| Standard No. |
Title |
Price(USD) |
Delivery |
Status |
Add to Cart |
| GB/T 6907-2005 |
Analysis of water used in boil and cooling system - The sampling method of water |
115.0 |
via email in 1~3 business day |
superseded,2022-10-1,2005-12-1 |
|
| GB/T 16508.1-2013 |
Shell Boilers - Part 1: General Requirements |
130.0 |
via email in 1 business day |
superseded2022-10-01,2022-10-1,2014-7-1 |
|
| GB 10656-1989 |
Analytical methods for boiler water and cooling water-Determination of zinc ion-Zincon spectrophotometry |
30.0 |
via email in 1~3 business day |
superseded2008-09-01,2008-9-1,1989-10-1 |
|
| GB 8589-1988 |
Specification for cyclone dust collecter of industrial boiler |
130.0 |
via email in 1~3 business day |
valid,,1988-10-1 |
|
| GB/T 16507.1-2013 |
Water-tube Boilers - Part 1: General Requirement |
150.0 |
via email in 1 business day |
superseded,2022-10-1,2014-7-1 |
|
| SD 212-1987 |
Standard System Table for Electricity Fuel Coal Machinery |
630.0 |
via email in 1~5 business day |
valid,,1994-12-1 |
|
| CBWQA/T 0003-2013 |
Dirt separator |
120.0 |
via email in 1~3 business day |
valid,,2013-12-1 |
|
| JB 5339-1991 |
Seismic Design Standard for Boiler Structure |
180.0 |
via email in 1~3 business day |
abolished2015-01-14,,1992-7-1 |
|
| GB/T 16507.3-2013 |
Water-tube Boilers - Part 3: Structure Design |
120.0 |
via email in 1 business day |
superseded,1996-12-1,2014-7-1 |
|
| JB/T 9625-1999 |
Specification for pressure retaining casting of boller pipe fittings |
130.0 |
via email in 1~3 business day |
superseded,2023-11-26,2000-1-1 |
|
| JB/T 9619-1999 |
Specifications for indudtrial boiler tube expansion technology |
224.0 |
via email in 1~3 business day |
abolished2015-01-14 ,,2000-1-1 |
|
| GB/T 12155-1989 |
Analysis of water used in boiler and cooling system--Determination for sodium--Dynamic method |
220.0 |
via email in 1~3 business day |
abolished2005-10-14 ,,1990-1-1 |
|
| JB/T 9618-1999 |
Design criteria for interior devices of industrial boiler drum |
600.0 |
via email in 1~3 business day |
valid,,2000-1-1 |
|
| JC 468-1992 |
|
45.0 |
via email in 1~3 business day |
superseded2017-10-01 ,2017-10-1,1993-1-1 |
|
| JB/T 1618-1992 |
Pressure parts of boiler shell - Manufacturing specification |
180.0 |
via email in 1~3 business day |
superseded,2003-4-1,1993-5-1 |
|
| T/CEEIA 221-2013 |
Pulver Coal-fired Industrial Boiler and System |
|
via email in business day |
valid,,2013-7-1 |
|
| GB/T 16507.5-2013 |
Water-tube Boilers - Part 5: Fabrication |
350.0 |
via email in 1 business day |
superseded,1996-12-1,2014-7-1 |
|
| GB/T 16508.6-2013 |
Shell Boilers - Part 6: Combustion Systems |
110.0 |
via email in 1 business day |
superseded,2023-2-1,2014-7-1 |
|
| GB/T 1921-1988 |
Specifications for industrial steam boiler |
180.0 |
via email in 1~3 business day |
superseded,2004-6-1,1989-1-1 |
|
| GB/T 16508.8-2013 |
Shell Boilers - Part 8: Operation |
130.0 |
via email in 1 business day |
superseded2023-02-01,2023-2-1,2014-7-1 |
|
|
|