2025-12-10 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/CECS 279-2010
CECS 279-2010   Technical Specification of Dynamic Consolidation to Ground Treatment (English Version)
Standard No.: CECS 279-2010 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 10000 words Translation Price(USD):250.0 remind me the price change

Email:

Implemented on:2010-11-1 Delivery: via email in 1 business day

→ → →

,,2010-11-1,141137726521654B724A17ABBBFDA
Standard No.: CECS 279-2010
English Name: Technical Specification of Dynamic Consolidation to Ground Treatment
Chinese Name: 强夯地基处理技术规程
Professional Classification: CECS    Engineering Construction Standard
Source Content Issued by: CECS
Issued on: 2010-08-16
Implemented on: 2010-11-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 10000 words
Translation Price(USD): 250.0
Delivery: via email in 1 business day
1.0.1 This specification was formulated with a view to enhancing design, construction and quality test of ground treatment by heavy tamping, implementing the national technical and ecnomic policies, and achieving technical advancement, safety and usability, economy rationality and high quality and environmental protection. 1.0.2 This specification is applicable to design, construction and quality test of ground treatment by heavy tamping, including natural foundation, artificial filling foundation and special soil foundation. 1.0.3 Ground treatment by heavy tamping shall satisfy such principles as adjusting measures to local conditions, using local materials and saving resources. 1.0.4 Engineering of ground treatment by heavy tamping shall not only meet the requirements of this specification, but also comply with those specified in the current relevant national standards.
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirement 4 Design 4.1 General Requirement 4.2 Heavy Tamping 4.3 Dynamic Replacement 4.4 Special Soil Foundation Treatment by Heavy Tamping 4.5 Artificial Filling Foundation Treatment by Heavy Tamping 5 Construction 5.1 General Requirement 5.2 Preparation of Construction Site 5.3 Construction Machine 5.4 Construction Procedure 5.5 Construction Quality Control and Monitor 5.6 Environmental Protection 6 Quality Test and Acceptance 6.1 Quality Test and Acceptance of Heavy Tamping 6.2 Quality Test and Acceptance of Dynamic Replacement Explanation of Wording in This Specification List of Quoted Standards
Code of China
Standard
CECS 279-2010  Technical Specification of Dynamic Consolidation to Ground Treatment (English Version)
Standard No.CECS 279-2010
Statusvalid
LanguageEnglish
File FormatPDF
Word Count10000 words
Price(USD)250.0
Implemented on2010-11-1
Deliveryvia email in 1 business day
Detail of CECS 279-2010
Standard No.
CECS 279-2010
English Name
Technical Specification of Dynamic Consolidation to Ground Treatment
Chinese Name
强夯地基处理技术规程
Chinese Classification
Professional Classification
CECS
ICS Classification
Issued by
CECS
Issued on
2010-08-16
Implemented on
2010-11-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
10000 words
Price(USD)
250.0
Keywords
CECS 279-2010, CECS/T 279-2010, CECST 279-2010, CECS279-2010, CECS 279, CECS279, CECS/T279-2010, CECS/T 279, CECS/T279, CECST279-2010, CECST 279, CECST279
Introduction of CECS 279-2010
1.0.1 This specification was formulated with a view to enhancing design, construction and quality test of ground treatment by heavy tamping, implementing the national technical and ecnomic policies, and achieving technical advancement, safety and usability, economy rationality and high quality and environmental protection. 1.0.2 This specification is applicable to design, construction and quality test of ground treatment by heavy tamping, including natural foundation, artificial filling foundation and special soil foundation. 1.0.3 Ground treatment by heavy tamping shall satisfy such principles as adjusting measures to local conditions, using local materials and saving resources. 1.0.4 Engineering of ground treatment by heavy tamping shall not only meet the requirements of this specification, but also comply with those specified in the current relevant national standards.
Contents of CECS 279-2010
1 General Provisions 2 Terms and Symbols 2.1 Terms 2.2 Symbols 3 Basic Requirement 4 Design 4.1 General Requirement 4.2 Heavy Tamping 4.3 Dynamic Replacement 4.4 Special Soil Foundation Treatment by Heavy Tamping 4.5 Artificial Filling Foundation Treatment by Heavy Tamping 5 Construction 5.1 General Requirement 5.2 Preparation of Construction Site 5.3 Construction Machine 5.4 Construction Procedure 5.5 Construction Quality Control and Monitor 5.6 Environmental Protection 6 Quality Test and Acceptance 6.1 Quality Test and Acceptance of Heavy Tamping 6.2 Quality Test and Acceptance of Dynamic Replacement Explanation of Wording in This Specification List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
CECS 279-2010, CECS/T 279-2010, CECST 279-2010, CECS279-2010, CECS 279, CECS279, CECS/T279-2010, CECS/T 279, CECS/T279, CECST279-2010, CECST 279, CECST279