![]() |
Chinese Standard Classification
Professional Classification
ICS Classification
Latest
|
| Position: Search | valid to be valid superseded to be superseded abolished to be abolished |
| Search |
|
GB/T 19155-2017 Temporarily installed suspended access equipment
Issued on: 2017-07-12 Price(USD): 560.0 |
|
GB/T 20062-2017 Mobile cranes—Limits and measurement methods for operating noise
Issued on: 2017-12-29 Price(USD): 220.0 |
|
GB/T 5226.32-2017 Electrical safety of machinery-Electrical equipment of machines- Part 32:Requirements for hoisting machines
Issued on: 2017-12-29 Price(USD): 1200.0 |
|
GB/T 24818.4-2017 Cranes―Access, guards and restraints―Part 4:Jib cranes
Issued on: 2017-10-14 Price(USD): 80.0 |
|
GB/T 6974.2-2017 Cranes - Vocabulary - Part 2: Mobile cranes
Issued on: 2017-10-14 Price(USD): 190.0 |
|
T/CEC 162-2018 Maintenance platform for boiler furnace
Issued on: 2018-01-24 Price(USD): |
|
GB/T 24816-2017 Round steel short link chains for general lifting purposes--Grade 8, medium to lerance sling chains for chain slings
Issued on: 2017-09-07 Price(USD): 310.0 |
|
GB/T 34025-2017 Pinion type progressive safety device for builders hoist
Issued on: 2017-07-12 Price(USD): 220.0 |
|
GB/T 34023-2017 Code of practice for the safety use of builders’hoists
Issued on: 2017-07-12 Price(USD): 610.0 |
|
GB/T 34029-2017 Boiler furnace maintenance elevating platform
Issued on: 2017-07-12 Price(USD): 220.0 |
|
GB/T 33545-2017 General technical requirement for lifting magnets
Issued on: 2017-03-09 Price(USD): 180.0 |
|
GB/T 31052.4-2017 Lifting appliances―Code of inspection and maintenance―Part 4:Jib cranes
Issued on: 2017-05-12 Price(USD): 310.0 |
|
GB/T 31052.12-2017 Lifting appliances―Code of inspection and maintenance―Part 12:Floating cranes
Issued on: 2017-05-12 Price(USD): 310.0 |
|
GB/T 33640-2017 Installation quality inspection code of rack and pinion hoists for persons and materials
Issued on: 2017-05-12 Price(USD): 220.0 |
|
GB/T 13752-2017 Design rules for tower cranes
Issued on: 2017-03-03 Price(USD): 3030.0 |
|
GB/T 25852-2017 Forged steel lifting components of grade 8
Issued on: 2017-02-28 Price(USD): 220.0 |
|
GB/T 33504-2017 Mobile suspended work platform
Issued on: 2017-03-03 Price(USD): 370.0 |
|
SL 375-2017 Technical requiremens of cable crane for water and hydropower construction
Issued on: 2017-03-24 Price(USD): 340.0 |
|
GB/T 24817.3-2016 Cranes一Control layout and characteristics一 Part 3:Tower cranes
Issued on: 2016-10-13 Price(USD): 80.0 |
|
GB/T 31052.3-2016 Lifting appliances-Code of inspection and maintenance-- Part3:Tower cranes
Issued on: 2016-10-13 Price(USD): 250.0 |
| Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886 | ||
| Copyright: Beijing COC Tech Co., Ltd. 2008-2040 | ||