 3.1 General Requirements 3.2 Material 3.3 Composition Design of Composite 3.4 Road-mix Method Construction 3.5 Central-plant Mixing Construction 3.6 Curing and Traffic Control 3.7 Division of Construction Organization and Working Section 3.8 Others 4 Lime Stabilized Soil 4.1 General Provisions 4.2 Materials 4.3 Composite Composition Design 4.4 Road-mix Method Construction 4.5 Central-plant Mixing Construction in Central Station 4.6 Along-road Hand Mixing Method Construction 4.7 Curing and Traffic Control 4.8 Others 5 Lime industrial waste stabilized soil 5.1 General requirements 5.2 Material 5.3 Blend composition design 5.4 Mixed in place method construction 5.5 Master station plant mixing construction 5.6 Artificial road mixing method construction 5.7 Base-curing and traffic control 5.8 Miscellaneous 6 Graded crushed rock 6.1 General requirements 6.2 Materials 6.3 Mixed in place method construction 6.4 Master station centralized plant mixing construction 7 Graded gravel 7.1 General provisions 7.2 Material 7.3 Constructions 8 Dry bound macadam 8.1 General provisions 8.2 Material 8.3 Construction 9 Quality control and inspection acceptance 9.1 General provisions 9.2 Standard test of the material 9.3 Paving test section 9.4 Quality control 9.5 Inspection and acceptance Annex A Rebound deflection evaluation and inspection Annex B Location Determination of Random Sampling on Site
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
JTJ 034-2000, JTJ/T 034-2000, JTJT 034-2000, JTJ034-2000, JTJ 034, JTJ034, JTJ/T034-2000, JTJ/T 034, JTJ/T034, JTJT034-2000, JTJT 034, JTJT034