2026-11-24 10.8.156.202
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB/T 20136-2025
GB/T 20136-2025   General method of test for electric power plant with internal combustion engines (English)
This English text of GB/T 20136-2025 is translated by certified human translators, with proven quality
Standard No.: GB/T 20136-2025 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 56500 words Translation Price(USD):1695.0 remind me the price change

Email:

Implementation Date:2026-7-1 Delivery: via email in 1~5 business day

→ → →

,,2026-7-1,952FB31DC8BEB3921764835459686
Standard No.: GB/T 20136-2025
English Name: General method of test for electric power plant with internal combustion engines
Chinese Name: 内燃机电站通用试验方法
Chinese Classification: K52    Generating unit
Professional Classification: GB    National Standard
ICS Classification: 27.1 27.1    Power stations in general 27.1
Source Content Issued by: SAMR;SAC
Issurane Date: 2025-12-2
Implementation Date: 2026-7-1
Status: valid
Replacing:GB/T 20136-2006 General method of test for electric power plant with inernal combustion engines
Target Language: English
File Format: PDF
Word Count: 56500 words
Translation Price(USD): 1695.0
Delivery: via email in 1~5 business day
GB/T 20136-2025 General test methods for internal combustion engine power stations English, Anglais, Englisch, Inglés, えいご This is a draft translation for reference among interesting stakeholders. The finalized translation (passing thorugh draft translation, self-check, revision and varification) will be delivered upon being ordered. 1 Scope This document specifies the general test methods for internal combustion engine power stations. This document applies to land-use power stations driven by reciprocating internal combustion engines driving generators (hereinafter referred to as "power stations"). Power stations driven by other drive forms may refer to this document. 2 Normative references The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 2423.16 Environmental testing — Part 2: Test methods — Test J and guidance: Mold growth GB/T 2820.5—2025 Reciprocating internal combustion engine driven alternating current generating sets — Part 5: Generating sets GB/T 2820.9 Reciprocating internal combustion engine driven alternating current generating sets — Part 9: Measurement and evaluation of mechanical vibrations GB/T 2820.10—2002 Reciprocating internal combustion engine driven alternating current generating sets — Part 10: Measurement of airborne noise by the enveloping surface method JB/T 8194 Terms for internal combustion engine power stations 3 Terms and definitions The terms and definitions given in JB/T 8194 apply to this document. 4 Classification of test methods Test methods are classified into the following series: — Series 100: Test methods for insulation performance; — Series 200: Test methods for component performance; — Series 300: Test methods for protective functions; — Series 400: Test methods for performance indicators; — Series 500: Test methods for safety performance; — Series 600: Test methods for radio disturbance; — Series 700: Test methods for environmental protection performance; — Series 800: Test methods for economic performance; — Series 900: Test methods for environmental adaptability; — Series 1000: Test methods for transportability; — Series 1100: Test methods for reliability and maintainability. 5 Test methods 5.1 Series 100: Test methods for insulation performance 5.1.1 Method 101: Insulation resistance measurement 5.1.1.1 Purpose Insulation resistance is an important indicator for evaluating insulation quality. Whether the insulation resistance is qualified directly affects safety and normal power supply, and also affects the normal progress of subsequent test items. To minimize leakage current from individual independent electrical circuits to earth and between circuits, the insulation resistance should be as high as possible. 5.1.1.2 Apparatus Megohmmeter or insulation resistance measuring instrument, with specifications selected according to rated circuit voltage Ur (Ur < 100 V: 250 V; 100 V <= Ur < 500 V: 500 V; 500 V <= Ur < 3 000 V: 1 000 V; Ur >= 3 000 V: 2 500 V; see Table 1). 5.1.1.3 Procedure The procedure shall comply with the following requirements: a) Measurement locations: between each independent electrical circuit and earth, and between circuits; b) Measurement conditions: cold state and/or hot state; c) Disconnect the circuit under test to make it completely independent; d) Disconnect or short-circuit all semiconductor devices, capacitors, etc., from the circuit under test; e) When measuring the insulation resistance to earth of a circuit composed of several windings, the leads of each winding may be connected together; f) Ground all circuits other than the circuit under test; g) Switches in the circuit shall be in the closed (ON) position during measurement; h) Operate according to the megohmmeter instruction manual; i) Record readings after the megohmmeter indication stabilizes (see Table 2); j) Repeat the above procedure for other circuits under test; k) After the insulation resistance measurement is completed, make an electrical connection from each measured circuit to the grounded enclosure to discharge it. 5.1.1.4 Results Compare results with product specifications. 5.1.2 Method 102: Dielectric test 5.1.2.1 Purpose The dielectric withstand voltage test is a more effective and direct method for identifying insulation strength. It is of decisive significance for judging whether the power station can continue to operate, and is also an important means to ensure safe power supply of the power station and prevent insulation accidents. Each independent electrical circuit to earth and between circuits shall be capable of withstanding a test voltage higher than the normal working voltage for a specified duration without damage. 5.1.2.2 Apparatus Adjustable AC high-voltage, current-limited power supply (dielectric test device). The test power frequency is 50 Hz, the voltage waveform is sinusoidal, and the capacity of the test transformer is not less than 1 kVA per kilovolt of test voltage. 5.1.2.3 Procedure The procedure shall comply with the following requirements: a) Test locations: between each independent electrical circuit and earth, and between circuits; b) Test conditions: cold state and/or hot state; c) Test steps: — Disconnect the circuit under test to make it completely independent; — Unless special designs are explicitly specified in product specifications, remove or short-circuit electrical parts of the prime mover, semiconductor devices, and capacitors from the circuit; — Reliably ground the dielectric test device, and connect the earth terminal of the power station and non-tested circuits to the same earth point; — Connect high-voltage leads from the dielectric test device to the circuit under test, with switches in the circuit in the closed (ON) position; — When performing circuit-to-earth dielectric tests, apply test voltage between the circuit under test and the earth terminal; when performing inter-circuit dielectric tests, apply test voltage between separate circuits; — Switch on power supply, starting at not more than half the full test voltage value, then increase uniformly or in steps of not more than 5% of full value to full value. The time for voltage to increase from half value to full value shall not be less than 10 s; — Maintain full test voltage for 1 min, then begin voltage reduction, and disconnect power supply after voltage drops to one-third of full value; — Ground the high-voltage leads of the dielectric test device to discharge the circuit under test to earth, and confirm the circuit under test is not energized; — Remove high-voltage leads, perform dielectric tests on remaining circuits according to the above procedure, and confirm in all cases that non-tested circuits are reliably grounded; — During test, if large fluctuations in voltmeter indication, sharp increases in ammeter indication, smoking of insulating materials, discharge sounds, or other abnormal phenomena are observed, immediately reduce voltage, disconnect power, and inspect after discharging the circuit under test; — Record relevant data and conditions (see Table 3). 5.1.2.4 Results Compare results with product specifications. 5.2 Series 200: Test methods for component performance 5.2.1 Method 201: Visual inspection 5.2.1.1 Purpose This inspection is an important basis for evaluating the visual and manufacturing quality of the power station. 5.2.1.2 Apparatus None. 5.2.1.3 Procedure Inspect the power station and record relevant conditions according to the items listed in Table 4: — Surface quality; — Paint coating quality; — Electroplating quality; — Riveting quality; — Welding quality; — Moving parts; — Fastening parts; — Sealing performance; — Leakage conditions (oil, water, air/gas); — Electrical installation; — Other items. 5.2.1.4 Results Compare results with product specifications. 5.2.2 Method 202: Completeness check 5.2.2.1 Purpose To check spare parts, accessories, tools, accompanying documentation, etc., that should be provided with the power station according to the operating instructions, to confirm whether their completeness satisfies relevant requirements. 5.2.2.2 Apparatus None. 5.2.2.3 Procedure The procedure shall comply with the following requirements: a) Check complete machine configuration (prime mover, generator, control panel); b) Check types, specifications, and quantities of spare parts, accessories, and tools; c) Check types, quantities, and contents of accompanying documents; d) Record relevant conditions (see Table 5). 5.2.2.4 Results Compare results with product specifications. 5.2.3 Method 203: Marking and packaging inspection 5.2.3.1 Purpose When carrying out certain functional tests and/or acceptance tests, the markings and packaging of the power station should generally be inspected to confirm whether markings and packaging satisfy requirements. 5.2.3.2 Apparatus None. 5.2.3.3 Procedure The procedure shall comply with the following requirements: a) Check that nameplates comply with specifications, relevant contents meet requirements, characters are correct and legible, and locations satisfy requirements; b) Check that signs and markings are correct, conspicuous, and placed in required locations; c) Check that packaging satisfies requirements, markings on packaging are correct and conspicuous, and characters are correct and legible; d) The above markings and characters shall not be erased or become illegible after wiping with cotton cloth; e) Record relevant conditions (see Table 6). 5.2.3.4 Results Compare results with product specifications. 5.2.4 Method 204: Mass measurement 5.2.4.1 Purpose Generally, the net mass of the power station shall be indicated; it is one of the bases for calculating specific mass (kg/kW). 5.2.4.2 Apparatus Weighing equipment. 5.2.4.3 Procedure The procedure shall comply with the following requirements: a) Power station fully equipped, in dry state without fuel, engine lubricating oil, and coolant; b) Place power station on weighing equipment; c) Record mass of power station (see Table 7); d) Power station fully equipped, fully filled with fuel, engine lubricating oil, and coolant; e) Repeat steps b) and c); f) Record relevant data and conditions (see Table 7). 5.2.4.4 Results Compare results with product specifications. 5.2.5 Method 205: Overall dimension measurement 5.2.5.1 Purpose The power station shall indicate overall dimensions in transport state and working state; it is one of the bases for calculating power density (kW/m³). 5.2.5.2 Apparatus Steel rule or measuring tape. 5.2.5.3 Procedure The procedure shall comply with the following requirements: a) Power station fully equipped (components having no effect on measured overall dimensions may be excluded), placed in transport state; b) Measure overall dimensions (length, width, height) of power station using steel rule or tape; c) Record relevant states and measured values (see Table 8); d) Power station fully equipped, placed in working state; e) Repeat steps b) and c). 5.2.5.4 Results Compare results with product specifications. 5.2.6 Method 206: Normal-temperature starting performance check 5.2.6.1 Purpose To check the normal starting capability of the power station at natural ambient temperature. 5.2.6.2 Apparatus Timer, speed detection device (tachometer). 5.2.6.3 Procedure The procedure shall comply with the following requirements: a) Place the power station in normal-temperature cold state; b) Select one of the starting modes configured on the power station (excluding low-temperature starting measures); c) Start the power station; d) Record start result ("success" or "failure"), starting time and starting speed of successful start (see Table 9); e) Confirm successful start when instrument readings display normally, running sound is smooth, and there is no abnormal vibration or shaking, then shut down; f) If instrument display is abnormal, running sound is uneven, or abnormal vibration/shaking occurs, confirm as "start failure", shut down for 2 min, and repeat steps c), d), and e). 5.2.6.4 Results
Foreword V 1 Scope 2 Normative references 3 Terms and definitions 4 Classification of test methods 5 Test methods
Code of China
Standard
GB/T 20136-2025  General method of test for electric power plant with internal combustion engines (English)
Standard No.GB/T 20136-2025
Statusvalid
LanguageEnglish
File FormatPDF
Word Count56500 words
Translation Price(USD)1695.0
Implemented on2026-7-1
Deliveryvia email in 1~5 business day
Detail of GB/T 20136-2025
Standard No.
GB/T 20136-2025
English Name
General method of test for electric power plant with internal combustion engines
Chinese Name
内燃机电站通用试验方法
Chinese Classification
K52
Professional Classification
GB
ICS Classification
Issued by
SAMR;SAC
Issued on
2025-12-2
Implemented on
2026-7-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
GB/T 20136-2006 General method of test for electric power plant with inernal combustion engines
Language
English
File Format
PDF
Word Count
56500 words
Translation Price(USD)
1695.0
Keywords
GB/T 20136-2025, GB 20136-2025, GBT 20136-2025, GB/T20136-2025, GB/T 20136, GB/T20136, GB20136-2025, GB 20136, GB20136, GBT20136-2025, GBT 20136, GBT20136
Introduction of GB/T 20136-2025
GB/T 20136-2025 General test methods for internal combustion engine power stations English, Anglais, Englisch, Inglés, えいご This is a draft translation for reference among interesting stakeholders. The finalized translation (passing thorugh draft translation, self-check, revision and varification) will be delivered upon being ordered. 1 Scope This document specifies the general test methods for internal combustion engine power stations. This document applies to land-use power stations driven by reciprocating internal combustion engines driving generators (hereinafter referred to as "power stations"). Power stations driven by other drive forms may refer to this document. 2 Normative references The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 2423.16 Environmental testing — Part 2: Test methods — Test J and guidance: Mold growth GB/T 2820.5—2025 Reciprocating internal combustion engine driven alternating current generating sets — Part 5: Generating sets GB/T 2820.9 Reciprocating internal combustion engine driven alternating current generating sets — Part 9: Measurement and evaluation of mechanical vibrations GB/T 2820.10—2002 Reciprocating internal combustion engine driven alternating current generating sets — Part 10: Measurement of airborne noise by the enveloping surface method JB/T 8194 Terms for internal combustion engine power stations 3 Terms and definitions The terms and definitions given in JB/T 8194 apply to this document. 4 Classification of test methods Test methods are classified into the following series: — Series 100: Test methods for insulation performance; — Series 200: Test methods for component performance; — Series 300: Test methods for protective functions; — Series 400: Test methods for performance indicators; — Series 500: Test methods for safety performance; — Series 600: Test methods for radio disturbance; — Series 700: Test methods for environmental protection performance; — Series 800: Test methods for economic performance; — Series 900: Test methods for environmental adaptability; — Series 1000: Test methods for transportability; — Series 1100: Test methods for reliability and maintainability. 5 Test methods 5.1 Series 100: Test methods for insulation performance 5.1.1 Method 101: Insulation resistance measurement 5.1.1.1 Purpose Insulation resistance is an important indicator for evaluating insulation quality. Whether the insulation resistance is qualified directly affects safety and normal power supply, and also affects the normal progress of subsequent test items. To minimize leakage current from individual independent electrical circuits to earth and between circuits, the insulation resistance should be as high as possible. 5.1.1.2 Apparatus Megohmmeter or insulation resistance measuring instrument, with specifications selected according to rated circuit voltage Ur (Ur < 100 V: 250 V; 100 V <= Ur < 500 V: 500 V; 500 V <= Ur < 3 000 V: 1 000 V; Ur >= 3 000 V: 2 500 V; see Table 1). 5.1.1.3 Procedure The procedure shall comply with the following requirements: a) Measurement locations: between each independent electrical circuit and earth, and between circuits; b) Measurement conditions: cold state and/or hot state; c) Disconnect the circuit under test to make it completely independent; d) Disconnect or short-circuit all semiconductor devices, capacitors, etc., from the circuit under test; e) When measuring the insulation resistance to earth of a circuit composed of several windings, the leads of each winding may be connected together; f) Ground all circuits other than the circuit under test; g) Switches in the circuit shall be in the closed (ON) position during measurement; h) Operate according to the megohmmeter instruction manual; i) Record readings after the megohmmeter indication stabilizes (see Table 2); j) Repeat the above procedure for other circuits under test; k) After the insulation resistance measurement is completed, make an electrical connection from each measured circuit to the grounded enclosure to discharge it. 5.1.1.4 Results Compare results with product specifications. 5.1.2 Method 102: Dielectric test 5.1.2.1 Purpose The dielectric withstand voltage test is a more effective and direct method for identifying insulation strength. It is of decisive significance for judging whether the power station can continue to operate, and is also an important means to ensure safe power supply of the power station and prevent insulation accidents. Each independent electrical circuit to earth and between circuits shall be capable of withstanding a test voltage higher than the normal working voltage for a specified duration without damage. 5.1.2.2 Apparatus Adjustable AC high-voltage, current-limited power supply (dielectric test device). The test power frequency is 50 Hz, the voltage waveform is sinusoidal, and the capacity of the test transformer is not less than 1 kVA per kilovolt of test voltage. 5.1.2.3 Procedure The procedure shall comply with the following requirements: a) Test locations: between each independent electrical circuit and earth, and between circuits; b) Test conditions: cold state and/or hot state; c) Test steps: — Disconnect the circuit under test to make it completely independent; — Unless special designs are explicitly specified in product specifications, remove or short-circuit electrical parts of the prime mover, semiconductor devices, and capacitors from the circuit; — Reliably ground the dielectric test device, and connect the earth terminal of the power station and non-tested circuits to the same earth point; — Connect high-voltage leads from the dielectric test device to the circuit under test, with switches in the circuit in the closed (ON) position; — When performing circuit-to-earth dielectric tests, apply test voltage between the circuit under test and the earth terminal; when performing inter-circuit dielectric tests, apply test voltage between separate circuits; — Switch on power supply, starting at not more than half the full test voltage value, then increase uniformly or in steps of not more than 5% of full value to full value. The time for voltage to increase from half value to full value shall not be less than 10 s; — Maintain full test voltage for 1 min, then begin voltage reduction, and disconnect power supply after voltage drops to one-third of full value; — Ground the high-voltage leads of the dielectric test device to discharge the circuit under test to earth, and confirm the circuit under test is not energized; — Remove high-voltage leads, perform dielectric tests on remaining circuits according to the above procedure, and confirm in all cases that non-tested circuits are reliably grounded; — During test, if large fluctuations in voltmeter indication, sharp increases in ammeter indication, smoking of insulating materials, discharge sounds, or other abnormal phenomena are observed, immediately reduce voltage, disconnect power, and inspect after discharging the circuit under test; — Record relevant data and conditions (see Table 3). 5.1.2.4 Results Compare results with product specifications. 5.2 Series 200: Test methods for component performance 5.2.1 Method 201: Visual inspection 5.2.1.1 Purpose This inspection is an important basis for evaluating the visual and manufacturing quality of the power station. 5.2.1.2 Apparatus None. 5.2.1.3 Procedure Inspect the power station and record relevant conditions according to the items listed in Table 4: — Surface quality; — Paint coating quality; — Electroplating quality; — Riveting quality; — Welding quality; — Moving parts; — Fastening parts; — Sealing performance; — Leakage conditions (oil, water, air/gas); — Electrical installation; — Other items. 5.2.1.4 Results Compare results with product specifications. 5.2.2 Method 202: Completeness check 5.2.2.1 Purpose To check spare parts, accessories, tools, accompanying documentation, etc., that should be provided with the power station according to the operating instructions, to confirm whether their completeness satisfies relevant requirements. 5.2.2.2 Apparatus None. 5.2.2.3 Procedure The procedure shall comply with the following requirements: a) Check complete machine configuration (prime mover, generator, control panel); b) Check types, specifications, and quantities of spare parts, accessories, and tools; c) Check types, quantities, and contents of accompanying documents; d) Record relevant conditions (see Table 5). 5.2.2.4 Results Compare results with product specifications. 5.2.3 Method 203: Marking and packaging inspection 5.2.3.1 Purpose When carrying out certain functional tests and/or acceptance tests, the markings and packaging of the power station should generally be inspected to confirm whether markings and packaging satisfy requirements. 5.2.3.2 Apparatus None. 5.2.3.3 Procedure The procedure shall comply with the following requirements: a) Check that nameplates comply with specifications, relevant contents meet requirements, characters are correct and legible, and locations satisfy requirements; b) Check that signs and markings are correct, conspicuous, and placed in required locations; c) Check that packaging satisfies requirements, markings on packaging are correct and conspicuous, and characters are correct and legible; d) The above markings and characters shall not be erased or become illegible after wiping with cotton cloth; e) Record relevant conditions (see Table 6). 5.2.3.4 Results Compare results with product specifications. 5.2.4 Method 204: Mass measurement 5.2.4.1 Purpose Generally, the net mass of the power station shall be indicated; it is one of the bases for calculating specific mass (kg/kW). 5.2.4.2 Apparatus Weighing equipment. 5.2.4.3 Procedure The procedure shall comply with the following requirements: a) Power station fully equipped, in dry state without fuel, engine lubricating oil, and coolant; b) Place power station on weighing equipment; c) Record mass of power station (see Table 7); d) Power station fully equipped, fully filled with fuel, engine lubricating oil, and coolant; e) Repeat steps b) and c); f) Record relevant data and conditions (see Table 7). 5.2.4.4 Results Compare results with product specifications. 5.2.5 Method 205: Overall dimension measurement 5.2.5.1 Purpose The power station shall indicate overall dimensions in transport state and working state; it is one of the bases for calculating power density (kW/m³). 5.2.5.2 Apparatus Steel rule or measuring tape. 5.2.5.3 Procedure The procedure shall comply with the following requirements: a) Power station fully equipped (components having no effect on measured overall dimensions may be excluded), placed in transport state; b) Measure overall dimensions (length, width, height) of power station using steel rule or tape; c) Record relevant states and measured values (see Table 8); d) Power station fully equipped, placed in working state; e) Repeat steps b) and c). 5.2.5.4 Results Compare results with product specifications. 5.2.6 Method 206: Normal-temperature starting performance check 5.2.6.1 Purpose To check the normal starting capability of the power station at natural ambient temperature. 5.2.6.2 Apparatus Timer, speed detection device (tachometer). 5.2.6.3 Procedure The procedure shall comply with the following requirements: a) Place the power station in normal-temperature cold state; b) Select one of the starting modes configured on the power station (excluding low-temperature starting measures); c) Start the power station; d) Record start result ("success" or "failure"), starting time and starting speed of successful start (see Table 9); e) Confirm successful start when instrument readings display normally, running sound is smooth, and there is no abnormal vibration or shaking, then shut down; f) If instrument display is abnormal, running sound is uneven, or abnormal vibration/shaking occurs, confirm as "start failure", shut down for 2 min, and repeat steps c), d), and e). 5.2.6.4 Results
Contents of GB/T 20136-2025
Foreword V 1 Scope 2 Normative references 3 Terms and definitions 4 Classification of test methods 5 Test methods
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 3680948734
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB/T 20136-2025, GB 20136-2025, GBT 20136-2025, GB/T20136-2025, GB/T 20136, GB/T20136, GB20136-2025, GB 20136, GB20136, GBT20136-2025, GBT 20136, GBT20136