Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
DL 5190.2-2012 |
The Code for Erection of Electric Power Construction-Part 2 : Boiler |
$2900.00 |
via email in 1~5 business day |
superseded,2019-10-1,2012-3-1 |
|
DL 5190.2-2019 |
Technical specification for thermal power erection and construction - Part 2: Boiler unit |
$2100.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL 5190.3-2012 |
The Specification of Erection of Electric Power Construction Part 3:Turbine Generator Unit |
$1860.00 |
immediately |
superseded,2019-10-1,2012-3-1 |
|
DL 5190.3-2019 |
Technical specification for thermal power erection and construction -Part 3: Steam turbine generator unit |
$3000.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL 5190.4-2012 |
The specification of erection of electric power construction Part4: instrumentation and control |
$460.00 |
immediately |
superseded,2019-10-1,2012-3-1 |
|
DL 5190.4-2019 |
Technical specification for thermal power erection and construction - Part 4: Instrumentation and control |
$1500.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL 5190.5-2012 |
The specification of erection of electric power construction Part 5: Piping and system |
$320.00 |
immediately |
superseded,2019-10-1,2012-3-1 |
|
DL 5190.5-2019 |
Technical specification for thermal power erection and construction - Part 5: Piping and system |
$1200.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL 5190.6-2012 |
The specification of erection of electric power construction Part 6: The equipment and the system with the water treament and hydrogen generation |
$3000.00 |
via email in 1~3 business day |
superseded,2019-10-1,2012-3-1 |
|
DL 5190.6-2019 |
Technical specification for power plant erection and construction一Part 6:Water treatment and hydrogen generation (supply) equipment and system |
$1720.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL 5190.8-2012 |
Code for electric power construction technology Part 7:Processing preparation (Draft standard for approval) |
$260.00 |
immediately |
superseded,2019-10-1,2012-3-1 |
|
DL 5190.8-2019 |
Technical specification for thermal power erection and construction-Part 8: Processing and prefabrication |
$930.00 |
via email in 1~5 business day |
valid,,2019-10-1 |
|
DL 5190.9-2012 |
Technical specification of electric power construction-Part 9:Hydraulic structure Engineering |
$2835.00 |
via email in 1~5 business day |
superseded,2022-11-13,2012-7-1 |
|
DL 5270-2012 |
Test code for density and moisture by nuclear methods |
$540.00 |
via email in 1~2 business day |
superseded,2021-2-1,2012-3-1 |
|
DL 5277-2012 |
Code for completed fossil power construction project achieved acceptance criterion |
$1800.00 |
immediately |
valid,,2012-7-1 |
|
DL 5278-2012 |
Code for Acceptance of Hydropower and Hydraulic Engineering Reaching the Standard and Putting into Production |
$2010.00 |
via email in 1~3 business day |
valid,,2012-7-1 |
|
DL 5279-2012 |
Specification for Acceptance of Power Transmission Engineering Reached the Standard and Put into Production |
$1620.00 |
via email in 1~3 business day |
valid,,2012-7-1 |
|
DL 5319-2014 |
Specifications for Construction and Acceptance of Long Span Engineering of Overhead Transmission Lines |
$1749.00 |
via email in 1~5 business day |
valid,,2014-8-1 |
|
DL 5320-2014 |
Construction technology guidance for the tension stringing of large crossing overhead transmission line |
$975.00 |
via email in 1~3 business day |
valid,, |
|
DL 5334-2006 |
Safety technical regulations for survey and exploration of electrical power engineering |
$390.00 |
via email in 1~3 business day |
abolished2016-12-1,2016-12-1,2006-10-1 |
|
|