2025-6-17 18.97.14.84
Code of China Chinese Standard Classification Professional Classification ICS Classification Latest
Position: Search valid to be valid superseded to be superseded abolished to be abolished
Standard No. Title Price(USD) Delivery Status Add to Cart
CJ/T 236-2006 Urban railway transportation platform screen door systen 170.0 via email in 1 business day abolished2022-05-01,2022-5-1,2007-3-1
CJ/T 453-2014 Subway tunnel flood gate 374.0 via email in 1~3 business day valid,,2014-11-1
CJJ 49-1992 Technical Regulation for Protection against Subway Stray Current Corrosion 200.0 via email in 1 business day superseded,2020-10-1,1993-4-1
DB11/T 2340-2024 Technical specification for application of signal system for urban rail transit via email in business day valid,,2025-4-1
DB14/T 2575-2022 via email in business day valid,,2023-3-2
DB32/T 3985-2021 Technical specification for plant protection on river or lake bank slopes 360.0 via email in 1~5 business day valid,,
DB32/T 4351-2022 Technical code for projection structures of urban rail transit via email in business day valid,,
DB32/T 4850-2024 Specification for design of city group intercity railway via email in business day valid,,2024-10-20
DB32/T 5032-2025 Technical specification for the intelligent monitoring and early warning system of urban rail transit track areas via email in business day valid,,2025-3-6
DB37/T 4440.2-2021 Urban rail transit systems specification for interoperability—Signaling system—Part 2: ATS workstation man machine interface 495.0 via email in 1~5 business day valid,,2021-12-17
DB37/T 4440.3-2021 Urban rail transit systems specification for interoperability—Signaling system— Part 3: Engineering design 345.0 via email in 1~5 business day valid,,2021-12-17
DB37/T 4440.4-2021 Urban rail transit systems specification for interoperability—Signaling system— Part 4: Onboard man machine interface 195.0 via email in 1~3 business day valid,,2021-12-17
DB37/T 4445-2021 Specification for safety risk assessment of urban rail transit engineering design 285.0 via email in 1~3 business day valid,,2021-12-17
DB61/T 1626-2022 Technical Specifications for Cross-tensioned prestressed concrete bridge deck pavement via email in business day valid,,
GB 12758-1991 Signal system for subway-General specification 90.0 via email in 1~3 business day superseded,2004-8-1,1991-12-1
GB 14227-1993 Acoustical requirement and measurement on station platform of urban rail transit 184.0 via email in 1~3 business day abolished2006-08-01,2006-8-1,1993-11-1
GB 50090-1999 Code for design of railway line 1980.0 via email in 1~10 business day abolished2006-06-01,2006-6-1,1999-7-1
GB 50090-2006 Code for design of railway line 330.0 via email in 1~3 business day valid,,2006-6-1
GB 50091-1999 Code for designing railway station and terminal 2415.0 via email in 1~10 business day abolished2006-06-01,2006-6-1,1999-7-1
GB 50091-2006 Code for design of railway station and terminal 795.0 via email in 1~5 business day valid,,2006-6-1
* Related standard quantity: * Page quantity: * Current: * First Previous Next End



Code of China
Search

CJ/T 236-2006 Urban railway transportation platform screen door systen 
  Issued on: 2006-11-29   Price(USD): 170.0
CJ/T 453-2014 Subway tunnel flood gate 
  Issued on: 2014-04-22   Price(USD): 374.0
CJJ 49-1992 Technical Regulation for Protection against Subway Stray Current Corrosion 
  Issued on: 25-Jul-92   Price(USD): 200.0
DB11/T 2340-2024 Technical specification for application of signal system for urban rail transit 
  Issued on: 2024-12-25   Price(USD):
DB14/T 2575-2022  
  Issued on: 2022-12-02   Price(USD):
DB32/T 3985-2021 Technical specification for plant protection on river or lake bank slopes 
  Issued on: 2021-02-03   Price(USD): 360.0
DB32/T 4351-2022 Technical code for projection structures of urban rail transit 
  Issued on: 2022-09-16   Price(USD):
DB32/T 4850-2024 Specification for design of city group intercity railway 
  Issued on: 2024-09-20   Price(USD):
DB32/T 5032-2025 Technical specification for the intelligent monitoring and early warning system of urban rail transit track areas 
  Issued on: 2025-02-06   Price(USD):
DB37/T 4440.2-2021 Urban rail transit systems specification for interoperability—Signaling system—Part 2: ATS workstation man machine interface 
  Issued on: 2021-11-17   Price(USD): 495.0
DB37/T 4440.3-2021 Urban rail transit systems specification for interoperability—Signaling system— Part 3: Engineering design 
  Issued on: 2021-11-17   Price(USD): 345.0
DB37/T 4440.4-2021 Urban rail transit systems specification for interoperability—Signaling system— Part 4: Onboard man machine interface 
  Issued on: 2021-11-17   Price(USD): 195.0
DB37/T 4445-2021 Specification for safety risk assessment of urban rail transit engineering design 
  Issued on: 2021-11-17   Price(USD): 285.0
DB61/T 1626-2022 Technical Specifications for Cross-tensioned prestressed concrete bridge deck pavement 
  Issued on: 2022-11-07   Price(USD):
GB 12758-1991 Signal system for subway-General specification 
  Issued on: 1991-03-26   Price(USD): 90.0
GB 14227-1993 Acoustical requirement and measurement on station platform of urban rail transit 
  Issued on: 1993-03-06   Price(USD): 184.0
GB 50090-1999 Code for design of railway line 
  Issued on:   Price(USD): 1980.0
GB 50090-2006 Code for design of railway line 
  Issued on: 2006-3-24   Price(USD): 330.0
GB 50091-1999 Code for designing railway station and terminal 
  Issued on: 1999-03-08   Price(USD): 2415.0
GB 50091-2006 Code for design of railway station and terminal 
  Issued on: 2006-3-24   Price(USD): 795.0
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040