Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
YS/T 3041.2-2021 |
A correction method of determining the silver content in metal ores, concentrates and related materials by fire assay- Part 2:Slag and cupel recovery method |
$200.00 |
via email in 1~3 business day |
valid,,2022-4-1 |
|
YS/T 3041.3-2021 |
A correction method of determining the silver content in metal ores, concentrates and related materials by fire assay- Part 3:Slag recovery and cupellation calibration method |
$160.00 |
via email in 1~3 business day |
valid,,2022-4-1 |
|
YS/T 3042-2021 |
Methods for chemical analysis of cyanide liquid-Determination of gold content |
$220.00 |
via email in 1~3 business day |
valid,,2022-4-1 |
|
YS/T 3043-2023 |
Determination ofgold content in chlorinated gold materials |
$120.00 |
via email in 1~3 business day |
valid,,2024-7-1 |
|
YS/T 3044-2022 |
Technical specification for co-processing of cyainde leaching residue in side-blowing furnace of copper smelting |
$140.00 |
via email in 1~3 business day |
valid,,2023-4-1 |
|
YS/T 3045-2022 |
Technical specification for gold heap leach process through dripping irrigation with subsurface pipes |
$160.00 |
via email in 1~3 business day |
valid,,2023-4-1 |
|
YS/T 3046-2024 |
Digital factory of gold industry-General requirements |
$420.00 |
via email in 1~5 business day |
valid,,2025-5-1 |
|
YS/T 3047-2025 |
Technical requirements for filling-type pregnante solution tank in gold mining industry |
|
|
valid,, |
|
YS/T 3048-2025 |
Technical guidelines for comprehensive utilization of tailings resources in gold mining |
$255.00 |
via email in 1~3 business day |
to be valid,,2026-2-1 |
|
YS/T 3049-2025 |
Technical specifications for short stage mining of open pit gold mine |
|
|
valid,, |
|
YS/T 309-1994 |
|
|
|
superseded,1999-5-1, |
|
YS/T 309-1998 |
Aluminium rare-earth alloy ingot for remelting |
$150.00 |
via email in 1~3 business day |
superseded,2013-3-1,1999-5-1 |
|
YS/T 309-2012 |
Aluminium Rare-earth Alloy Ingot for Remelting |
$120.00 |
via email in 1~3 business day |
valid,,2013-3-1 |
|
YS/T 31-1992 |
|
$530.00 |
via email in 1~3 business day |
valid,, |
|
YS/T 310-1995 |
Zinc alloy for hot dip galvanizing |
$150.00 |
via email in 1~3 business day |
superseded,2008-9-1,1995-12-1 |
|
YS/T 310-2008 |
Zinc alloy ingot for hot dip galvanizing |
$160.00 |
via email in 1~3 business day |
superseded,2022-4-1,2008-9-1 |
|
YS/T 310-2021 |
Zinc alloy for hot dip galvanizing |
$240.00 |
via email in 1~3 business day |
valid,,2022-4-1 |
|
YS/T 311-1994 |
Rapid measurement of the molten metal temperature and carbon-identification with the platinum and rhodium 10- platinum thermocouple wire |
|
via email in 1~3 business day |
superseded,2000-9-1, |
|
YS/T 312-1994 |
Rapid measurement of the molten metal temperature and carbon-identification with the platinum and rhodium 13- platinum thermocouple wire |
|
via email in 1~3 business day |
valid,, |
|
YS/T 313-1994 |
Rapid measurement of the molten metal temperature and carbon-identification with the platinum and rhodium 30- platinum and rhodium 6 thermocouple wire |
|
via email in 1~3 business day |
,, |
|
|