2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL 5106-1999
DL 5106-1999   Operation code of cross power transmission line in installing the conductor (English Version)
Standard No.: DL 5106-1999 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 19000 words Translation Price(USD):570.0 remind me the price change

Email:

Implemented on:2000-7-1 Delivery: via email in 1~3 business day

→ → →

2018-03-01,2018-3-1,2000-7-1,141137333946218A2B0B8555042B9
Standard No.: DL 5106-1999
English Name: Operation code of cross power transmission line in installing the conductor
Chinese Name: 跨越电力线路架线施工规程
Chinese Classification: P62    Power transmission and transformation engineering
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2000-2-24
Implemented on: 2000-7-1
Status: superseded
Superseded by:DL/T 5106-2017 Operation code of cross power transmission line in installing the conductor
Superseded on:2018-3-1
Abolished on:2018-03-01
Target Language: English
File Format: PDF
Word Count: 19000 words
Translation Price(USD): 570.0
Delivery: via email in 1~3 business day
本规程规定了跨越电力线路的施工方法。
本规程适用于新建或改建的输电线路跨越电力线路的施工。
本规程适用于人力、机械牵引及张力架线的跨越施工。
跨越铁路、公路、河流、通信线路以及其他障碍物的施工可参照本规程进行。
Code of China
Standard
DL 5106-1999   Operation code of cross power transmission line in installing the conductor (English Version)
Standard No.DL 5106-1999
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count19000 words
Price(USD)570.0
Implemented on2000-7-1
Deliveryvia email in 1~3 business day
Detail of DL 5106-1999
Standard No.
DL 5106-1999
English Name
Operation code of cross power transmission line in installing the conductor
Chinese Name
跨越电力线路架线施工规程
Chinese Classification
P62
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2000-2-24
Implemented on
2000-7-1
Status
superseded
Superseded by
DL/T 5106-2017 Operation code of cross power transmission line in installing the conductor
Superseded on
2018-3-1
Abolished on
2018-03-01
Superseding
Language
English
File Format
PDF
Word Count
19000 words
Price(USD)
570.0
Keywords
DL 5106-1999, DL/T 5106-1999, DLT 5106-1999, DL5106-1999, DL 5106, DL5106, DL/T5106-1999, DL/T 5106, DL/T5106, DLT5106-1999, DLT 5106, DLT5106
Introduction of DL 5106-1999
本规程规定了跨越电力线路的施工方法。
本规程适用于新建或改建的输电线路跨越电力线路的施工。
本规程适用于人力、机械牵引及张力架线的跨越施工。
跨越铁路、公路、河流、通信线路以及其他障碍物的施工可参照本规程进行。
Contents of DL 5106-1999
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL 5106-1999, DL/T 5106-1999, DLT 5106-1999, DL5106-1999, DL 5106, DL5106, DL/T5106-1999, DL/T 5106, DL/T5106, DLT5106-1999, DLT 5106, DLT5106