2025-12-13 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 5360-2006
DL/T 5360-2006   Code for simulation of dam-break flow for hydropower & hydraulic engineering (English Version)
Standard No.: DL/T 5360-2006 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 14000 words Translation Price(USD):350.0 remind me the price change

Email:

Implemented on:2007-5-1 Delivery: via email in 1~3 business day

→ → →

,2022-5-16,2007-5-1,1411374823880377686BB7789424C
Standard No.: DL/T 5360-2006
English Name: Code for simulation of dam-break flow for hydropower & hydraulic engineering
Chinese Name: 水电水利工程溃坝洪水模拟技术规程
Chinese Classification: P59    Water power engineering
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2006-12-17
Implemented on: 2007-5-1
Status: superseded
Superseded by:NB/T 10805-2021 Code for Calculation of Dam Break Flood and Unsteady Flow for Hydropower Projects
Superseded on:2022-5-16
Target Language: English
File Format: PDF
Word Count: 14000 words
Translation Price(USD): 350.0
Delivery: via email in 1~3 business day
本标准规定了水电水利工程溃坝洪水模拟技术的基本要求。
本标准适用于大中型水电水利工程溃坝洪水模拟,。其他类似工程可参照执行。
Code of China
Standard
DL/T 5360-2006  Code for simulation of dam-break flow for hydropower & hydraulic engineering (English Version)
Standard No.DL/T 5360-2006
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count14000 words
Price(USD)350.0
Implemented on2007-5-1
Deliveryvia email in 1~3 business day
Detail of DL/T 5360-2006
Standard No.
DL/T 5360-2006
English Name
Code for simulation of dam-break flow for hydropower & hydraulic engineering
Chinese Name
水电水利工程溃坝洪水模拟技术规程
Chinese Classification
P59
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2006-12-17
Implemented on
2007-5-1
Status
superseded
Superseded by
NB/T 10805-2021 Code for Calculation of Dam Break Flood and Unsteady Flow for Hydropower Projects
Superseded on
2022-5-16
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
14000 words
Price(USD)
350.0
Keywords
DL/T 5360-2006, DL 5360-2006, DLT 5360-2006, DL/T5360-2006, DL/T 5360, DL/T5360, DL5360-2006, DL 5360, DL5360, DLT5360-2006, DLT 5360, DLT5360
Introduction of DL/T 5360-2006
本标准规定了水电水利工程溃坝洪水模拟技术的基本要求。
本标准适用于大中型水电水利工程溃坝洪水模拟,。其他类似工程可参照执行。
Contents of DL/T 5360-2006
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 5360-2006, DL 5360-2006, DLT 5360-2006, DL/T5360-2006, DL/T 5360, DL/T5360, DL5360-2006, DL 5360, DL5360, DLT5360-2006, DLT 5360, DLT5360