2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL 5007-1992
DL 5007-1992   The Code of Erection and Acceptance of Electric Power Construction (Welding for Fossil Fuel Power Plant) (English Version)
Standard No.: DL 5007-1992 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on: Delivery: via email in 1 business day

→ → →

,2004-6-1,,07F374150BE5B3A01429089934498
Standard No.: DL 5007-1992
English Name: The Code of Erection and Acceptance of Electric Power Construction (Welding for Fossil Fuel Power Plant)
Chinese Name: 电力建设施工及验收技术规范(火力发电厂焊接篇
Professional Classification: DL    Professional Standard - Electricity
Status: superseded
Superseded by:DL/T 869-2004 The code of welding for power plant
Superseded on:2004-6-1
Superseding:SDJ 51-1982 电力建设施工及验收技术规范(火力发电厂焊接篇)
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
1 General 1.0.1 This code is applicable to design, manufacture, installation and overhaul of electric power system of energy industry, as well as inspection of welding of boilers, pressure pipelines, pressure vessels and steel structure of thermal power generation equipment of 600MW or below. 1.0.2 This code is applicable to manual arc welding, manual argon tungsten-arc welding, oxy-acetylene welding, automatic submerged arc welding, etc. of carbon steel (carbon content≤0.35%), common low alloy steel and heat-resistant steel. For other materials and welding methods, establish technical requirements by reference to this code and relevant standards. 1.0.3 Unless otherwise specified in construction contract, the construction and acceptance of the thermoelectric generating sets imported from abroad shall be carried out according to this code. 1.0.4 Testing of weld quality shall be appraised respectively according to operating conditions of work pieces and quality requirements. 1.0.5 Testing of metal materials, check of weld junction of equipment, ball-passing test, welding process qualification, quality examination of weld joints as well as evaluation of welders shall be performed respectively according to the related regulations. 1.0.6 Regulations about safety, environment protection, fire protection, etc., must be observed during the course of welding (welding, heat treatment and metal testing). 2 Welding Personnel 2.0.1 Welding personnel include welding technical personnel, welding quality inspectors, welding testers, welders and welding heat treatment personnel. 2.0.2 Each enterprise shall have special technical chief, responsible for welding, and full-time welding quality inspector. 2.0.2.1 Special technical chief, responsible for welding, shall be engineer (technician) or higher level technicians with relative high special engineering level and rich experience in welding who are responsible for welding process and quality management as well as qualification evaluation of welding personnel, etc. 2.0.2.2 Each enterprise and its competent department shall organize professional technical training for welding personnel to improve their technical level, theoretical level of specialty and management level. 2.0.3 Basic requirements on welding personnel and working contents 2.0.3.1 Welding technical personnel (1) Those technical personnel, who first undertake welding technology management, must accept production practice and system training and achieve corresponding qualification through examination before they undertake the task. (2) Master general conditions of projects, strictly execute this code, edit welding plans and draft technical measures according to the actual situation, work out schemes for training welders, attend the welders technical examination committee and participate in technical evaluation of welders and inspection of management of welding materials. (3) According to the technical measures, communicate with related personnel deeply about technology, provide technical guidance in practice and supervise. (4) Organize welding process qualification and compile operation instructions of welding. (5) Participate in quality acceptance of main pipes and components. (6) Record, inspect and sort out welding materials, transfer technical documents of project completion and perform technical summarization as well.
1 General 2 Welding Personnel 3 Steel Products and Weld Materials 4 Preparation for Welding 5 Welding Process 6 Post-weld Heat Treatment 7 Quality Inspection 8 Quality Standard 9 Technical Documents Annex A Chemical Compositions, Mechanical Performance and Reference Data for Common Steels in Power Plants Annex B Chemical Compositions and Mechanical Performance at Normal Temperature of Deposited Metal for Common Welding Rods Annex C Chemical Compositions of Common Welding Wire Annex D Table for Common Weld Flux of Automatic Submerged Arc Welding Annex F Cutting Positions and Specifications of Weld Joints for Quality Inspection Samples Annex G Catalogue of Relevant Standards and Specifications Annex E Recommendation Form of Welding Rod (Welding Wire) for Welding Dissimilar Steels and Post-Weld Heat Treatment Temperature
DL 5007-1992 is referred in:
* DLGJ 158-2001 Technical Code for Fixed Steel Platform and Ladders Design of Fossil-Fuel Power Plant
* DL/T 5174-2003 Code for Design of Gas-Steam Combined-cycle Power Plant
* DL/T 5054-1996 Technical Specification for the Steam/Water Piping Design of Foss
* DL 612-1996 Supervision Code for Boiler and Pressure Vessel of the Power Industry
*DL 473-1992 Specification of large-diameter tee forgings
*DL/T 820-2002 The code of ultrasonic inspection section for butt welds of pipes
Code of China
Standard
DL 5007-1992  The Code of Erection and Acceptance of Electric Power Construction (Welding for Fossil Fuel Power Plant) (English Version)
Standard No.DL 5007-1992
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on
Deliveryvia email in 1 business day
Detail of DL 5007-1992
Standard No.
DL 5007-1992
English Name
The Code of Erection and Acceptance of Electric Power Construction (Welding for Fossil Fuel Power Plant)
Chinese Name
电力建设施工及验收技术规范(火力发电厂焊接篇
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
Issued on
Implemented on
Status
superseded
Superseded by
DL/T 869-2004 The code of welding for power plant
Superseded on
2004-6-1
Abolished on
Superseding
SDJ 51-1982 电力建设施工及验收技术规范(火力发电厂焊接篇)
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
DL 5007-1992, DL/T 5007-1992, DLT 5007-1992, DL5007-1992, DL 5007, DL5007, DL/T5007-1992, DL/T 5007, DL/T5007, DLT5007-1992, DLT 5007, DLT5007
Introduction of DL 5007-1992
1 General 1.0.1 This code is applicable to design, manufacture, installation and overhaul of electric power system of energy industry, as well as inspection of welding of boilers, pressure pipelines, pressure vessels and steel structure of thermal power generation equipment of 600MW or below. 1.0.2 This code is applicable to manual arc welding, manual argon tungsten-arc welding, oxy-acetylene welding, automatic submerged arc welding, etc. of carbon steel (carbon content≤0.35%), common low alloy steel and heat-resistant steel. For other materials and welding methods, establish technical requirements by reference to this code and relevant standards. 1.0.3 Unless otherwise specified in construction contract, the construction and acceptance of the thermoelectric generating sets imported from abroad shall be carried out according to this code. 1.0.4 Testing of weld quality shall be appraised respectively according to operating conditions of work pieces and quality requirements. 1.0.5 Testing of metal materials, check of weld junction of equipment, ball-passing test, welding process qualification, quality examination of weld joints as well as evaluation of welders shall be performed respectively according to the related regulations. 1.0.6 Regulations about safety, environment protection, fire protection, etc., must be observed during the course of welding (welding, heat treatment and metal testing). 2 Welding Personnel 2.0.1 Welding personnel include welding technical personnel, welding quality inspectors, welding testers, welders and welding heat treatment personnel. 2.0.2 Each enterprise shall have special technical chief, responsible for welding, and full-time welding quality inspector. 2.0.2.1 Special technical chief, responsible for welding, shall be engineer (technician) or higher level technicians with relative high special engineering level and rich experience in welding who are responsible for welding process and quality management as well as qualification evaluation of welding personnel, etc. 2.0.2.2 Each enterprise and its competent department shall organize professional technical training for welding personnel to improve their technical level, theoretical level of specialty and management level. 2.0.3 Basic requirements on welding personnel and working contents 2.0.3.1 Welding technical personnel (1) Those technical personnel, who first undertake welding technology management, must accept production practice and system training and achieve corresponding qualification through examination before they undertake the task. (2) Master general conditions of projects, strictly execute this code, edit welding plans and draft technical measures according to the actual situation, work out schemes for training welders, attend the welders technical examination committee and participate in technical evaluation of welders and inspection of management of welding materials. (3) According to the technical measures, communicate with related personnel deeply about technology, provide technical guidance in practice and supervise. (4) Organize welding process qualification and compile operation instructions of welding. (5) Participate in quality acceptance of main pipes and components. (6) Record, inspect and sort out welding materials, transfer technical documents of project completion and perform technical summarization as well.
Contents of DL 5007-1992
1 General 2 Welding Personnel 3 Steel Products and Weld Materials 4 Preparation for Welding 5 Welding Process 6 Post-weld Heat Treatment 7 Quality Inspection 8 Quality Standard 9 Technical Documents Annex A Chemical Compositions, Mechanical Performance and Reference Data for Common Steels in Power Plants Annex B Chemical Compositions and Mechanical Performance at Normal Temperature of Deposited Metal for Common Welding Rods Annex C Chemical Compositions of Common Welding Wire Annex D Table for Common Weld Flux of Automatic Submerged Arc Welding Annex F Cutting Positions and Specifications of Weld Joints for Quality Inspection Samples Annex G Catalogue of Relevant Standards and Specifications Annex E Recommendation Form of Welding Rod (Welding Wire) for Welding Dissimilar Steels and Post-Weld Heat Treatment Temperature
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL 5007-1992, DL/T 5007-1992, DLT 5007-1992, DL5007-1992, DL 5007, DL5007, DL/T5007-1992, DL/T 5007, DL/T5007, DLT5007-1992, DLT 5007, DLT5007