2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 561-1995
DL/T 561-1995   Guide for Chemical Supervision of Water and Steam in Thermal Power Plants (English Version)
Standard No.: DL/T 561-1995 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 8000 words Translation Price(USD):200.0 remind me the price change

Email:

Implemented on:1995-8-1 Delivery: via email in 1 business day

→ → →

,2014-4-1,1995-8-1,14113730597001808CCA16CF9A3BD
Standard No.: DL/T 561-1995
English Name: Guide for Chemical Supervision of Water and Steam in Thermal Power Plants
Chinese Name: 火力发电厂水汽化学监督导则
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: Ministry of Power Industry of the People's Republic of China
Issued on: 1995-3-6
Implemented on: 1995-8-1
Status: superseded
Superseded by:DL/T 561-2013 Guide for Chemical Supervision of Water and Steam in Thermal Power Plant
Superseded on:2014-4-1
Target Language: English
File Format: PDF
Word Count: 8000 words
Translation Price(USD): 200.0
Delivery: via email in 1 business day
1.1 The power plant's steam generation equipment, chemical monitoring is to ensure the security, economic, and stable operation of one of the important part. To meet the high-parameter, large-capacity thermal power needs of rapid development, especially development of the guidelines. 1.2 In order to prevent quality deterioration caused by water and steam equipment accidents, we must implement the "prevention first, quality first" approach, do a good job monitoring the whole process of chemical water and steam quality management. New thermal power plant selection from the water, water treatment system design, equipment and materials selection, installation and commissioning, up to equipment operation, maintenance and deactivation should adhere to quality standards at all stages to ensure the quality of 100% of the water and steamline This guide provides the standard value, ensure that equipment is not due to thermal corrosion, fouling, salt accumulation and accidents. 1.3 The power control (power) the leadership of Council Chief Engineer Chemical monitoring the whole process of quality management. Chief Engineer and chemical professional engineer should always understand and grasp the overall situation of the chemical monitoring, coordination and implementation of the chemical monitoring of the relevant work experiences, and continuously improve the level of the chemical monitoring. 1.4 Thermal Power Plant construction period of the chemical monitoring should be undertaken by Power Construction Company (Board) is responsible for organization and implementation. The supervision must be included in the progress of its implementation should be used as a basis for assessing the quality of works. 1.5 Thermal Power Plant Chief Engineer shall organize and lead steam turbine, boiler, electrical, thermal control, chemical professionals and long-run value of thermal equipment to study the corrosion and scaling problems, analyze the causes, clear division of labor, to implement measures to continuously improve the equipment health, to prevent accidents. 1.6 Chemical water and steam power plant to supervise the work well, we must give full play to the chemical responsible for personnel oversight. Chemical personnel should be responsible for timely and accurate detection of water and steam quality and heat the whole factory equipment corrosion, fouling, salt accumulation level. Abnormal, the leading power plant should be a written report, analyze the causes and make recommendations as a preventive measure. Chemistry should be a dedicated team under the leadership of Chief Engineer, supervision, inspection departments to realize such corrosion, scale measures, so that the quality of water and steam back to normal. When necessary, the chemical responsible for a written staff report can also copy to electronic tubes (Electricity) Board.
1 General Provisions 2 Design Stage 3 Installation and Debugging Stage 4 Running Phase 5 Inspection and Repair, Stages of Shutting Down and Standby 6 Technocracy
Referred in DL/T 561-1995:
*SD 246-1988
*GB 12145-1989
*SD 163-1985
*DL 5000-1994 Technical code for designing fossil fuel power plants
*SDGJ 2-1985
*SDGJ 2-1985
*SDJ 68-1984
*DLJ58-1981 Technical code for construction and acceptance of electric power construction
*SDJJS03-1988
*SD116-1984
*SD135-1986
*SD 223-1987
DL/T 561-1995 is referred in:
* HDJZ 1998 Guideline on Steam Pipe Blowing Startup by Thermal Power Unit
* DL 612-1996 Supervision Code for Boiler and Pressure Vessel of the Power Industry
Code of China
Standard
DL/T 561-1995  Guide for Chemical Supervision of Water and Steam in Thermal Power Plants (English Version)
Standard No.DL/T 561-1995
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count8000 words
Price(USD)200.0
Implemented on1995-8-1
Deliveryvia email in 1 business day
Detail of DL/T 561-1995
Standard No.
DL/T 561-1995
English Name
Guide for Chemical Supervision of Water and Steam in Thermal Power Plants
Chinese Name
火力发电厂水汽化学监督导则
Chinese Classification
Professional Classification
DL
ICS Classification
Issued by
Ministry of Power Industry of the People's Republic of China
Issued on
1995-3-6
Implemented on
1995-8-1
Status
superseded
Superseded by
DL/T 561-2013 Guide for Chemical Supervision of Water and Steam in Thermal Power Plant
Superseded on
2014-4-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
8000 words
Price(USD)
200.0
Keywords
DL/T 561-1995, DL 561-1995, DLT 561-1995, DL/T561-1995, DL/T 561, DL/T561, DL561-1995, DL 561, DL561, DLT561-1995, DLT 561, DLT561
Introduction of DL/T 561-1995
1.1 The power plant's steam generation equipment, chemical monitoring is to ensure the security, economic, and stable operation of one of the important part. To meet the high-parameter, large-capacity thermal power needs of rapid development, especially development of the guidelines. 1.2 In order to prevent quality deterioration caused by water and steam equipment accidents, we must implement the "prevention first, quality first" approach, do a good job monitoring the whole process of chemical water and steam quality management. New thermal power plant selection from the water, water treatment system design, equipment and materials selection, installation and commissioning, up to equipment operation, maintenance and deactivation should adhere to quality standards at all stages to ensure the quality of 100% of the water and steamline This guide provides the standard value, ensure that equipment is not due to thermal corrosion, fouling, salt accumulation and accidents. 1.3 The power control (power) the leadership of Council Chief Engineer Chemical monitoring the whole process of quality management. Chief Engineer and chemical professional engineer should always understand and grasp the overall situation of the chemical monitoring, coordination and implementation of the chemical monitoring of the relevant work experiences, and continuously improve the level of the chemical monitoring. 1.4 Thermal Power Plant construction period of the chemical monitoring should be undertaken by Power Construction Company (Board) is responsible for organization and implementation. The supervision must be included in the progress of its implementation should be used as a basis for assessing the quality of works. 1.5 Thermal Power Plant Chief Engineer shall organize and lead steam turbine, boiler, electrical, thermal control, chemical professionals and long-run value of thermal equipment to study the corrosion and scaling problems, analyze the causes, clear division of labor, to implement measures to continuously improve the equipment health, to prevent accidents. 1.6 Chemical water and steam power plant to supervise the work well, we must give full play to the chemical responsible for personnel oversight. Chemical personnel should be responsible for timely and accurate detection of water and steam quality and heat the whole factory equipment corrosion, fouling, salt accumulation level. Abnormal, the leading power plant should be a written report, analyze the causes and make recommendations as a preventive measure. Chemistry should be a dedicated team under the leadership of Chief Engineer, supervision, inspection departments to realize such corrosion, scale measures, so that the quality of water and steam back to normal. When necessary, the chemical responsible for a written staff report can also copy to electronic tubes (Electricity) Board.
Contents of DL/T 561-1995
1 General Provisions 2 Design Stage 3 Installation and Debugging Stage 4 Running Phase 5 Inspection and Repair, Stages of Shutting Down and Standby 6 Technocracy
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 561-1995, DL 561-1995, DLT 561-1995, DL/T561-1995, DL/T 561, DL/T561, DL561-1995, DL 561, DL561, DLT561-1995, DLT 561, DLT561