2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/CJJ 120-2008
CJJ 120-2008   Technical specification of electrical & automation engineering for city drainage system (English Version)
Standard No.: CJJ 120-2008 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 32000 words Translation Price(USD):490.0 remind me the price change

Email:

Implemented on:2008-9-1 Delivery: via email in 1 business day

→ → →

2019-03-01 ,2019-3-1,2008-9-1,141137587610079F3240636AE2FD0
Standard No.: CJJ 120-2008
English Name: Technical specification of electrical & automation engineering for city drainage system
Chinese Name: 城镇排水系统电气与自动化工程技术规程
Chinese Classification: P41    Outdoor water supply and draining engineering
Professional Classification: CJ    Professional Standard - Urban Construction
ICS Classification: 91.140.80 91.140.80    Drainage systems 91.140.80
Source Content Issued by: MOHURD
Issued on: 2008-2-26
Implemented on: 2008-9-1
Status: superseded
Superseded by:CJJ/T 120-2018 Technical standard for electrical & automation engineering of city drainage system
Superseded on:2019-3-1
Abolished on:2019-03-01
Target Language: English
File Format: PDF
Word Count: 32000 words
Translation Price(USD): 490.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This Specification is formulated with a view to improving the technical level of electrical & automation system in city drainage industry of China, normalizing the construction standard of electrical & automation engineering in city drainage and sewage treatment construction and improving construction investment benefits and production and labour environment. 1.0.2 This Specification is applicable to design, construction and acceptance of power supply and distribution system and automatic operation control system of city rainwater and sewage pumping station or sewage treatment plant, data acquisition and control system of drainage pump station group or central monitoring system of regional drainage engineering. 1.0.3 The automaticity of drainage and sewage treatment project operation shall be determined according to management demand, quality and supply situation of equipment and apparatus, in combination with local actual conditions and through comprehensive technical and economical comparison. 1.0.4 As for electrical & automation engineering for city drainage system, it shall not only comply with this Specification but also current relevant standards of the nation during design, construction and acceptance.   2 Terminologies, Symbols and Codes 2.1 Terminologies 2.1.1 Instantaneous flow rate Flow rate at certain moment. 2.1.2 Accumulated flow rate Total flow rate during certain time period. 2.1.3 Operation interface Medium for work interaction between operation personnel and computer. 2.1.4 Data acquisition Digitalization of the site signals (analog quantity, discrete quantity and frequency) which will be input to the computer according to preset rate. 2.1.5 Data processing Calculation or conversion of the acquired data according to certain rule. 2.1.6 Interface Intersection of two different systems. 2.1.7 Site control Manual control on equipment control box nearby the equipment installation position (control independent of automatic control system). 2.1.8 Panel control Manual control carried out on motor power distribution control panel or MCC panel. In case motor power distribution control panel or MCC panel is arranged nearby the site equipment, it may be used to replace site control. 2.1.9 Local control Completion of such works as information acquisition, instruction execution as well as monitoring scheme implementation within this area with PLC as the core component. 2.1.10 Local manual Control of equipment manually by pressing touch screen or buttons on site control station or RTU (remote terminal unit) cabinet panel. 2.1.11 Local automation Control of equipment through automatic controller and software of site control station. 2.1.12 Remote control Data acquisition, command or control functions of equipment and instruments within remote area through wire or wireless telecommunication. 2.1.13 Local control station Equipment with PLC as core component and mainly responsible for works involving in information collection, instruction execution as well as monitoring scheme implementation relevant to equipment monitoring system within certain area of pump station or sewage treatment plant. 2.1.14 Remote terminal unit (RTU) Control station set in a control system and in relation to control center; generally, it takes PLC as core component and is mainly responsible for monitoring as well as relevant information collection, instruction execution and monitoring scheme implementation of equipment far away from the control center. 2.1.15 Equipment layer Site equipment and site instruments, which are connected to control layer through bus or hard wiring. 2.1.16 Control layer It consists of local controllers distributed in various areas and looped network (or star network) connecting control center and the controllers. 2.1.17 Information layer Links and equipment for upper-layer data transmission in the entire system. 2.1.18 Information center Site divided by drainage system or region and administering the acquisition, processing and display of states and process parameters of equipment in pump stations and sewage treatment plant within the drainage system or region. 2.1.19 Area control center Site divided according to geographical location, administering partial pump stations, with functions of information acquisition, processing, display and control command issuance as well as master station control. 2.1.20 Remote sub station Remote terminal certain distance away from the master station and connected through wire or wireless telecommunication.
Contents Foreword i 1 General Provisions 2 Terminologies, Symbols and Codes 2.1 Terminologies 2.2 Symbols 2.3 Code 3 Pump Station Power Supply and Distribution 3.1 Load Investigation and Calculation 3.2 Power Supply 3.3 System Structure 3.4 Reactive Power Compensation 3.5 Operational Power Supply 3.6 Short-circuit Current Calculation and Relay Protection 3.7 Equipment Selection 3.8 Equipment Arrangement 3.9 Lighting 3.10 Earthing and Lightning Protection 3.11 Electric Construction and Acceptance of Pump Station 4 Pump Station Automation System 4.1 General Requirments 4.2 Pump Station Grade Classification 4.3 System Structure 4.4 System Functions 4.5 Technical Requirements for Inspection and Measurement 4.6 Technical Requirements for Equipment Control 4.7 Power Monitoring Technical Requirements 4.8 Lightning Protection and Earthing 4.9 Configuration Requirements for Control Equipment 4.10 Safety and Technology Defence 4.11 Control Software 4.12 Interfaces of Control System 4.13 Technical Indexes of System 4.14 Technical Requirements for Equipment Installation 4.15 System Debugging, Acceptance and Commissioning 5 Sewage Treatment Plant Power Supply and Distribution 5.1 Load Calculation 5.2 System Structure 5.3 Operating Power Supply 5.4 Short-circuit Current Calculation and Protection 5.5 Requirements for System Equipment 5.6 Lighting 5.7 Earthing and Lightning Protection 5.8 Application of Explosion-proof Electric Appliance 5.9 Construction and Acceptance of Electric System 6 Automation System of the Sewage Treatment Plant 6.1 General Requirements 6.2 Requirements for Scale Division and System Settings 6.3 System Structure 6.4 System Functions 6.5 Arrangement of Inspection and Monitoring Points 6.6 Technical Requirements for Inspection and Measurement 6.7 Technical Requirements for Equipment Control 6.8 Technical Requirements on Power Monitoring 6.9 Lightning Protection and Earthing 6.10 Configuration Requirements for Control Equipment 6.11 Safety and Technic Protection 6.12 Control Softwares 6.13 Interfaces of Control System 6.14 Technical Indexes of the System 6.15 Measurement 6.16 Technical Requirements for Equipment Installation 6.17 System Debugging, Inspection and Commissioning 7 Data Acquisition and Monitoring System of Drainage Engineering 7.1 System Establishment 7.2 System Structure 7.3 System Functions 7.4 System Indexes 7.5 Configuration of System Equipment Explanation of Wording in This Specification
Code of China
Standard
CJJ 120-2008  Technical specification of electrical & automation engineering for city drainage system (English Version)
Standard No.CJJ 120-2008
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count32000 words
Price(USD)490.0
Implemented on2008-9-1
Deliveryvia email in 1 business day
Detail of CJJ 120-2008
Standard No.
CJJ 120-2008
English Name
Technical specification of electrical & automation engineering for city drainage system
Chinese Name
城镇排水系统电气与自动化工程技术规程
Chinese Classification
P41
Professional Classification
CJ
ICS Classification
Issued by
MOHURD
Issued on
2008-2-26
Implemented on
2008-9-1
Status
superseded
Superseded by
CJJ/T 120-2018 Technical standard for electrical & automation engineering of city drainage system
Superseded on
2019-3-1
Abolished on
2019-03-01
Superseding
Language
English
File Format
PDF
Word Count
32000 words
Price(USD)
490.0
Keywords
CJJ 120-2008, CJJ/T 120-2008, CJJT 120-2008, CJJ120-2008, CJJ 120, CJJ120, CJJ/T120-2008, CJJ/T 120, CJJ/T120, CJJT120-2008, CJJT 120, CJJT120
Introduction of CJJ 120-2008
1 General Provisions 1.0.1 This Specification is formulated with a view to improving the technical level of electrical & automation system in city drainage industry of China, normalizing the construction standard of electrical & automation engineering in city drainage and sewage treatment construction and improving construction investment benefits and production and labour environment. 1.0.2 This Specification is applicable to design, construction and acceptance of power supply and distribution system and automatic operation control system of city rainwater and sewage pumping station or sewage treatment plant, data acquisition and control system of drainage pump station group or central monitoring system of regional drainage engineering. 1.0.3 The automaticity of drainage and sewage treatment project operation shall be determined according to management demand, quality and supply situation of equipment and apparatus, in combination with local actual conditions and through comprehensive technical and economical comparison. 1.0.4 As for electrical & automation engineering for city drainage system, it shall not only comply with this Specification but also current relevant standards of the nation during design, construction and acceptance.   2 Terminologies, Symbols and Codes 2.1 Terminologies 2.1.1 Instantaneous flow rate Flow rate at certain moment. 2.1.2 Accumulated flow rate Total flow rate during certain time period. 2.1.3 Operation interface Medium for work interaction between operation personnel and computer. 2.1.4 Data acquisition Digitalization of the site signals (analog quantity, discrete quantity and frequency) which will be input to the computer according to preset rate. 2.1.5 Data processing Calculation or conversion of the acquired data according to certain rule. 2.1.6 Interface Intersection of two different systems. 2.1.7 Site control Manual control on equipment control box nearby the equipment installation position (control independent of automatic control system). 2.1.8 Panel control Manual control carried out on motor power distribution control panel or MCC panel. In case motor power distribution control panel or MCC panel is arranged nearby the site equipment, it may be used to replace site control. 2.1.9 Local control Completion of such works as information acquisition, instruction execution as well as monitoring scheme implementation within this area with PLC as the core component. 2.1.10 Local manual Control of equipment manually by pressing touch screen or buttons on site control station or RTU (remote terminal unit) cabinet panel. 2.1.11 Local automation Control of equipment through automatic controller and software of site control station. 2.1.12 Remote control Data acquisition, command or control functions of equipment and instruments within remote area through wire or wireless telecommunication. 2.1.13 Local control station Equipment with PLC as core component and mainly responsible for works involving in information collection, instruction execution as well as monitoring scheme implementation relevant to equipment monitoring system within certain area of pump station or sewage treatment plant. 2.1.14 Remote terminal unit (RTU) Control station set in a control system and in relation to control center; generally, it takes PLC as core component and is mainly responsible for monitoring as well as relevant information collection, instruction execution and monitoring scheme implementation of equipment far away from the control center. 2.1.15 Equipment layer Site equipment and site instruments, which are connected to control layer through bus or hard wiring. 2.1.16 Control layer It consists of local controllers distributed in various areas and looped network (or star network) connecting control center and the controllers. 2.1.17 Information layer Links and equipment for upper-layer data transmission in the entire system. 2.1.18 Information center Site divided by drainage system or region and administering the acquisition, processing and display of states and process parameters of equipment in pump stations and sewage treatment plant within the drainage system or region. 2.1.19 Area control center Site divided according to geographical location, administering partial pump stations, with functions of information acquisition, processing, display and control command issuance as well as master station control. 2.1.20 Remote sub station Remote terminal certain distance away from the master station and connected through wire or wireless telecommunication.
Contents of CJJ 120-2008
Contents Foreword i 1 General Provisions 2 Terminologies, Symbols and Codes 2.1 Terminologies 2.2 Symbols 2.3 Code 3 Pump Station Power Supply and Distribution 3.1 Load Investigation and Calculation 3.2 Power Supply 3.3 System Structure 3.4 Reactive Power Compensation 3.5 Operational Power Supply 3.6 Short-circuit Current Calculation and Relay Protection 3.7 Equipment Selection 3.8 Equipment Arrangement 3.9 Lighting 3.10 Earthing and Lightning Protection 3.11 Electric Construction and Acceptance of Pump Station 4 Pump Station Automation System 4.1 General Requirments 4.2 Pump Station Grade Classification 4.3 System Structure 4.4 System Functions 4.5 Technical Requirements for Inspection and Measurement 4.6 Technical Requirements for Equipment Control 4.7 Power Monitoring Technical Requirements 4.8 Lightning Protection and Earthing 4.9 Configuration Requirements for Control Equipment 4.10 Safety and Technology Defence 4.11 Control Software 4.12 Interfaces of Control System 4.13 Technical Indexes of System 4.14 Technical Requirements for Equipment Installation 4.15 System Debugging, Acceptance and Commissioning 5 Sewage Treatment Plant Power Supply and Distribution 5.1 Load Calculation 5.2 System Structure 5.3 Operating Power Supply 5.4 Short-circuit Current Calculation and Protection 5.5 Requirements for System Equipment 5.6 Lighting 5.7 Earthing and Lightning Protection 5.8 Application of Explosion-proof Electric Appliance 5.9 Construction and Acceptance of Electric System 6 Automation System of the Sewage Treatment Plant 6.1 General Requirements 6.2 Requirements for Scale Division and System Settings 6.3 System Structure 6.4 System Functions 6.5 Arrangement of Inspection and Monitoring Points 6.6 Technical Requirements for Inspection and Measurement 6.7 Technical Requirements for Equipment Control 6.8 Technical Requirements on Power Monitoring 6.9 Lightning Protection and Earthing 6.10 Configuration Requirements for Control Equipment 6.11 Safety and Technic Protection 6.12 Control Softwares 6.13 Interfaces of Control System 6.14 Technical Indexes of the System 6.15 Measurement 6.16 Technical Requirements for Equipment Installation 6.17 System Debugging, Inspection and Commissioning 7 Data Acquisition and Monitoring System of Drainage Engineering 7.1 System Establishment 7.2 System Structure 7.3 System Functions 7.4 System Indexes 7.5 Configuration of System Equipment Explanation of Wording in This Specification
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
CJJ 120-2008, CJJ/T 120-2008, CJJT 120-2008, CJJ120-2008, CJJ 120, CJJ120, CJJ/T120-2008, CJJ/T 120, CJJ/T120, CJJT120-2008, CJJT 120, CJJT120