2025-12-16 216.73.216.89
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5029-1994
DL/T 5029-1994   Standard for Designing of Architectural Finishings of Thermal Pow (English Version)
Standard No.: DL/T 5029-1994 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 11000 words Translation Price(USD):270.0 remind me the price change

Email:

Implemented on:1994-7-1 Delivery: via email in 1 business day

→ → →

,2012-12-1,1994-7-1,14113730171662F1457B2D61E8075
Standard No.: DL/T 5029-1994
English Name: Standard for Designing of Architectural Finishings of Thermal Pow
Chinese Name: 火力发电厂建筑装修设计标准
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: Ministry of Power Industry
Issued on: 1994-03-01
Implemented on: 1994-7-1
Status: superseded
Superseded by:DL/T 5029-2012 Standard for design of architectural finishings of fossil fuel power plants
Superseded on:2012-12-1
Target Language: English
File Format: PDF
Word Count: 11000 words
Translation Price(USD): 270.0
Delivery: via email in 1 business day
1.0.1 This standard is formulated with a view to follow out the power construction guidelines of "Secure, Applicable, Economic and Aesthetic”, unify standards for designing of architectural finishings of thermal power plants, ensure the finish quality, transfigure the interior/exterior environment of building and create civilized production conditions. 1.0.2 This standard is applicable to all kinds of fuel electric plant projects of construction, extension and renovation which is provided with a turbo generator unit in a capacity of 50~600MW. The foreign-related projects and others may be implemented in the way of cross reference according to the practical situation. 1.0.3 The standard for designing of architectural finishings of thermal power plants were divided into 3 grades related to Grade I, II and III according to the quality of finish materials, construction craftwork and required investment cost. The proportions of finish charges accounting the direct charges of construction investment may be divided into Class A and B, Class A indicates the ones with a single-machine capacity in 200MW and above, and Class B indicates the ones with a single-machine capacity in 200MW and under. 1.0.4 The finish design of each monomial construction shall adopt materials of different grades according to the finish parts and requirements of investment ratio of belonged grade. 1.0.5 Not only the requirements stipulated in this standard, but also those in the current relevant ones of the nation, Technical Code for Designing Thermal Power Plants and Technical Regulation for Designing Construction of Thermal Power Plants shall be complied with in the design of architectural finishings of thermal power plants.
1 General provisions 2 Basic requirements 3 Architectural finishing of main power house 3.1 Main power house 3.2 Central control building 4 Electric architectural finishing 4.1 Main control building (network control building) 4.2 Communication building 4.3 Electric laboratory building 4.4 Distribution device building 5 Fuel architectural finishing 5.1 Coal discharging construction 5.2 Coal-store construction 5.3 Coal transport construction 5.4 The coal-transport complex building 5.5 Locomotive shed and coal bulldozer shed 5.6 Fuel pump room 5.7 Deash construction 6 Chemical architectural finishing 6.1 Boiler feed water treated plant 6.2 Circulating water treated plant 6.3 Circulating water chlorinator room 6.4 Acid/alkali discharging pump room 6.5 Oil treatment room 6.6 Hydrogen production station 6.7 Other chemical constructions 7 Subsidiary building finish 7.1 Repair plant 7.2 Air compressor room 7.3 Ethine station 7.4 Metal laboratory 7.5 Partial field repair bay 8 Subsidiary architectural finishing 8.1 Guarder lodge 8.2 Material storage 8.3 Garage 8.4 Firehouse 9 Office construction and plant side living architectural finishing 9.1 The administration and production office building 9.2 Mess hall 9.3 Bathroom 9.4 Duty dormitory and bachelor's dormitory 9.5 Reception centre 9.6 Nursery and kindergarten 9.7 Club Appendix A: The investment proportion schedule of architectural finishing in thermal power plants Appendix B: Explanation of Wording in this standard Additional explanation:
Code of China
Standard
DL/T 5029-1994  Standard for Designing of Architectural Finishings of Thermal Pow (English Version)
Standard No.DL/T 5029-1994
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count11000 words
Price(USD)270.0
Implemented on1994-7-1
Deliveryvia email in 1 business day
Detail of DL/T 5029-1994
Standard No.
DL/T 5029-1994
English Name
Standard for Designing of Architectural Finishings of Thermal Pow
Chinese Name
火力发电厂建筑装修设计标准
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
Ministry of Power Industry
Issued on
1994-03-01
Implemented on
1994-7-1
Status
superseded
Superseded by
DL/T 5029-2012 Standard for design of architectural finishings of fossil fuel power plants
Superseded on
2012-12-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
11000 words
Price(USD)
270.0
Keywords
DL/T 5029-1994, DL 5029-1994, DLT 5029-1994, DL/T5029-1994, DL/T 5029, DL/T5029, DL5029-1994, DL 5029, DL5029, DLT5029-1994, DLT 5029, DLT5029
Introduction of DL/T 5029-1994
1.0.1 This standard is formulated with a view to follow out the power construction guidelines of "Secure, Applicable, Economic and Aesthetic”, unify standards for designing of architectural finishings of thermal power plants, ensure the finish quality, transfigure the interior/exterior environment of building and create civilized production conditions. 1.0.2 This standard is applicable to all kinds of fuel electric plant projects of construction, extension and renovation which is provided with a turbo generator unit in a capacity of 50~600MW. The foreign-related projects and others may be implemented in the way of cross reference according to the practical situation. 1.0.3 The standard for designing of architectural finishings of thermal power plants were divided into 3 grades related to Grade I, II and III according to the quality of finish materials, construction craftwork and required investment cost. The proportions of finish charges accounting the direct charges of construction investment may be divided into Class A and B, Class A indicates the ones with a single-machine capacity in 200MW and above, and Class B indicates the ones with a single-machine capacity in 200MW and under. 1.0.4 The finish design of each monomial construction shall adopt materials of different grades according to the finish parts and requirements of investment ratio of belonged grade. 1.0.5 Not only the requirements stipulated in this standard, but also those in the current relevant ones of the nation, Technical Code for Designing Thermal Power Plants and Technical Regulation for Designing Construction of Thermal Power Plants shall be complied with in the design of architectural finishings of thermal power plants.
Contents of DL/T 5029-1994
1 General provisions 2 Basic requirements 3 Architectural finishing of main power house 3.1 Main power house 3.2 Central control building 4 Electric architectural finishing 4.1 Main control building (network control building) 4.2 Communication building 4.3 Electric laboratory building 4.4 Distribution device building 5 Fuel architectural finishing 5.1 Coal discharging construction 5.2 Coal-store construction 5.3 Coal transport construction 5.4 The coal-transport complex building 5.5 Locomotive shed and coal bulldozer shed 5.6 Fuel pump room 5.7 Deash construction 6 Chemical architectural finishing 6.1 Boiler feed water treated plant 6.2 Circulating water treated plant 6.3 Circulating water chlorinator room 6.4 Acid/alkali discharging pump room 6.5 Oil treatment room 6.6 Hydrogen production station 6.7 Other chemical constructions 7 Subsidiary building finish 7.1 Repair plant 7.2 Air compressor room 7.3 Ethine station 7.4 Metal laboratory 7.5 Partial field repair bay 8 Subsidiary architectural finishing 8.1 Guarder lodge 8.2 Material storage 8.3 Garage 8.4 Firehouse 9 Office construction and plant side living architectural finishing 9.1 The administration and production office building 9.2 Mess hall 9.3 Bathroom 9.4 Duty dormitory and bachelor's dormitory 9.5 Reception centre 9.6 Nursery and kindergarten 9.7 Club Appendix A: The investment proportion schedule of architectural finishing in thermal power plants Appendix B: Explanation of Wording in this standard Additional explanation:
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5029-1994, DL 5029-1994, DLT 5029-1994, DL/T5029-1994, DL/T 5029, DL/T5029, DL5029-1994, DL 5029, DL5029, DLT5029-1994, DLT 5029, DLT5029