![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
DL/T 1071-2023 Specification for transportation of electrical power large equipment
Issued on: 2023-5-26 Price(USD): 960.0 |
|
DL/T 924-2023 Specification for supervisory information system for plant level of fossil fuel power plant
Issued on: 2023-5-26 Price(USD): 285.0 |
|
DL/T 802.8-2023 Technical requirements for power cable conduits-Part 8: Cable conduits of plastic steel composite
Issued on: 2023-5-26 Price(USD): 225.0 |
|
DL/T 1090-2023 Guide for reliability evaluation indices of series compensation device
Issued on: 2023-5-26 Price(USD): 255.0 |
|
NB/T 31091-2023 Technical specification of wind turbine set supply scope
Issued on: 2023-5-26 Price(USD): 120.0 |
|
NB/T 42035-2023 Fundamental technical specifications for turbine pressure relief valve and its control system
Issued on: 2023-5-26 Price(USD): 150.0 |
|
NB/T 31090-2023 Technical specification of grid-connected wind turbine after sale service
Issued on: 2023-5-26 Price(USD): 150.0 |
|
DL/T 578-2023 Specification of computer supervision and control system for hydropower plant
Issued on: 2023-5-26 Price(USD): 1035.0 |
|
DL/T 669-2023 Classification of work under heat stress in electric power industry
Issued on: 2023-5-26 Price(USD): 210.0 |
|
NB/T 20663-2023 Technical Specification for Installation of Ventilation System of PWR Nuclear Power Plant Nuclear Island
Issued on: 2023-5-26 Price(USD): 285.0 |
|
NB/T 20665-2023 Design criteria for the interface between the nuclear steam supply system and the steam turbine building of a pressurized water reactor nuclear power plant
Issued on: 2023-5-26 Price(USD): 135.0 |
|
NB/T 20662-2023 Categorization of conditions of PWR nuclear power plants
Issued on: 2023-5-26 Price(USD): 180.0 |
|
NB/T 20664-2023 Technical guidelines for nuclear island cooling chain commissioning of pressurizedwater reactor nuclear power plant
Issued on: 2023-5-26 Price(USD): 165.0 |
|
NB/T 20667-2023 General requirements for protection design against internal hazards in pressurizedwater reactor nuclear power plant
Issued on: 2023-5-26 Price(USD): 405.0 |
|
NB/T 20668-2023 The general requirement of protection design against external hazard in pressurizedwater reactor nuclear power plant
Issued on: 2023-5-26 Price(USD): 375.0 |
|
NB/T 20666-2023 Design criteria for nuclear sampling systems in pressurized water reactor nuclear power plants
Issued on: 2023-5-26 Price(USD): 150.0 |
|
NB/T 20669-2023 Design criteria for emergency core cooling system of pressurized water reactor nuclear power plant
Issued on: 2023-5-26 Price(USD): 225.0 |
|
NB/T 20674-2023 Technical specification for installation of primary piping|| surge line and related supports in PWR nuclear power plant
Issued on: 2023-5-26 Price(USD): 210.0 |
|
NB/T 20670-2023 Technical guideline of emergency feedwater system commissioning for pressurized water reactor nuclear power plant
Issued on: 2023-5-26 Price(USD): 135.0 |
|
NB/T 20672-2023 Technical Specification for Installation of Steam Generators in PWR nuclear power plant
Issued on: 2023-5-26 Price(USD): 270.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||