2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SY/T 6711-2008
SY/T 6711-2008   Technical Safety Code for Liquefied Natural Gas Receiving Terminal (English Version)
Standard No.: SY/T 6711-2008 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 13000 words Translation Price(USD):260.0 remind me the price change

Email:

Implemented on:2008-12-1 Delivery: via email in 1 business day

→ → →

,2015-3-1,2008-12-1,141137617002455059CBE9C1DAC56

71.100.30    Explosives. Pyrotechnics and fireworks
Standard No.: SY/T 6711-2008
English Name: Technical Safety Code for Liquefied Natural Gas Receiving Terminal
Chinese Name: 液化天然气接收站安全技术规程
Chinese Classification: E09    Hygiene, safety and labor protection
Professional Classification: SY    Professional Standard - Oil & Gas
Source Content Issued by: NDRC
Issued on: 2008-06-16
Implemented on: 2008-12-1
Status: superseded
Superseded by:SY/T 6711-2014 Technical Code for Liquefied Natural Gas Receiving Terminal
Superseded on:2015-3-1
Target Language: English
File Format: PDF
Word Count: 13000 words
Translation Price(USD): 260.0
Delivery: via email in 1 business day
This Code specifies the safety technical requirements during the sitting, design, construction, operational guidance and maintenance of the LNG receiving terminal. This Code is applicable to the renovation and extension of LNG receiving terminal for full containment low-temperature LNG storage tank, while the construction of LNG receiving terminal for other kinds of tanks may refer to this Code. This Code is inapplicable to the construction of LNG receiving terminal for the tank under the congealed ground.
Foreword IV 1. Scope 2. Normative References 3. Terms and Definitions 4. General Rules 5. Site Selection and Land Area Formation 5.1 General Rules 5.2 Safety and Environment 5.3 Land-based Area Formation 6. General Layout 6.1 General rules 6.2 Plan Layout 6.3 Vertical Arrangement 6.4 Construction/structures 7. Port 7.1 General Rules 7.2 LNG Carrier berthing and Unberthing 7.3 Port and Trestle 8. Tank 8.1 General Requirements 8.2 Tank Insulation 8.3 Tank Foundation 8.4 Pressure and Vacuum Protection 8.5 Instrument System 8.6 Tank Pipeline 8.7 Pump in Tank 8.8 Structural Monitor 8.9 Tank Test 9. Terminal Process 9.1 Boil-off Gas Recovery and Treatment 9.2 LNG Pressurizing System 9.3 Vaporization 9.4 Flare and Blowdown System 10. Natural Gas Exportation 10.1 Pressure Adjustment and Measurement 10.2 Pigging System 10.3 Odorization 11. Tanker Loading System 11.1 Process Piping System 11.2 Pressure and Flow Control 11.3 Tanker Loading Area 11.4 Loading Arm and Hose 11.5 Grounding and Communication 11.6 Collecting Tank 11.7 Collecting Basin 11.8 Measurement 11.9 Handling Operation 12. Process Pipe 12.1 General Rules 12.2 Insulation 12.3 Installation 12.4 Inspection and Test 12.5 Displacement 12.6 Relief Valve 12.7 Anti-corrosion 13. Instrument and Control System 13.1 Control System 13.2 Emergency Shut-down System 13.3 Liquid Level Monitoring 13.4 Density Monitoring 13.5 Pressure Monitoring 13.6 Temperature Monitoring 13.7 Flow Detection 14. Electrical Equipment 14.1 General Provisions 14.2 Power Requirement 14.3 Connection Box and Site Control Panel 14.4 Earthing and Shielding 14.5 Protection against Lightning 14.6 Emergency Lighting 15. Fire Protection and Safety 15.1 General Provisions 15.2 Detection System 15.3 Fire Extinguishing System 15.4 Paint Coating 15.5 Personal Safety 15.6 Personnel Evacuation 15.7 Emergency Preplan 16. Utility Systems and other Ancillary Works 16.1 Seawater Service System 16.2 Instrument Air 16.3 Nitrogen System 17. Construction Safety and Commissioning 17.1 Construction Safety 17.2 Commissioning 18. Operation, Maintenance and Personal Training 18.1 General Provisions 18.2 Safe Operation Requirements 18.3 Maintenance 18.4 Personal Training
Referred in SY/T 6711-2008:
* GB 3836-2000
* GB/T 20368-2006 Production, storage and handling of liquefied natural gas (LNG)
* GB 50007-2011 Code for design of building foundation
* GB 50052-2009 Code for Design Electric Power Supply Systems
* GB 50057-1994 (2000) Design Code for Lightning Protection of Buildings
* GB 50183-2004 Code for Fire Protection Design of Petroleum and Natural Gas Engin
* SY/T 0329-2004 Test methods of large oil tank foundations
* AQ 2012-2007 Safety specification for petroleum & gas
* JB 4730-1994 Nondestructive Testing of Pressure Vessels
* JTJ 237-1999 Code for Fire-prevention Design of Oil Loading/Unloading Terminals
* JTJ 304-2003
* JT 556-2004 Technical requirements of lightningproof and earthing in the port
* JT/T 557-2004 Port handling area illuminance and measurement
* SH 3076-96 Petrol-chemical enterprise design specification for building structure
Code of China
Standard
SY/T 6711-2008  Technical Safety Code for Liquefied Natural Gas Receiving Terminal (English Version)
Standard No.SY/T 6711-2008
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count13000 words
Price(USD)260.0
Implemented on2008-12-1
Deliveryvia email in 1 business day
Detail of SY/T 6711-2008
Standard No.
SY/T 6711-2008
English Name
Technical Safety Code for Liquefied Natural Gas Receiving Terminal
Chinese Name
液化天然气接收站安全技术规程
Chinese Classification
E09
Professional Classification
SY
ICS Classification
71.100.30
Issued by
NDRC
Issued on
2008-06-16
Implemented on
2008-12-1
Status
superseded
Superseded by
SY/T 6711-2014 Technical Code for Liquefied Natural Gas Receiving Terminal
Superseded on
2015-3-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
13000 words
Price(USD)
260.0
Keywords
SY/T 6711-2008, SY 6711-2008, SYT 6711-2008, SY/T6711-2008, SY/T 6711, SY/T6711, SY6711-2008, SY 6711, SY6711, SYT6711-2008, SYT 6711, SYT6711
Introduction of SY/T 6711-2008
This Code specifies the safety technical requirements during the sitting, design, construction, operational guidance and maintenance of the LNG receiving terminal. This Code is applicable to the renovation and extension of LNG receiving terminal for full containment low-temperature LNG storage tank, while the construction of LNG receiving terminal for other kinds of tanks may refer to this Code. This Code is inapplicable to the construction of LNG receiving terminal for the tank under the congealed ground.
Contents of SY/T 6711-2008
Foreword IV 1. Scope 2. Normative References 3. Terms and Definitions 4. General Rules 5. Site Selection and Land Area Formation 5.1 General Rules 5.2 Safety and Environment 5.3 Land-based Area Formation 6. General Layout 6.1 General rules 6.2 Plan Layout 6.3 Vertical Arrangement 6.4 Construction/structures 7. Port 7.1 General Rules 7.2 LNG Carrier berthing and Unberthing 7.3 Port and Trestle 8. Tank 8.1 General Requirements 8.2 Tank Insulation 8.3 Tank Foundation 8.4 Pressure and Vacuum Protection 8.5 Instrument System 8.6 Tank Pipeline 8.7 Pump in Tank 8.8 Structural Monitor 8.9 Tank Test 9. Terminal Process 9.1 Boil-off Gas Recovery and Treatment 9.2 LNG Pressurizing System 9.3 Vaporization 9.4 Flare and Blowdown System 10. Natural Gas Exportation 10.1 Pressure Adjustment and Measurement 10.2 Pigging System 10.3 Odorization 11. Tanker Loading System 11.1 Process Piping System 11.2 Pressure and Flow Control 11.3 Tanker Loading Area 11.4 Loading Arm and Hose 11.5 Grounding and Communication 11.6 Collecting Tank 11.7 Collecting Basin 11.8 Measurement 11.9 Handling Operation 12. Process Pipe 12.1 General Rules 12.2 Insulation 12.3 Installation 12.4 Inspection and Test 12.5 Displacement 12.6 Relief Valve 12.7 Anti-corrosion 13. Instrument and Control System 13.1 Control System 13.2 Emergency Shut-down System 13.3 Liquid Level Monitoring 13.4 Density Monitoring 13.5 Pressure Monitoring 13.6 Temperature Monitoring 13.7 Flow Detection 14. Electrical Equipment 14.1 General Provisions 14.2 Power Requirement 14.3 Connection Box and Site Control Panel 14.4 Earthing and Shielding 14.5 Protection against Lightning 14.6 Emergency Lighting 15. Fire Protection and Safety 15.1 General Provisions 15.2 Detection System 15.3 Fire Extinguishing System 15.4 Paint Coating 15.5 Personal Safety 15.6 Personnel Evacuation 15.7 Emergency Preplan 16. Utility Systems and other Ancillary Works 16.1 Seawater Service System 16.2 Instrument Air 16.3 Nitrogen System 17. Construction Safety and Commissioning 17.1 Construction Safety 17.2 Commissioning 18. Operation, Maintenance and Personal Training 18.1 General Provisions 18.2 Safe Operation Requirements 18.3 Maintenance 18.4 Personal Training
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SY/T 6711-2008, SY 6711-2008, SYT 6711-2008, SY/T6711-2008, SY/T 6711, SY/T6711, SY6711-2008, SY 6711, SY6711, SYT6711-2008, SYT 6711, SYT6711