2025-12-14 10.2.82.121
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5095-2007
DL/T 5095-2007   Technical Code for Designing Load of Main Building in Fossil Fuel Power Plant (English Version)
Standard No.: DL/T 5095-2007 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:2007-12-1 Delivery: via email in 1 business day

→ → →

,2014-4-1,2007-12-1,141137530752904C6280D4C9835CD
Standard No.: DL/T 5095-2007
English Name: Technical Code for Designing Load of Main Building in Fossil Fuel Power Plant
Chinese Name: 火力发电厂主厂房荷载设计技术规程
Chinese Classification: P61    Power station engineering
Professional Classification: DL    Professional Standard - Electricity
ICS Classification: 91.040.20 91.040.20    Buildings for commerce and industry 91.040.20
Source Content Issued by: NDRC
Issued on: 2007-07-20
Implemented on: 2007-12-1
Status: superseded
Superseded by:DL/T 5095-2013 Technical Code for Design Load of Main Building in Fossil-fired Power Plant and the Conventional Island of Nuclear Power Plant
Superseded on:2014-4-1
Superseding:DL/T 5095-1999 Technical code for designing load of main building in fossil fuel power plant
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
This standard specifies the main technical requirements of load designing of main building for fossil fuel power plant. This standard is applicable to designs of main building for new, extended or rebuild fossil fuel power plants, which the turbo-unit capacity is at 12~600MV level, and the engineering design of power plants concerning foreign affairs may reference it. This standard is applicable to designs of loads of process and civil-work from 0m ground (including basement) to roofing in main building and centralized control building for fossil fuel power plant, and this standard is not applicable to the design of chimney and flue within this scope.
1 Scope 2 Normative References 3 Terms and Definitions 4 General Provisions 5 General Provisions 6 Equipment Load and Pipe Load 7 Variable Loads of Roof and Floor (Ground) 8 Crane Load 9 Wind Load 10 Snow Load Annex A Annex B Annex C Annex D
Referred in DL/T 5095-2007:
*GB 50009-2012 Load Code for the Design of Building Structures
*GB 50011-2010(2016) Code for Seismic Design of Buildings (2016)
*GB 50040-2020 Standard for design of dynamic machine foundation
*GB 50068-2018 Unified standard reliability design of building structures
*GB 50068-2018 Unified standard reliability design of building structures
*DL/T 5022-2023 Technical code for the design of civil structure of power plant
*DL/T 5121-2020 Code for design of air and flue gas ducts/ raw coal and pulverized coal piping of thermal power plant
*DL/T 5203-2022 Technical specification for explosion-proof design of coal and coal pulverizing system in thermal power plant
Code of China
Standard
DL/T 5095-2007  Technical Code for Designing Load of Main Building in Fossil Fuel Power Plant (English Version)
Standard No.DL/T 5095-2007
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on2007-12-1
Deliveryvia email in 1 business day
Detail of DL/T 5095-2007
Standard No.
DL/T 5095-2007
English Name
Technical Code for Designing Load of Main Building in Fossil Fuel Power Plant
Chinese Name
火力发电厂主厂房荷载设计技术规程
Chinese Classification
P61
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2007-07-20
Implemented on
2007-12-1
Status
superseded
Superseded by
DL/T 5095-2013 Technical Code for Design Load of Main Building in Fossil-fired Power Plant and the Conventional Island of Nuclear Power Plant
Superseded on
2014-4-1
Abolished on
Superseding
DL/T 5095-1999 Technical code for designing load of main building in fossil fuel power plant
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
DL/T 5095-2007, DL 5095-2007, DLT 5095-2007, DL/T5095-2007, DL/T 5095, DL/T5095, DL5095-2007, DL 5095, DL5095, DLT5095-2007, DLT 5095, DLT5095
Introduction of DL/T 5095-2007
This standard specifies the main technical requirements of load designing of main building for fossil fuel power plant. This standard is applicable to designs of main building for new, extended or rebuild fossil fuel power plants, which the turbo-unit capacity is at 12~600MV level, and the engineering design of power plants concerning foreign affairs may reference it. This standard is applicable to designs of loads of process and civil-work from 0m ground (including basement) to roofing in main building and centralized control building for fossil fuel power plant, and this standard is not applicable to the design of chimney and flue within this scope.
Contents of DL/T 5095-2007
1 Scope 2 Normative References 3 Terms and Definitions 4 General Provisions 5 General Provisions 6 Equipment Load and Pipe Load 7 Variable Loads of Roof and Floor (Ground) 8 Crane Load 9 Wind Load 10 Snow Load Annex A Annex B Annex C Annex D
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5095-2007, DL 5095-2007, DLT 5095-2007, DL/T5095-2007, DL/T 5095, DL/T5095, DL5095-2007, DL 5095, DL5095, DLT5095-2007, DLT 5095, DLT5095