| Chinese National Standard List: Electric power system equipment installation testing |
|
DL/T 818-2002 Technical guide for carbide phase analysis of low alloy heat resistant steels
Issued on: 2002-4-27 Translation Price(USD): 300.0 |
|
DL/T 812-2002 Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method
Issued on: 2002-4-27 Translation Price(USD): 180.0 |
|
DL/T 809-2002 Water quality -- Determination of turbidity
Issued on: 2002-4-27 Translation Price(USD): 274.0 |
|
DL/T 782-2001 Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above
Issued on: 2001-10-08 Translation Price(USD): 330.0 |
|
DL/T 466-1992 Guide for Type Selection for Pulverizers and Pulverizing Systems of Power Station
Issued on: Translation Price(USD): 270.0 |
|
GB/T 8564-2003 Specification for Installation of Hydraulic Turbine Generator Uni
Issued on: 2003-09-15 Translation Price(USD): 340.0 |
|
DL/T 822-2002 Code for Test and Acceptance of Computer Monitoring and Control Sy
Issued on: 2002-09-16 Translation Price(USD): 250.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 Email: coc@codeofchina.com | |
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 |