1.0.1 This code was formulated with a view to improving the construction level of boiler installation engineering, promoting technical progress, guaranteeing the construction quality and safety, and improving economic benefit.
1.0.2 This code is applicable to the construction and acceptance of the installation engineering of industrial and civil boilers, fixed steam boilers whose rated working pressure is less than or equal to 3.82MPa in district heating, fixed hot water boilers whose rated output water pressure is larger than 0.1MPa and organic heat transfer material boilers.
This code is not applicable for the construction and acceptance of installation engineering of cast iron boilers, vehicular and marine boilers, nuclear boilers and station boilers.
1.0.3 Before or during the boiler installation process, the installation must be ceased if the members in compression have quality problems which affect the safe handling and these problems shall be reported to the construction organizations.
1.0.4 Except for those specified in this code, those in the current national standards also shall be complied with for the construction and acceptance of boiler installation.
1 General Provision 1
2 Foundation Retest and Scoring 2
3 Steel Frame 3
4 Drum, Header Tank and Heating Surface Pipe 5
4.1 Drum and Header Tank 5
4.2 Heating Surface Pipe 7
4.3 Welding of Pressure Parts 10
4.4 Economizer & Steel Pipe Air Preheater 12
5 Pressure Test 14
6 Tap, Instrument, Valve, Soot Blower and Auxiliary Equipment 16
6.1 Tap 16
6.2 Instrument 18
6.3 Valve, Soot Blower and Auxiliary Equipment 20
7 Combustion Equipments 23
7.1 Fire grate 23
7.2 Spreader Feeder 26
7.3 Burner 26
8 Boiler Masonry and Thermal Insulation Blanket 27
8.1 Boiler Masonry 27
8.2 Thermal Insulation Blanket 27
9 Air Leakage Test, Drying Boiler, Boiling out, Leak test and Trial Run 29
9.1 Air Leakage Test 29
9.2 Drying Boiler 30
9.3 Boiling Out 31
9.4 Leak Test and Trial Run 32
10 Engineering Acceptance 34
Explanation of Wording in This Code 36