| Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
| YB/T 505-1965 |
Method for chemical analysis of vanadium-containing titanium slag |
|
via email in business day |
superseded,2007-7-1,1966-4-1 |
|
| QJ 3296.2-2008 |
Inserts for Honeycomb-sandwich Structure - Part 2:Inserts,with Clearance Hole,Open Type B |
90.0 |
via email in 1~3 business day |
valid,, |
|
| HB 6334-1989 |
|
|
via email in business day |
superseded,2003-2-24, |
|
| SN/T 1731.7-2006 |
Safety performance test for pyrotechnic composition used for export fireworks and firecrackers-Part 7:Moisture absorption capability |
130.0 |
via email in 1~3 business day |
valid,,2006-8-16 |
|
| JB/T 5932.4-1991 |
Crawler Bulldozer Pin Roll and Pin Bush Intended to Be Used in Sealed Tracks |
130.0 |
via email in 1~3 business day |
superseded,2018-1-1,1992-7-1 |
|
| GB/T 12853-1991 |
Blank detail specification for continuous wave magnetrons |
304.0 |
via email in 1~3 business day |
superseded2002-05-01,2002-5-1,1991-12-1 |
|
| SJ/Z 1464-1979 |
Method of chemical analysis of ore materials |
450.0 |
via email in 1~3 business day |
valid,,1979-11-27 |
|
| JB/T 3665-1996 |
|
224.0 |
via email in 1~3 business day |
superseded,2007-5-1, |
|
| JB/T 5060-1991 |
|
304.0 |
via email in 1~3 business day |
superseded,2006-10-1, |
|
| HG/T 2132-2009 |
Glass lined 45°elbows |
184.0 |
via email in 1~3 business day |
superseded,2015-6-1,2009-7-1 |
|
| JB/T 4709-2000 |
Welding specification for steel pressure vessels |
220.0 |
via email in 1 business day |
superseded,2011-10-1,2000-10-1 |
|
| GA 12-1991 |
|
134.0 |
via email in 1~3 business day |
superseded2010-07-01 ,2010-7-1,1992-7-1 |
|
| JB 2025-1984 |
|
384.0 |
via email in 1~3 business day |
superseded,2000-1-1, |
|
| LY/T 2413.2-2015 |
|
324.0 |
via email in 1~3 business day |
valid,,2016-1-1 |
|
| GB/Z 18914-2014 |
Information technology―Software engineering―Guidelines for the adoption of CASE tools |
310.0 |
via email in 1~5 business day |
valid,,2015-2-1 |
|
| QB/T 2536-2007 |
Double face |
60.0 |
via email in 1 business day |
superseded,2024-2-1,2007-12-1 |
|
| EJ/T 1022.7-1996 |
PWR nuclear power plant valve-Part 7: Packing, transportation and storage |
40.0 |
via email in 1 business day |
superseded,2010-10-1,1996-8-1 |
|
| GB/T 9345-1988 |
Plastics-Determination of ash-General methods |
80.0 |
via email in 1~3 business day |
superseded,2009-4-1,1989-2-1 |
|
| GB 3084-1982 |
Zinc-coated low-carbon steel wire for cotton baling |
180.0 |
via email in 1~3 business day |
valid,,1983-3-1 |
|
| NB/T 35019-2013 |
Series Parameters for Horizontal Hydraulic Hoist (Cylinder) |
450.0 |
via email in 1~5 business day |
superseded,2023-5-4,2013-10-1 |
|
|
|