Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
SY/T 6484-2013 |
Recommended Practices for Operation, Maintenance, Surveillance and Troubleshooting of Gas-lift Installations |
$960.00 |
via email in 1~5 business day |
valid,,2014-4-1 |
|
SY/T 6485-2000 |
Specification for oil production engineering project in polymer flooding |
$180.00 |
via email in 1~3 business day |
superseded,2018-3-1,2001-6-1 |
|
SY/T 6486-2000 |
Recommended opertional method for preventing of clay - Swelling and fine-migration in acidizing of water injection well |
$270.00 |
via email in 1~3 business day |
superseded,2018-3-1,2001-6-1 |
|
SY/T 6487-2000 |
Recommended practices for liquid CO2 huff and puff |
$320.00 |
via email in 1~3 business day |
superseded,2019-3-1,2001-6-1 |
|
SY/T 6528-2002 |
Test method of the rock dielectric constant |
$270.00 |
via email in 1~3 business day |
valid,,2002-8-1 |
|
SY/T 6565-2003 |
Technique requirements for CO2 injection in petroleum or water well safety |
$105.00 |
via email in 1~3 business day |
superseded,2011-11-1,2003-8-1 |
|
SY/T 6566-2003 |
Hydraulic fracturing safety technique specification |
$135.00 |
via email in 1~3 business day |
abolished2008-03-01 ,2008-3-1,2003-8-1 |
|
SY/T 6570-2003 |
Regulations drafted for the lift technology design of oil-wells |
$390.00 |
via email in 1~3 business day |
superseded,2018-3-1,2003-8-1 |
|
SY/T 6572-2003 |
Evaluation methods of resin performance for sand control |
$75.00 |
via email in 1~3 business day |
valid,,2003-8-1 |
|
SY/T 6596-2004 |
Recommended practice for produced -- water reinjection in gas field |
$90.00 |
immediately |
abolished2017-05-01,2017-5-1,2004-11-1 |
|
SY/T 6640-2005 |
The calibration methodology of the down hole electronic pressure gauge |
$165.00 |
via email in 1~3 business day |
superseded,2012-3-1,2005-10-1 |
|
SY/T 6644-2006 |
Recommended Practice for Design of Continuous Flow Gas Lift Installations Using Injection Pressure Operated Valves |
$975.00 |
via email in 1~3 business day |
superseded,2019-3-1,2005-10-1 |
|
SY/T 6645-2006 |
Regulations drafted for the injection and production well of perforated completion design of the underground gas storage about the depleted sandstone reservoir |
$255.00 |
via email in 1~3 business day |
superseded,2020-5-1,2005-10-1 |
|
SY/T 6646-2006 |
Well Abandonment and Inactive Well Practices |
$570.00 |
via email in 1~3 business day |
superseded,2018-3-1,2005-10-1 |
|
SY/T 6675-2007 |
The calibration methodology of the down hole flow meter gauge |
$135.00 |
via email in 1~3 business day |
valid,,2008-3-1 |
|
SY/T 6678-2007 |
The calibration methodology of the electronic dynamometer |
$135.00 |
via email in 1~3 business day |
valid,,2008-3-1 |
|
SY/T 6690-2008 |
Specification for well control technology of downhole operation |
$420.00 |
via email in 1~5 business day |
superseded,2016-6-1,2008-12-1 |
|
SY/T 6694-2007 |
Lifting technology designs for hydraulic piston pumps & jet pumps |
$360.00 |
via email in 1~3 business day |
abolished2018-08-24,,2008-3-1 |
|
SY/T 6740-2008 |
The calibration method of caliper |
$150.00 |
via email in 1~3 business day |
valid,,2008-12-1 |
|
SY/T 6743-2008 |
The caliration method of gamma-ray tool |
$210.00 |
via email in 1~3 business day |
superseded,2020-5-1,2008-12-1 |
|
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[2][3][4][5][6][7][8]
Next
End
* Related standard quantity: * Page quantity: *
Current: * First
Previous
[2][3][4][5][6][7][8]
Next
End
|