2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SH/T 3528-2014
SH/T 3528-2014   Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry (English Version)
Standard No.: SH/T 3528-2014 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 15000 words Translation Price(USD):450.0 remind me the price change

Email:

Implemented on:2014-11-1 Delivery: via email in 1 business day

→ → →

,,2014-11-1,0D8F23B575BB6C121418966264529
Standard No.: SH/T 3528-2014
English Name: Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Chinese Name: 石油化工钢制储罐地基与基础施工及验收规范
Professional Classification: SH    Professional Standard - Petrochemical
Source Content Issued by: Ministry of Industry and Information Technology
Issued on: 2014-07-09
Implemented on: 2014-11-1
Status: valid
Superseding:SH/T 3528-2005 Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Target Language: English
File Format: PDF
Word Count: 15000 words
Translation Price(USD): 450.0
Delivery: via email in 1 business day
Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry 1 Scope This specification specifies the technical and quality criteria as well as project acceptance and technical documents for completion for the construction of steel storage tank subgrade & foundation and foundation settlement observation. This specification is applicable to the construction and acceptance of vertical cylindrical steel storage tank subgrade & foundation in petrochemical industry and coal-chemical industry and the construction and acceptance of the steel gas tank subgrade & foundation, but not applicable to the construction and acceptance of the prestressed concrete steel storage tank subgrade & foundation. 2 Normative references The following documents are indispensable for the application of this specification. For dated references, only the edition cited applies. For undated reference, the latest edition (including any amendments) applies. GB/T 50430 Code for quality management of engineering construction enterprises GB 50484 Technical code for construction safety in petrochemical engineering GB 50496 Standard for construction of mass concrete GB/T 50756 Technical code for ground treatment of steel tanks GB/T 17639 Geosynthetics - Synthetic filament spunbond and needlepunched nonwoven geotextiles GB/T 17643 Geosynthetics - Polyethylene geomembrane GB 1499.2 Steel for the reinforcement of concrete - Part 2: Hot rolled ribbed bars JGJ 18 Specification for welding and acceptance of reinforcing steel bars JGJ 46 Technical code for safety of temporary electrification on construction site JGJ/T 104 Specification for winter construction of building engineering JGJ 107 Technical specification for mechanical splicing of steel reinforcing bars JGJ/T 178 Technical specification for application of shrinkage-compensating concrete SH/T 3503 Specification on handover technical documentation for petrochemical construction projects SH/T 3510 Acceptance specification for construction quality of equipment concrete foundations in petrochemical industry 3 Terms and definitions For the purposes of this specification, the following terms and definitions apply. 3.1 ground improvement engineering measure taken to increase the bearing capacity of subgrade or improve its deformation or permeability 3.2 composite foundation foundation of which part soil is reinforced or replaced to form a reinforced body that together with the surrounding foundation soil bears the load 3.3 cushion hard and dense foundation soil formed by digging out the shallow soft soil layer or uneven soil layer on the surface, backfilling the specified materials, and then compacting or tamping 3.4 slope protected foundation foundation which bears load jointly by the concrete slope protection or crushed stone slope protection and the packing layer, sand layer and asphaltic sands insulating layer inside the slope protection 3.5 ringwall foundation foundation which bears load jointly by the reinforced concrete ringwall and the packing layer, sand layer and asphaltic sands insulating layer inside the ringwall 3.6 outside ringwall foundation foundation which bears load jointly by the reinforced concrete ringwall and the packing layer, sand layer and asphaltic sands insulating layer inside the ringwall 3.7 pile foundation foundation which bears load jointly by the pile and the reinforced concrete pile cap connected to the pile top as well as the packing layer, sand layer and asphaltic sands insulating layer of the pile cap
Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 General provision 4.1 Basic provision 4.2 Type of storage tank foundations 5 Construction of storage tank subgrade 5.1 Basic provision 5.2 Subgrade acceptance 6 Storage tank foundation construction 6.1 Earthwork excavation and backfilling 6.2 Foundation bed 6.3 Reinforced concrete foundation 6.4 Packing layer and impermeable layer/sand layer in ringwall 6.5 Asphaltic sands insulating layer 6.6 Heat insulation layer 6.7 Construction of auxiliary facilities 7 Leak test and foundation settlement observation 7.1 Basic provision 7.2 Settlement observation results 8 Defect disposal 9 Technical documents for completion Annex A (Normative) Classification of subsection works/sub-subsection works and subitem works Annex B (Informative) Cylinder diesel piling hammer parameters Annex C (Normative) Quality control criteria for packing layers and asphaltic sands insulating layers Annex D (Informative) Trademark and performance of petroleum asphalt Bibliography Explanation of wording in this specification
SH/T 3528-2014 is referred in:
* SH/T 3510-2011 Acceptance Specification for Construction quality of quipment concrete foundation in petrochemical engineering
* SH/T 3510-2011 Acceptance Specification for Construction quality of quipment concrete foundation in petrochemical engineering
* GB/T 50938-2013 Technical Code for Low Temperature Steel Storage Tanks in Petrochemical Engineering
Code of China
Standard
SH/T 3528-2014  Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry (English Version)
Standard No.SH/T 3528-2014
Statusvalid
LanguageEnglish
File FormatPDF
Word Count15000 words
Price(USD)450.0
Implemented on2014-11-1
Deliveryvia email in 1 business day
Detail of SH/T 3528-2014
Standard No.
SH/T 3528-2014
English Name
Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Chinese Name
石油化工钢制储罐地基与基础施工及验收规范
Chinese Classification
Professional Classification
SH
ICS Classification
Issued by
Ministry of Industry and Information Technology
Issued on
2014-07-09
Implemented on
2014-11-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
SH/T 3528-2005 Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry
Language
English
File Format
PDF
Word Count
15000 words
Price(USD)
450.0
Keywords
SH/T 3528-2014, SH 3528-2014, SHT 3528-2014, SH/T3528-2014, SH/T 3528, SH/T3528, SH3528-2014, SH 3528, SH3528, SHT3528-2014, SHT 3528, SHT3528
Introduction of SH/T 3528-2014
Specification for construction and acceptance of steel storage tank subgrade & foundation in petrochemical industry 1 Scope This specification specifies the technical and quality criteria as well as project acceptance and technical documents for completion for the construction of steel storage tank subgrade & foundation and foundation settlement observation. This specification is applicable to the construction and acceptance of vertical cylindrical steel storage tank subgrade & foundation in petrochemical industry and coal-chemical industry and the construction and acceptance of the steel gas tank subgrade & foundation, but not applicable to the construction and acceptance of the prestressed concrete steel storage tank subgrade & foundation. 2 Normative references The following documents are indispensable for the application of this specification. For dated references, only the edition cited applies. For undated reference, the latest edition (including any amendments) applies. GB/T 50430 Code for quality management of engineering construction enterprises GB 50484 Technical code for construction safety in petrochemical engineering GB 50496 Standard for construction of mass concrete GB/T 50756 Technical code for ground treatment of steel tanks GB/T 17639 Geosynthetics - Synthetic filament spunbond and needlepunched nonwoven geotextiles GB/T 17643 Geosynthetics - Polyethylene geomembrane GB 1499.2 Steel for the reinforcement of concrete - Part 2: Hot rolled ribbed bars JGJ 18 Specification for welding and acceptance of reinforcing steel bars JGJ 46 Technical code for safety of temporary electrification on construction site JGJ/T 104 Specification for winter construction of building engineering JGJ 107 Technical specification for mechanical splicing of steel reinforcing bars JGJ/T 178 Technical specification for application of shrinkage-compensating concrete SH/T 3503 Specification on handover technical documentation for petrochemical construction projects SH/T 3510 Acceptance specification for construction quality of equipment concrete foundations in petrochemical industry 3 Terms and definitions For the purposes of this specification, the following terms and definitions apply. 3.1 ground improvement engineering measure taken to increase the bearing capacity of subgrade or improve its deformation or permeability 3.2 composite foundation foundation of which part soil is reinforced or replaced to form a reinforced body that together with the surrounding foundation soil bears the load 3.3 cushion hard and dense foundation soil formed by digging out the shallow soft soil layer or uneven soil layer on the surface, backfilling the specified materials, and then compacting or tamping 3.4 slope protected foundation foundation which bears load jointly by the concrete slope protection or crushed stone slope protection and the packing layer, sand layer and asphaltic sands insulating layer inside the slope protection 3.5 ringwall foundation foundation which bears load jointly by the reinforced concrete ringwall and the packing layer, sand layer and asphaltic sands insulating layer inside the ringwall 3.6 outside ringwall foundation foundation which bears load jointly by the reinforced concrete ringwall and the packing layer, sand layer and asphaltic sands insulating layer inside the ringwall 3.7 pile foundation foundation which bears load jointly by the pile and the reinforced concrete pile cap connected to the pile top as well as the packing layer, sand layer and asphaltic sands insulating layer of the pile cap
Contents of SH/T 3528-2014
Foreword i 1 Scope 2 Normative references 3 Terms and definitions 4 General provision 4.1 Basic provision 4.2 Type of storage tank foundations 5 Construction of storage tank subgrade 5.1 Basic provision 5.2 Subgrade acceptance 6 Storage tank foundation construction 6.1 Earthwork excavation and backfilling 6.2 Foundation bed 6.3 Reinforced concrete foundation 6.4 Packing layer and impermeable layer/sand layer in ringwall 6.5 Asphaltic sands insulating layer 6.6 Heat insulation layer 6.7 Construction of auxiliary facilities 7 Leak test and foundation settlement observation 7.1 Basic provision 7.2 Settlement observation results 8 Defect disposal 9 Technical documents for completion Annex A (Normative) Classification of subsection works/sub-subsection works and subitem works Annex B (Informative) Cylinder diesel piling hammer parameters Annex C (Normative) Quality control criteria for packing layers and asphaltic sands insulating layers Annex D (Informative) Trademark and performance of petroleum asphalt Bibliography Explanation of wording in this specification
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SH/T 3528-2014, SH 3528-2014, SHT 3528-2014, SH/T3528-2014, SH/T 3528, SH/T3528, SH3528-2014, SH 3528, SH3528, SHT3528-2014, SHT 3528, SHT3528