Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
DL/T 5067-1996 |
Code on compiling feasibility study report of wind power projects |
$570.00 |
via email in 1~5 business day |
valid,,1997-5-1 |
|
DL/T 5068-2006 |
Technical Code for Designing Chemistry of Thermal Power Plants |
$620.00 |
immediately |
superseded,2015-3-1,2007-3-1 |
|
DL/T 5072-2007 |
Code for designing insulation and painting of fossil fuel power plant |
$360.00 |
immediately |
superseded,2020-5-1,2007-12-1 |
|
DL/T 5076-2008 |
Technical code of exploration and surveying for 220kV and lower level overhead transmission line |
$1380.00 |
via email in 1~3 business day |
superseded,2024-4-11,2008-11-1 |
|
DL/T 5079-2007 |
Design specifications for hydropower headrace and forebay |
$720.00 |
via email in 1~3 business day |
superseded,2023-8-6,2008-6-1 |
|
DL/T 5083-2004 |
Specification of prestressing tendon construction for hyudropower and water conservancy project |
$1500.00 |
via email in 1~10 business day |
abolished2011-05-01,2010-10-1,2004-6-1 |
|
DL/T 5096-2008 |
Drilling technical regulations of electrical power engineering |
$780.00 |
via email in 1~3 business day |
valid,,2008-11-1 |
|
DL/T 5102-2013 |
Technical Code for Geotechnical Centrifuge Model Tests |
$1164.00 |
via email in 1~5 business day |
valid,,2014-4-1 |
|
DL/T 5112-2009 |
Construction specification for hydraulic roller compacted concrete |
$370.00 |
immediately |
superseded,2021-7-1,2009-12-1 |
|
DL/T 5113.1-2005 |
Quality degree evaluate standard of unit engineering for hydropower and water conservancy construction engineering Part 1:Civil department |
$2160.00 |
via email in 1~3 business day |
superseded,2019-10-1,2005-6-1 |
|
DL/T 5113.14-2018 |
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project |
$855.00 |
via email in 1~5 business day |
valid,,2018-7-1 |
|
DL/T 5113.15-2023 |
Standard for quality grade evaluation of separated item projects for hydropower and water conservancy construction engineering Part 15: Safety monitoring engineering |
$1275.00 |
via email in 1~5 business day |
valid,,2024-4-11 |
|
DL/T 5130-2001 |
Technical regulation for design of steel transmission pole |
$200.00 |
immediately |
abolished2021-02-01,2020-12-1,2002-2-1 |
|
DL/T 5131-2001 |
The rural electric network construct and reconstruct technical guide |
$270.00 |
via email in 1~3 business day |
superseded,2015-9-1,2002-2-1 |
|
DL/T 5132-2001 |
Specifications for design secondary circuit of hydroelectric powerplants |
$690.00 |
via email in 1~3 business day |
superseded,2016-6-1,2002-2-1 |
|
DL/T 5133-2001 |
Design guide of construction equipment selection for hydropower and water conservancy project |
$1110.00 |
via email in 1~3 business day |
superseded,2020-5-1,2002-2-1 |
|
DL/T 5134-2001 |
Design guide of construction transportation for hydropower and water conservancy project |
$480.00 |
via email in 1~3 business day |
superseded,2020-7-1,2002-2-1 |
|
DL/T 5136-2001 |
Technical Code for Designing of Electrical Secondary Wiring in Fossil Fuel Power Plants and Substations |
$700.00 |
immediately |
abolished2013-03-01,2013-3-1,2002-5-1 |
|
DL/T 5137-2001 |
Technical code for designing electrical measuring and energy metering device |
$350.00 |
immediately |
valid,,2002-5-1 |
|
DL/T 5138-2001 |
Technical specifications for aerial photographing and surveying of overhead transmission line |
$1450.00 |
via email in 1~5 business day |
abolished2015-03-01,2015-3-1,2002-5-1 |
|
|