2025-12-19 10.8.118.215
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
GB/T 19139-2012 Testing of well cements 2220.0 via email in 1~3 business day valid,,2013-7-1
GB/T 28911-2012 Vocabulary of drilling engineering for the petroleum and natural gas 800.0 via email in 1 business day valid,,2013-3-1
SY/T 5731-2012 Calculation method for wellhead hanging load of casing string 330.0 via email in 1~3 business day to be superseded,2026-3-28,2012-12-1
SY/T 6332-2012 Trajectory Control for Directional Well 120.0 via email in 1~3 business day superseded2025-03-24,2025-3-24,2012-12-1
SY/T 6903-2012 Measurement traceability and transmissibility of magnetic instrument 90.0 via email in 1~3 business day superseded2020-05-01 ,2020-5-1,2012-12-1
SY/T 6920-2012 Specification for offshore drilling design 210.0 via email in 1~3 business day superseded,2019-3-1,2012-12-1
SY/T 6864-2012 Calibration method of drilling fluid funnel 180.0 via email in 1~3 business day valid,,2012-3-1
SY/T 5547-2012 Operation maintenance and management for positive displacement mud motor 180.0 via email in 1~3 business day valid,,2012-3-1
GB/T 24956-2010 Recommended practice for petroleum and natural gas industries - Drill stem design and operating limits 2250.0 via email in 1~5 business day valid,,2010-12-31
GB/T 5005-2010 Specifications of drilling fluid materials 900.0 via email in 1~3 business day valid,,2010-12-1
SY/T 6789-2010 Specifications of Operation for Casing Head 330.0 via email in 1~3 business day superseded2025-03-24,2025-3-24,2010-10-1
SY/T 6396-2009 Requirements for wells anticollision technology 60.0 via email in 1~3 business day superseded,2015-3-1,2010-5-1
SY/T 5623-2009 Prediction and detection methods of formation pressure 300.0 via email in 1~3 business day valid,,2010-5-1
SY/T 5373-2009 Diagram and symbol for down hole drilling tools and operation 420.0 via email in 1~3 business day valid,,2010-5-1
SY/T 5350-2009 Evaluation procedure for foaming agents used in drilling fluids 60.0 via email in 1~3 business day valid,,2010-5-1
SY/T 5431-2008 The design method of casing program 270.0 via email in 1~3 business day superseded,2017-8-1,2008-12-1
SY/T 6709-2008 Drilling technology rules for gypsolith and sale formation 105.0 via email in 1~3 business day valid,,2008-12-1
SY/T 5088-2008 Specification for wellbore quality 180.0 via email in 1~3 business day superseded,2017-8-1,2008-12-1
SY/T 5094-2008 Sulfomethylated phenol formaldehyde resin for drilling fluid 210.0 via email in 1~3 business day superseded,2017-8-1,2008-12-1
SY/T 5504.3-2008 Evaluation method for oil well cement additives - Part 3: Dispersant 120.0 via email in 1~3 business day superseded,2019-3-1,2008-12-1
Previous Page     Next Page



Code of China
Search

GB/T 19139-2012 Testing of well cements 
  Issued on: 2012-12-31   Price(USD): 2220.0
GB/T 28911-2012 Vocabulary of drilling engineering for the petroleum and natural gas 
  Issued on: 2012-11-5   Price(USD): 800.0
SY/T 5731-2012 Calculation method for wellhead hanging load of casing string 
  Issued on: 2012-8-23   Price(USD): 330.0
SY/T 6332-2012 Trajectory Control for Directional Well 
  Issued on: 2012-8-23   Price(USD): 120.0
SY/T 6903-2012 Measurement traceability and transmissibility of magnetic instrument 
  Issued on: 2012-8-23   Price(USD): 90.0
SY/T 6920-2012 Specification for offshore drilling design 
  Issued on: 2012-8-23   Price(USD): 210.0
SY/T 6864-2012 Calibration method of drilling fluid funnel 
  Issued on: 2012-01-04   Price(USD): 180.0
SY/T 5547-2012 Operation maintenance and management for positive displacement mud motor 
  Issued on: 2012-1-4   Price(USD): 180.0
GB/T 24956-2010 Recommended practice for petroleum and natural gas industries - Drill stem design and operating limits 
  Issued on: 2010-8-9   Price(USD): 2250.0
GB/T 5005-2010 Specifications of drilling fluid materials 
  Issued on: 2010-9-2   Price(USD): 900.0
SY/T 6789-2010 Specifications of Operation for Casing Head 
  Issued on: 2010-5-1   Price(USD): 330.0
SY/T 6396-2009 Requirements for wells anticollision technology 
  Issued on: 2009-12-31   Price(USD): 60.0
SY/T 5623-2009 Prediction and detection methods of formation pressure 
  Issued on: 2009-12-31   Price(USD): 300.0
SY/T 5373-2009 Diagram and symbol for down hole drilling tools and operation 
  Issued on: 2009-12-31   Price(USD): 420.0
SY/T 5350-2009 Evaluation procedure for foaming agents used in drilling fluids 
  Issued on: 2009-12-31   Price(USD): 60.0
SY/T 5431-2008 The design method of casing program 
  Issued on: 2008-6-16   Price(USD): 270.0
SY/T 6709-2008 Drilling technology rules for gypsolith and sale formation 
  Issued on: 2008-6-16   Price(USD): 105.0
SY/T 5088-2008 Specification for wellbore quality 
  Issued on: 2008-6-16   Price(USD): 180.0
SY/T 5094-2008 Sulfomethylated phenol formaldehyde resin for drilling fluid 
  Issued on: 2008-6-16   Price(USD): 210.0
SY/T 5504.3-2008 Evaluation method for oil well cement additives - Part 3: Dispersant 
  Issued on: 2008-6-16   Price(USD): 120.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040