GB/T 50502-2009 Code for Construction Organization Plan of Building Engineering (English)
Standard No.
GB/T 50502-2009
Status
Latest
Language
File Format
PDF
Price
120 USD
Delivery Time
within 1 business day
Superseding
Chinese Name
����ʩ����֯��ƹ淶
English Name
Chinese Standard Classification
Professional Classification
ICS Classification
Issued on
2009-05-13
Implemented on
2009-10-01
Abolished on
Issued by
MOC
Chinese Pages
Word Count
6,000 words
1 General Provisions 1.0.1 This code is formulated in order to standardize the compilation and management of construction organization plan of building engineering, as well as improve the construction management level of construction engineering. 1.0.2 This code is applicable to the compilation and management for construction organization plan of construction, extension and renovation engineering. 1.0.3 Construction organization plan of building engineering shall be compiled according to the local conditions and engineering characteristics. 1.0.4 Not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with for the compilation and management of construction organization plan of building engineering.
2 Terms 2.0.1 Construction organization plan Construction organization plan is the comprehensive document compiled focusing on the construction projects for instructing construction technology, economy and management. 2.0.2 General construction organization plan General construction organization plan is the construction organization plan compiled focusing on group projects or especially-large projects composed of several unit projects, as well as playing a role of overall planning and selective control during the construction process of the whole project. 2.0.3 Construction organization plan for unit project Construction organization plan for unit project is the construction organization plan compiled focusing on unit (subunit) project, as well as playing a role of instruction and restriction during the construction process of the unit (subunit) project. 2.0.4 Construction scheme Construction scheme is the construction technique and organization scheme compiled focusing on part (item) project or special project for instructing its construction process. 2.0.5 Dynamic management of construction organization plan Dynamic management of construction organization plan is the timely management activity for the implementation, inspection and modification of construction organization plan during the process of project implementation. 2.0.6 Construction arrangement Construction arrangement is the overall planning and comprehensive arrangement worked out during the process of project implementation, including primary targets, construction sequence, space organization and construction organization arrangement of project construction. 2.0.7 Project management organization Project management organization is established by the construction organization for completing the construction projects. 2.0.8 Construction schedule Construction schedule is the overall planning and arrangement for the construction sequence, beginning and ending time and mutual connection relations of each construction process, in order to realize the schedule goal set for the project. 2.0.9 Construction resources Construction resources are the production factors such as manpower and materials required for completing the construction projects. 2.0.10 Construction site layout plan Construction site layout plan is the plan and arrangement for each production, domestic and other ancillary facilities within the scope of construction site. 2.0.11 Schedule management plan Schedule management plan is the management plan ensuring to achieve the project construction schedule objectives, including measurement and analysis for schedule and it deviation, necessary measures adopted, and change of plan, etc. 2.0.12 Quality management plan