2025-12-19 10.8.118.215
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/SL 31-2003
SL 31-2003   Code of water pressure test in borehole for water resources and hydropower engineering (English Version)
Standard No.: SL 31-2003 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 4500 words Translation Price(USD):110.0 remind me the price change

Email:

Implemented on:2003-10-1 Delivery: via email in 1 business day

→ → →

,,2003-10-1,1411374128384348C3B0CBFAC9405
Standard No.: SL 31-2003
English Name: Code of water pressure test in borehole for water resources and hydropower engineering
Chinese Name: 水利水电工程钻孔压水试验规程
Chinese Classification: P1    
Professional Classification: SL    Professional Standard - Water Resources
Source Content Issued by: Ministry of Water Resources
Issued on: 2003-08-29
Implemented on: 2003-10-1
Status: valid
Superseding:SL 25-1992
Target Language: English
File Format: PDF
Word Count: 4500 words
Translation Price(USD): 110.0
Delivery: via email in 1 business day
1.0.1 The main tasks of water pressure test in borehole are measuring water permeability of rock mass and providing basic data for rock mass permeation performance evaluation and permeation control design. 1.0.2 This code is applicable to routine water pressure test work in geological exploration of water resources and hydropower engineering. 1.0.3 In addition to this code, the water pressure test also shall meet those specified in current relevant standards of the nation.
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 3.1 Test Method and Length of Test Section 3.2 Pressure Stage and Pressure Value 3.3 Test Borehole 3.4 Test Water and Test Personnel 4 Test Equipment 4.1 Water-stop Packer 4.2 Water Supply Equipment 4.3 Measurement Equipment 5 Site Test 5.1 Test Procedure 5.2 Hole Flushing 5.3 Test Section Segregation 5.4 Water Level Observation 5.5 Pressure and Flow Observation 6 Test Data Processing Appendix A Determination of Pressure Loss of Tube Appendix B Concrete Packer Casting Method Appendix C Calculation of the Rock Mass Permeability Coefficient with Water Pressure Test Results Appendix D Record Format of Water Pressure Test in Borehole Explanation of Wording in this Code
Code of China
Standard
SL 31-2003  Code of water pressure test in borehole for water resources and hydropower engineering (English Version)
Standard No.SL 31-2003
Statusvalid
LanguageEnglish
File FormatPDF
Word Count4500 words
Price(USD)110.0
Implemented on2003-10-1
Deliveryvia email in 1 business day
Detail of SL 31-2003
Standard No.
SL 31-2003
English Name
Code of water pressure test in borehole for water resources and hydropower engineering
Chinese Name
水利水电工程钻孔压水试验规程
Chinese Classification
P1
Professional Classification
SL
ICS Classification
Issued by
Ministry of Water Resources
Issued on
2003-08-29
Implemented on
2003-10-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
SL 25-1992
Language
English
File Format
PDF
Word Count
4500 words
Price(USD)
110.0
Keywords
SL 31-2003, SL/T 31-2003, SLT 31-2003, SL31-2003, SL 31, SL31, SL/T31-2003, SL/T 31, SL/T31, SLT31-2003, SLT 31, SLT31
Introduction of SL 31-2003
1.0.1 The main tasks of water pressure test in borehole are measuring water permeability of rock mass and providing basic data for rock mass permeation performance evaluation and permeation control design. 1.0.2 This code is applicable to routine water pressure test work in geological exploration of water resources and hydropower engineering. 1.0.3 In addition to this code, the water pressure test also shall meet those specified in current relevant standards of the nation.
Contents of SL 31-2003
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirements 3.1 Test Method and Length of Test Section 3.2 Pressure Stage and Pressure Value 3.3 Test Borehole 3.4 Test Water and Test Personnel 4 Test Equipment 4.1 Water-stop Packer 4.2 Water Supply Equipment 4.3 Measurement Equipment 5 Site Test 5.1 Test Procedure 5.2 Hole Flushing 5.3 Test Section Segregation 5.4 Water Level Observation 5.5 Pressure and Flow Observation 6 Test Data Processing Appendix A Determination of Pressure Loss of Tube Appendix B Concrete Packer Casting Method Appendix C Calculation of the Rock Mass Permeability Coefficient with Water Pressure Test Results Appendix D Record Format of Water Pressure Test in Borehole Explanation of Wording in this Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
SL 31-2003, SL/T 31-2003, SLT 31-2003, SL31-2003, SL 31, SL31, SL/T31-2003, SL/T 31, SL/T31, SLT31-2003, SLT 31, SLT31