2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL 5277-2012
DL 5277-2012   Code for completed fossil power construction project achieved acceptance criterion (English Version)
Standard No.: DL 5277-2012 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 60000 words Translation Price(USD):1800.0 remind me the price change

Email:

Implemented on:2012-7-1 Delivery: via email in 1 business day

→ → →

,,2012-7-1,141137787345879489F58EC0D3038
Standard No.: DL 5277-2012
English Name: Code for completed fossil power construction project achieved acceptance criterion
Chinese Name: 火电工程达标投产验收规程
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: National Energy Administration
Issued on: 2012-04-06
Implemented on: 2012-7-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 60000 words
Translation Price(USD): 1800.0
Delivery: via email in 1 business day
1 General 1.0.1 This specification is formulated to standardize the acceptance of thermal power engineering reaching the standards and put into production, and improve the engineering construction quality and the overall engineering handover level. 1.0.2 This specification is applicable to newly-built and expanded thermal power engineering and nuclear power conventional island works. 1.0.3 For thermal power engineering construction, quality conformity acceptance shall be carried out by combining quantitative index comparison and comprehensive inspection according to this specification in terms of the compliance of engineering construction procedures, the effectiveness of whole-process quality control and the overall engineering quality after the unit is put into production. 1.0.4 The construction of thermal power engineering shall be planned in advance to realized supervision by government departments, regulation by development organization, audit by the supervision organization, and monitoring by the survey, design and construction organizations according to the principle of whole-process quality control. 1.0.5 In addition to this specification, the acceptance of thermal power engineering reaching the standard and put into production shall also meet the requirements stipulated in the current relevant standards of China. 2 Terms 2.0.1 acceptance when reaching the standard and put into production quality conformity acceptance by combining quantitative index comparison and comprehensive inspection in terms of the compliance of engineering construction procedures, the effectiveness of whole-process quality control and the overall engineering quality after the unit is put into production 2.0.2 assessment period 6 months from the end of 168h full-load test run of the unit 2.0.3 basically conformed able to meet the security and use functions, with a few defects in the quality of physical objects and project documents, dimensional deviation not exceeding 1.5% and the limit value not exceeded by 1% 3 Basic requirements 3.0.1 Before the commencement of the engineering, the development organization shall formulate a plan for the project to reach the standard and put into production, and shall specify the requirements for reaching the standard and putting into production in the engineering contract. 3.0.2 The development organization shall organize the participating construction organizations to prepare detailed implementation rules to reach the standard and put into production, and shall organize the implementation in the construction process. 3.0.3 The acceptance when reaching the standard and put into production is divided into two stages: preliminary inspection and re-inspection. The preliminary inspection shall be carried out on a single unit basis. If multiple units are built synchronously, the common part shall be included in the first unit for preliminary inspection. The re-inspection may be applied based on one or more units at the same time. In case of application for multiple units, they shall be re-inspected one by one, and their common part shall be included in the re-inspection of the first unit put into production. The auxiliary utility system for the units subsequently put into production shall be re-inspected synchronously with the units subsequently put into production. 3.0.4 The preliminary inspection when reaching the standard and put into production shall be conducted before the whole unit set is started. The re-inspection when reaching the standard and put into production shall be carried out within 12 months after the unit is handed over and put into production and after all the unit performance test items are completed. 3.0.5 The preliminary inspection and re-inspection when reaching the standard and put into production shall be carried out for acceptance according to the provisions of clause 4, including “4.1 Occupational health and safety and environmental management", "4.2 Civil engineering quality", "4.3 Engineering quality of boiler unit", "4.4 Engineering quality of turbine generator unit", "4.5 Quality of electric and thermal instruments and control devices", "4.6 Commissioning test, performance test and main technical criteria" and "4.7 Comprehensive engineering management and archives". The "inspection contents" of preliminary inspection for which the inspection and acceptance conditions are not adequate shall be carried out during re-inspection. 3.0.6 The inspection and acceptance contents listed in the 7 parts in clause 4 of this specification are not mandatory if there is no such item in the project concerned. 3.0.7 The nature of "inspection contents" in the inspection and acceptance form of the 7 parts in clause 4 of this specification is "general" except for those labeled "dominant". 3.0.8 For the same “inspection contents” of the "main project documents" in Table 4.7 as those in the inspection and acceptance forms of the other 6 parts in clause 4 of this specification, the inspection and acceptance for comprehensive engineering management and archives shall focus on checking the integrity and systematicness of the documents, while the other 6 parts shall focus on checking the authenticity and correctness of the technical contents. 3.0.9 During the engineering construction, the development organization shall organize all participating construction organizations to carry out whole-process quality control according to this specification.
Foreword i 1 General 2 Terms 3 Basic requirements 4 Inspection and acceptance contents for reaching the standard and putting into production 4.1 Occupational health, safety and environmental management 4.2 Civil engineering quality 4.3 Engineering quality of boiler unit 4.4 Engineering quality of turbine generator unit 4.5 Quality of electric and thermal instruments and control devices 4.6 Commissioning test, performance test and main technical criteria 4.7 Comprehensive engineering management and archives 5 Preliminary inspection for reaching the standard and putting into production 6 Re-inspection for reaching the standard and putting into production 7 Conclusion for acceptance when reaching the standard and put into production Annex A Re-inspection (preliminary inspection) report of thermal power engineering reaching the standard and put into production Annex B Re-inspection (preliminary inspection) and acceptance results form of compulsory provisions Annex C Re-inspection application form for thermal power engineering reaching the standard and put into production Annex D Major economic and technical indicators Explanation of wording in this specification List of quoted standards
Code of China
Standard
DL 5277-2012  Code for completed fossil power construction project achieved acceptance criterion (English Version)
Standard No.DL 5277-2012
Statusvalid
LanguageEnglish
File FormatPDF
Word Count60000 words
Price(USD)1800.0
Implemented on2012-7-1
Deliveryvia email in 1 business day
Detail of DL 5277-2012
Standard No.
DL 5277-2012
English Name
Code for completed fossil power construction project achieved acceptance criterion
Chinese Name
火电工程达标投产验收规程
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
National Energy Administration
Issued on
2012-04-06
Implemented on
2012-7-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
60000 words
Price(USD)
1800.0
Keywords
DL 5277-2012, DL/T 5277-2012, DLT 5277-2012, DL5277-2012, DL 5277, DL5277, DL/T5277-2012, DL/T 5277, DL/T5277, DLT5277-2012, DLT 5277, DLT5277
Introduction of DL 5277-2012
1 General 1.0.1 This specification is formulated to standardize the acceptance of thermal power engineering reaching the standards and put into production, and improve the engineering construction quality and the overall engineering handover level. 1.0.2 This specification is applicable to newly-built and expanded thermal power engineering and nuclear power conventional island works. 1.0.3 For thermal power engineering construction, quality conformity acceptance shall be carried out by combining quantitative index comparison and comprehensive inspection according to this specification in terms of the compliance of engineering construction procedures, the effectiveness of whole-process quality control and the overall engineering quality after the unit is put into production. 1.0.4 The construction of thermal power engineering shall be planned in advance to realized supervision by government departments, regulation by development organization, audit by the supervision organization, and monitoring by the survey, design and construction organizations according to the principle of whole-process quality control. 1.0.5 In addition to this specification, the acceptance of thermal power engineering reaching the standard and put into production shall also meet the requirements stipulated in the current relevant standards of China. 2 Terms 2.0.1 acceptance when reaching the standard and put into production quality conformity acceptance by combining quantitative index comparison and comprehensive inspection in terms of the compliance of engineering construction procedures, the effectiveness of whole-process quality control and the overall engineering quality after the unit is put into production 2.0.2 assessment period 6 months from the end of 168h full-load test run of the unit 2.0.3 basically conformed able to meet the security and use functions, with a few defects in the quality of physical objects and project documents, dimensional deviation not exceeding 1.5% and the limit value not exceeded by 1% 3 Basic requirements 3.0.1 Before the commencement of the engineering, the development organization shall formulate a plan for the project to reach the standard and put into production, and shall specify the requirements for reaching the standard and putting into production in the engineering contract. 3.0.2 The development organization shall organize the participating construction organizations to prepare detailed implementation rules to reach the standard and put into production, and shall organize the implementation in the construction process. 3.0.3 The acceptance when reaching the standard and put into production is divided into two stages: preliminary inspection and re-inspection. The preliminary inspection shall be carried out on a single unit basis. If multiple units are built synchronously, the common part shall be included in the first unit for preliminary inspection. The re-inspection may be applied based on one or more units at the same time. In case of application for multiple units, they shall be re-inspected one by one, and their common part shall be included in the re-inspection of the first unit put into production. The auxiliary utility system for the units subsequently put into production shall be re-inspected synchronously with the units subsequently put into production. 3.0.4 The preliminary inspection when reaching the standard and put into production shall be conducted before the whole unit set is started. The re-inspection when reaching the standard and put into production shall be carried out within 12 months after the unit is handed over and put into production and after all the unit performance test items are completed. 3.0.5 The preliminary inspection and re-inspection when reaching the standard and put into production shall be carried out for acceptance according to the provisions of clause 4, including “4.1 Occupational health and safety and environmental management", "4.2 Civil engineering quality", "4.3 Engineering quality of boiler unit", "4.4 Engineering quality of turbine generator unit", "4.5 Quality of electric and thermal instruments and control devices", "4.6 Commissioning test, performance test and main technical criteria" and "4.7 Comprehensive engineering management and archives". The "inspection contents" of preliminary inspection for which the inspection and acceptance conditions are not adequate shall be carried out during re-inspection. 3.0.6 The inspection and acceptance contents listed in the 7 parts in clause 4 of this specification are not mandatory if there is no such item in the project concerned. 3.0.7 The nature of "inspection contents" in the inspection and acceptance form of the 7 parts in clause 4 of this specification is "general" except for those labeled "dominant". 3.0.8 For the same “inspection contents” of the "main project documents" in Table 4.7 as those in the inspection and acceptance forms of the other 6 parts in clause 4 of this specification, the inspection and acceptance for comprehensive engineering management and archives shall focus on checking the integrity and systematicness of the documents, while the other 6 parts shall focus on checking the authenticity and correctness of the technical contents. 3.0.9 During the engineering construction, the development organization shall organize all participating construction organizations to carry out whole-process quality control according to this specification.
Contents of DL 5277-2012
Foreword i 1 General 2 Terms 3 Basic requirements 4 Inspection and acceptance contents for reaching the standard and putting into production 4.1 Occupational health, safety and environmental management 4.2 Civil engineering quality 4.3 Engineering quality of boiler unit 4.4 Engineering quality of turbine generator unit 4.5 Quality of electric and thermal instruments and control devices 4.6 Commissioning test, performance test and main technical criteria 4.7 Comprehensive engineering management and archives 5 Preliminary inspection for reaching the standard and putting into production 6 Re-inspection for reaching the standard and putting into production 7 Conclusion for acceptance when reaching the standard and put into production Annex A Re-inspection (preliminary inspection) report of thermal power engineering reaching the standard and put into production Annex B Re-inspection (preliminary inspection) and acceptance results form of compulsory provisions Annex C Re-inspection application form for thermal power engineering reaching the standard and put into production Annex D Major economic and technical indicators Explanation of wording in this specification List of quoted standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL 5277-2012, DL/T 5277-2012, DLT 5277-2012, DL5277-2012, DL 5277, DL5277, DL/T5277-2012, DL/T 5277, DL/T5277, DLT5277-2012, DLT 5277, DLT5277