2025-12-6 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/CJJ 183-2012
CJJ 183-2012   Technical code for platform screen door system of urban railway transit (English Version)
Standard No.: CJJ 183-2012 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 10000 words Translation Price(USD):200.0 remind me the price change

Email:

Implemented on:2012-12-1 Delivery: via email in 1 business day

→ → →

,,2012-12-1,141137783473813B10EF833229D7B
Standard No.: CJJ 183-2012
English Name: Technical code for platform screen door system of urban railway transit
Chinese Name: 城市轨道交通站台屏蔽门系统技术规范
Professional Classification: CJ    Professional Standard - Urban Construction
Source Content Issued by: MOHURD
Issued on: 2012-8-23
Implemented on: 2012-12-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 10000 words
Translation Price(USD): 200.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is prepared with view to improving the environment of urban railway transit station platform, enhancing the train operation safety and standardizing the technical requirements of platform screen door system of urban railway transit, so as to make the system economical, suitable and advanced in technology. 1.0.2 This code is applicable to the design, installation, acceptance and maintenance of newly-built and retrofitted and renovated platform screen door system to the existing railways of urban railway transit work. 1.0.3 Prior to retrofitting and renovation of platform screen door system to the existing railways, the civil structures and relevant electromechanical system interface conditions of the retrofitted and renovated station shall be confirmed. 1.0.4 Prior to installation of platform screen door system, prototype should be produced and shall pass the testing. 1.0.5 The platform screen door system of urban railway transit shall not only meet the requirements of this code, but also those in the current relevant standards of the nation. 2 Terms 2.0.1 Platform screen door Continuous barrier which is set at the platform edge to separate the passenger’s waiting area from the train operation area and corresponding to train door, and can control the opening and closing of sliding door in a multi-level way. It is classified into full-height, half-height, closed and unclosed ones, hereinafter referred to as platform screen door. 2.0.2 Emergency escape door The door for evacuation in case that the train door cannot align with the sliding door. 2.0.3 Platform end door The door which is set at both ends of the platform screen door for getting in and out of the rail zone. 2.0.4 Door mechanism The mechanism to open and close the sliding door. 2.0.5 Door control unit The device to control the door mechanism locally. 2.0.6 Platform screen doors local control panel The device to control the platform screen door at one side. 2.0.7 Platform screen doors central control panel The control center of platform screen door in a station, including monitoring equipment and unit controller. 2.0.8 Local control box The device to control a set of sliding door locally. 2.0.9 Platform screen doors emergency control panel The device to control the platform screen door at one side in emergency case. 2.0.10 Push bar lock The device to manually open the emergency escape door at the track side and the platform end door in the equipment area.
Foreword i 1 General Provisions 2 Terms 3 Platform Screen Door System Design 3.1 General Requirements 3.2 Design Principles 4 Platform Screen Door System Basic Structure 4.1 Door Structure 4.2 Door Mechanism 4.3 Monitoring System 4.4 Power System and Grounding 5 Inspection of Prototype 5.1 Structure of Prototype 5.2 Prototype Testing Trial 5.3 Testing Witness and Sign for Prototype Testing and Trial 6 Installation and Acceptance 6.1 Equipment Receiving Inspection 6.2 Inspection of Control Base Standard Handover 6.3 Inspection of Measurement and Handover 6.4 Acceptance of Construction Quality 7 Operation and Maintenance 7.1 Daily Operation of Platform Screen Door System 7.2 Checking Plan for Platform Screen Door Equipment Appendix A Acceptance Record Sheet of Equipment Receiving Appendix B Handover Record Sheet of Control Base Standard Appendix C Inspection Record Sheet of Civil Works Handover Appendix D Quality Acceptance Record Sheet of Subdivisional Works Appendix E Quality Acceptance Record Sheet of Subprojects Appendix F Quality Acceptance Record Sheet of Subunits Explanation of Wording in This Code List of Quoted Standards
Referred in CJJ 183-2012:
* GB 50054-2011 Code for design of low voltage eletrical installations
* GB 14050-2008 Types and safety technical requirements of system earthing
* GB 15763.2-2005 Safety glazing materials in building?Part 2:Tempered glass
* CJ/T 236-2006 Urban railway transportation platform screen door systen
Code of China
Standard
CJJ 183-2012  Technical code for platform screen door system of urban railway transit (English Version)
Standard No.CJJ 183-2012
Statusvalid
LanguageEnglish
File FormatPDF
Word Count10000 words
Price(USD)200.0
Implemented on2012-12-1
Deliveryvia email in 1 business day
Detail of CJJ 183-2012
Standard No.
CJJ 183-2012
English Name
Technical code for platform screen door system of urban railway transit
Chinese Name
城市轨道交通站台屏蔽门系统技术规范
Chinese Classification
Professional Classification
CJ
ICS Classification
Issued by
MOHURD
Issued on
2012-8-23
Implemented on
2012-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
10000 words
Price(USD)
200.0
Keywords
CJJ 183-2012, CJJ/T 183-2012, CJJT 183-2012, CJJ183-2012, CJJ 183, CJJ183, CJJ/T183-2012, CJJ/T 183, CJJ/T183, CJJT183-2012, CJJT 183, CJJT183
Introduction of CJJ 183-2012
1 General Provisions 1.0.1 This code is prepared with view to improving the environment of urban railway transit station platform, enhancing the train operation safety and standardizing the technical requirements of platform screen door system of urban railway transit, so as to make the system economical, suitable and advanced in technology. 1.0.2 This code is applicable to the design, installation, acceptance and maintenance of newly-built and retrofitted and renovated platform screen door system to the existing railways of urban railway transit work. 1.0.3 Prior to retrofitting and renovation of platform screen door system to the existing railways, the civil structures and relevant electromechanical system interface conditions of the retrofitted and renovated station shall be confirmed. 1.0.4 Prior to installation of platform screen door system, prototype should be produced and shall pass the testing. 1.0.5 The platform screen door system of urban railway transit shall not only meet the requirements of this code, but also those in the current relevant standards of the nation. 2 Terms 2.0.1 Platform screen door Continuous barrier which is set at the platform edge to separate the passenger’s waiting area from the train operation area and corresponding to train door, and can control the opening and closing of sliding door in a multi-level way. It is classified into full-height, half-height, closed and unclosed ones, hereinafter referred to as platform screen door. 2.0.2 Emergency escape door The door for evacuation in case that the train door cannot align with the sliding door. 2.0.3 Platform end door The door which is set at both ends of the platform screen door for getting in and out of the rail zone. 2.0.4 Door mechanism The mechanism to open and close the sliding door. 2.0.5 Door control unit The device to control the door mechanism locally. 2.0.6 Platform screen doors local control panel The device to control the platform screen door at one side. 2.0.7 Platform screen doors central control panel The control center of platform screen door in a station, including monitoring equipment and unit controller. 2.0.8 Local control box The device to control a set of sliding door locally. 2.0.9 Platform screen doors emergency control panel The device to control the platform screen door at one side in emergency case. 2.0.10 Push bar lock The device to manually open the emergency escape door at the track side and the platform end door in the equipment area.
Contents of CJJ 183-2012
Foreword i 1 General Provisions 2 Terms 3 Platform Screen Door System Design 3.1 General Requirements 3.2 Design Principles 4 Platform Screen Door System Basic Structure 4.1 Door Structure 4.2 Door Mechanism 4.3 Monitoring System 4.4 Power System and Grounding 5 Inspection of Prototype 5.1 Structure of Prototype 5.2 Prototype Testing Trial 5.3 Testing Witness and Sign for Prototype Testing and Trial 6 Installation and Acceptance 6.1 Equipment Receiving Inspection 6.2 Inspection of Control Base Standard Handover 6.3 Inspection of Measurement and Handover 6.4 Acceptance of Construction Quality 7 Operation and Maintenance 7.1 Daily Operation of Platform Screen Door System 7.2 Checking Plan for Platform Screen Door Equipment Appendix A Acceptance Record Sheet of Equipment Receiving Appendix B Handover Record Sheet of Control Base Standard Appendix C Inspection Record Sheet of Civil Works Handover Appendix D Quality Acceptance Record Sheet of Subdivisional Works Appendix E Quality Acceptance Record Sheet of Subprojects Appendix F Quality Acceptance Record Sheet of Subunits Explanation of Wording in This Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
CJJ 183-2012, CJJ/T 183-2012, CJJT 183-2012, CJJ183-2012, CJJ 183, CJJ183, CJJ/T183-2012, CJJ/T 183, CJJ/T183, CJJT183-2012, CJJT 183, CJJT183