2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/NB/T 20010.10-2010
NB/T 20010.10-2010   PWR Nuclear Power Plant Valve - Part 10: Stress Analysis and Seismic Analysis (English Version)
Standard No.: NB/T 20010.10-2010 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):240.0 remind me the price change

Email:

Implemented on:2010-10-1 Delivery: via email in 1 business day

→ → →

,,2010-10-1,14113772177956D3299D50556497A
Standard No.: NB/T 20010.10-2010
English Name: PWR Nuclear Power Plant Valve - Part 10: Stress Analysis and Seismic Analysis
Chinese Name: 压水堆核电厂阀门 第10部分:应力分析和抗震分析
Professional Classification: NB    Professional Standard - Energy
Source Content Issued by: National Energy Administration
Issued on: 2010-5-1
Implemented on: 2010-10-1
Status: valid
Superseding:EJ/T 1022.14-1996 PWR nuclear power plant valve-Part 14: Stress analysis and seismic analysis
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 240.0
Delivery: via email in 1 business day
"PWR Nuclear Power Plant Valve" (NB/T 20010) is composed of 15 parts: - Part 1: General Standard for Design and Manufacture; - Part 2: Specification of Carbon Steel Casting; - Part 3: Specification of Stainless Steel Casting; - Part 4: Specification of Carbon Steel Forging; - Part 5: Specification of Austenitic Stainless Steel Forging; - Part 6: Specification for Fastener; - Part 7: Specification of Packaging, Transport and Storage; - Part 8: Specification of Installation and Maintenance; - Part 9: Final Examination and Test in Manufactory; - Part 10: Stress Analysis and Seismic Analysis; - Part 11: Electric Actuator; - Part 12: Pneumatic Actuator; - Part 13: Specification of Non-classified Valve for Nuclear Device; - Part 14: Specification of Flexible Graphite Packing; - Part 15: Specification of Spiral Wound Gasket with Flexible Graphite. This part is Part 10 of NB/T 20010.
Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 General Rules 5 Analysis Rules of Grade 1 Valve 6 Analysis Rules of Grade 2 Valve 7 Analysis Rules of Grade 3 Valve 8 Seismic Analysis of Valve with Protruding Structure Appendix A (Normative) Determination of Permissible Stress Intensity and Permissible Stress of Valve Materials Appendix B (Normative) Fatigue Curve Appendix C (Normative) Wall Thickness Series of Grade 40 Pipes
Referred in NB/T 20010.10-2010:
* WS/T 211-2015
* This part-
* This part-
* The valve-
* Q/GDW 232.32-2008 Sepcification for professional ability training of SGCC skilled personnel in production - Part 32: Power communication
* The following-
* GB/T 16702-1996 Design rules for mechanical components of PWR nuclear islands
* NB/T 20010.1-2010 PWR Nuclear Power Plant Valve - Part 1: General Standard for Design and Manufacture
* YS/T 1093-2015
* For the-
* 机械工业出版社JB/T 6383.1-1992
* Operational safety-
NB/T 20010.10-2010 is referred in:
* NB/T 20010.1-2010 PWR Nuclear Power Plant Valve - Part 1: General Standard for Design and Manufacture
Code of China
Standard
NB/T 20010.10-2010  PWR Nuclear Power Plant Valve - Part 10: Stress Analysis and Seismic Analysis (English Version)
Standard No.NB/T 20010.10-2010
Statusvalid
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)240.0
Implemented on2010-10-1
Deliveryvia email in 1 business day
Detail of NB/T 20010.10-2010
Standard No.
NB/T 20010.10-2010
English Name
PWR Nuclear Power Plant Valve - Part 10: Stress Analysis and Seismic Analysis
Chinese Name
压水堆核电厂阀门 第10部分:应力分析和抗震分析
Chinese Classification
Professional Classification
NB
ICS Classification
Issued by
National Energy Administration
Issued on
2010-5-1
Implemented on
2010-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
EJ/T 1022.14-1996 PWR nuclear power plant valve-Part 14: Stress analysis and seismic analysis
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
240.0
Keywords
NB/T 20010.10-2010, NB 20010.10-2010, NBT 20010.10-2010, NB/T20010.10-2010, NB/T 20010.10, NB/T20010.10, NB20010.10-2010, NB 20010.10, NB20010.10, NBT20010.10-2010, NBT 20010.10, NBT20010.10
Introduction of NB/T 20010.10-2010
"PWR Nuclear Power Plant Valve" (NB/T 20010) is composed of 15 parts: - Part 1: General Standard for Design and Manufacture; - Part 2: Specification of Carbon Steel Casting; - Part 3: Specification of Stainless Steel Casting; - Part 4: Specification of Carbon Steel Forging; - Part 5: Specification of Austenitic Stainless Steel Forging; - Part 6: Specification for Fastener; - Part 7: Specification of Packaging, Transport and Storage; - Part 8: Specification of Installation and Maintenance; - Part 9: Final Examination and Test in Manufactory; - Part 10: Stress Analysis and Seismic Analysis; - Part 11: Electric Actuator; - Part 12: Pneumatic Actuator; - Part 13: Specification of Non-classified Valve for Nuclear Device; - Part 14: Specification of Flexible Graphite Packing; - Part 15: Specification of Spiral Wound Gasket with Flexible Graphite. This part is Part 10 of NB/T 20010.
Contents of NB/T 20010.10-2010
Foreword i 1 Scope 2 Normative References 3 Terms and Definitions 4 General Rules 5 Analysis Rules of Grade 1 Valve 6 Analysis Rules of Grade 2 Valve 7 Analysis Rules of Grade 3 Valve 8 Seismic Analysis of Valve with Protruding Structure Appendix A (Normative) Determination of Permissible Stress Intensity and Permissible Stress of Valve Materials Appendix B (Normative) Fatigue Curve Appendix C (Normative) Wall Thickness Series of Grade 40 Pipes
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
NB/T 20010.10-2010, NB 20010.10-2010, NBT 20010.10-2010, NB/T20010.10-2010, NB/T 20010.10, NB/T20010.10, NB20010.10-2010, NB 20010.10, NB20010.10, NBT20010.10-2010, NBT 20010.10, NBT20010.10