![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
CAS 165-2008 Testing Method for Power Saving Rate of Power Saver for Asynchronous Motor
Issued on: Price(USD): 450.0 |
|
GB/T 33346-2025 Busbar trunking systems (compact insulated busways) for wind power
Issued on: 2025-8-1 Price(USD): 315.0 |
|
GB/T 33341-2025 The swapping battery pack rack of electric vehicle
Issued on: 2025-8-1 Price(USD): 375.0 |
|
GB/T 755-2025 Rotating electrical machines - Rating and performance
Issued on: 2025-8-1 Price(USD): 580.0 |
|
GB/T 20833.2-2025 Rotating electrical machines - Winding insulation - Part 2: On-line partial discharge measurements on the stator winding insulation
Issued on: 2025-8-1 Price(USD): 795.0 |
|
GB/T 21209-2025 AC electrical machines used in power drive systems - Application guide
Issued on: 2025-8-1 Price(USD): 1275.0 |
|
GB/T 30104.101-2025 Digital addressable lighting interface - Part 101: General requirements - System components
Issued on: 2025-8-1 Price(USD): 795.0 |
|
GB/T 30104.207-2025 Digital addressable lighting interface - Part 207: Particular requirements for control gear - LED modules (device type 6)
Issued on: 2025-8-1 Price(USD): 255.0 |
|
GB/T 45905.1-2025 Electricity spot market operation - Part 1: Terminology
Issued on: 2025-8-1 Price(USD): 255.0 |
|
GB/T 45905.8-2025 Electricity spot market operation - Part 8: Calculation method of multi-period power and energy balance
Issued on: 2025-8-1 Price(USD): 150.0 |
|
GB/T 45906.2-2025 Substation secondary system - Part 2: Data and model
Issued on: 2025-8-1 Price(USD): 645.0 |
|
GB/T 45906.3-2025 Substation secondary system - Part 3: Communication message specification
Issued on: 2025-8-1 Price(USD): 1050.0 |
|
GB/T 45906.1-2025 Substation secondary system - Part 1: General requirement
Issued on: 2025-8-1 Price(USD): 180.0 |
|
GB/T 45905.10-2025 Electricity spot market operation - Part 10: The evaluation of operation
Issued on: 2025-8-1 Price(USD): 270.0 |
|
GB/T 45906.8-2025 Substation secondary system - Part 8: Preventing electric mal-operation
Issued on: 2025-8-1 Price(USD): 210.0 |
|
GB/T 45906.9-2025 Substation secondary system - Part 9: Construction specifications
Issued on: 2025-8-1 Price(USD): 210.0 |
|
GB/T 45906.10-2025 Substation secondary system - Part 10: Test and detection
Issued on: 2025-8-1 Price(USD): 315.0 |
|
GB/T 45906.6-2025 Substation secondary system - Part 6: Substation monitoring and control system
Issued on: 2025-8-1 Price(USD): 255.0 |
|
GB/T 30104.102-2025 Digital addressable lighting interface - Part 102: General requirements - Control gear
Issued on: 2025-8-1 Price(USD): 990.0 |
|
NB/T 11794-2025 Guide for item segregation of system design expense for high-voltage direct current (HVDC) transmission project
Issued on: 2025-06-30 Price(USD): 330.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||