2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DL/T 614-2007
DL/T 614-2007   Multifunction electricity meterring equipment (A.C.) (English Version)
Standard No.: DL/T 614-2007 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 9000 words Translation Price(USD):220.0 remind me the price change

Email:

Implemented on:2008-6-1 Delivery: via email in 1 business day

→ → →

,,2008-6-1,141137530671131F6257BDFDE18A5
Standard No.: DL/T 614-2007
English Name: Multifunction electricity meterring equipment (A.C.)
Chinese Name: 多功能电能表
Chinese Classification: N22    Electric energy measurement and load control system
Professional Classification: DL    Professional Standard - Electricity
Source Content Issued by: NDRC
Issued on: 2007-12-3
Implemented on: 2008-6-1
Status: valid
Superseding:DL/T 614-1997 Multifunction Watthour Meter
Target Language: English
File Format: PDF
Word Count: 9000 words
Translation Price(USD): 220.0
Delivery: via email in 1 business day
1 Scope This standard specifies technical elements in electric power industry during the ordering, acceptance and usage of multifunction electrical energy meters and simultaneously normalizes the function set-up. This standard is applicable to the single-phase and three-phase AC electric energy mounted multifunction electrical energy meters (hereinafter referred to as electrical energy meters) with the metering reference frequency of 50Hz (or 60Hz). This standard only specified the functions and technical performance that the electrical energy meters must be possessed of and must be achieved; and technical requirements for the multi-rate electrical energy meters may refer to relevant contents in this standard. 2 Normative References The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments to (excluding amending error in the text), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of the normative document is applicable. For undated references, the latest edition of the normative document applies. GB/T 9092-1998 Time Switch for Tariff and Load Control (idt IEC 62054-21: 2004) GB/T 15284-2002 Particular Requirements for Multi-rate Electricity Meters GB/T 17215.211-2006 Electricity Metering Equipment(a.c.) - General Requirements, Tests and Test Conditions - Part 11: Metering Equipment (idt IEC 62052-11:2003) GB/T 17882-1999 Alternating Current Static Var-hour Meters for Reactive Energy (Classes 2 and 3) (eqv IEC 61268: 1995) DL/T 566 Technical Requirements for Loss-of-voltage Timers DL/T 645 Multi-function Watt-hour Meter Communication Protocol DL/T 830-2002 Technical Requirements for Stoking Single Phase Alternating Current Static Watt-hour Meter JB/T 6214-1992 Guide of Instrument's Reliability Verification Test and Measurement Test (Exponential Distribution) IEC 62053-21: 2003 Electricity Metering Equipment (A.C.) - Particular Requirements - Part 21: Static Meters for Active Energy (Class 1 and 2) IEC 62053-22: 2003 Electricity Metering Equipment (A.C.) - Particular Requirements - Part 22: Static Meters for Active Energy (Class 0.2S and 0.5S) IEC 62053-23: 2003 Electricity Metering Equipment (A.C.) – Particular requirements – Part 23: Static Meters for Reactive Energy 3 Terms and Definitions For the purpose of this standard, the terms and definitions established in GB/T 9092-1998 and the following ones apply. 3.1 Multifunction electrical energy meter It refers to electrical energy meters composed of metering unit and data processing unit and which has more than two functions such as time division and measuring demand besides metering active and reactive energy and are able to display, store and output data. 3.2 Loss of voltage In the three-phase (or single-phase) power supply system, where the load current of some phase is larger than the starting current but the voltage of the voltage line is less than 78% of the normal operating voltage of the electric energy meter for more than 1min; such operating condition is referred to as loss of voltage. 3.3 Critical voltage Electric energy meters are able to start the minimum operating voltage and this value is 60% of the lower limit of reference voltage. 3.4 No-voltage If voltages of three phases (single-phase meter with single-phase voltage) are all less than the critical voltage of electric energy meters and the load current is larger than the 5% rated (basic) current; such operating condition is referred to as no-voltage. 3.5 Loss of phase It refers to the state that the voltage of some phase is less than the critical voltage of electric energy meters and the load current is less than the starting current in three-phase power supply system. 3.6 Loss of current It refers to the state that the three-phase voltage is larger than the critical voltage of electric energy meters, any phase or two phases in three-phase current is less than the starting current and the load current of other phase lines is larger than 5% rated (basic) current. 3.7 Demand It refers to the average power within the specified time. 3.8 Demand interval It refers to the time interval to measure the continuous equality of the average power. 3.9 Maximum demand It refers to the maximum value of the demand recorded within the specified time period. 3.10 Sliding window time It refers to the time interval which is less than the demand interval to measure the maximum demand by recurrence in turn. 3.11 Freeze It refers to the operation to store important data at specific moment. 3.12 Time consumption and rates Several time periods that 24h in one day are divided into are referred to as time consumption, generally apex, peak, flat and valley time consumption. The corresponding price system with the time consumption of power supply consumption for electricity charge calculation is referred to as rate. 3.13 Harmonic content It refers to the component except the fundamental component in the periodic alternating current component. 3.14 Harmonic energy It refers to the sum of the electric energy except the electric energy of the fundamental wave in the periodic alternating current component. 3.15 Power orientation It is determined according to the definition in Appendix E of GB/T 17882-1999. 4 Classification and Configuration of Electrical Energy Meters 4.1 Classification according to accuracy class Electrical energy meters may be divided to 0.2S, 0.5S, 1 and 2 according to accuracy class. 4.2 Classification according to function Electrical energy meters may be divided into gate electrical energy meters, high-voltage electrical energy meters and low-voltage electrical energy meters. 4.2.1 Gate electrical energy meters Gate electrical energy meters are used for key clients of inter-regional interconnecting ties load-center substation, network power plants, interconnecting ties substation between provinces, gates between provinces, regions and cities as well as those with self-contained power supply and signing with network agreement. Such users are characteristic of active forward and reverse, reactive four-quadrant, large power flow variation, wide load dynamic range, high information acquisition frequency, large data transmission volume as well as multi-rate time-sharing metering and power factor assessment function.
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 Classification and Configuration of Electrical Energy Meters 5 Technical Requirements 6 Test Items and Requirements Appendix A (Informative) Detailed List for Test Items Appendix B (Informative) Recommended Calculation Method for Apparent Power and Apparent Electric Energy
Referred in DL/T 614-2007:
*GB/T 9092-1998 Time switch for tariff and load control
*GB/T 15284-2002 Particular requirements for multi - Rate electricity meters
*GB/T 17215.211-2006 GB/T 17215.211-2006
*GB/T 17882-1999 Alternating current static var-hour meters for reactive energy (classes 2 and 3)
*DL/T 566-1995 Technical requirements for loss - of - Voltage timers
*DL/T 645-2007 Multi-function watt-hour meter communication protocol
*DL/T 830-2002 Technical reqirements for stoking single phase alternating current static watt-hour meter
*JB/T 6214-1992 Guideline for Reliability Validation Test and Determination Test (Exponential Distribution) for Instrumentation
DL/T 614-2007 is referred in:
* GB/T 31464-2015 The grid operation code
*GB/T 29319-2012 Technical requirements for connecting photovoltaic power system to distribution network
*DL/T 1040-2007 The grid operation code
*Q/GDW 667-2011 Operation Control Specifications for Connecting Distribution Generation into Distribution Network
Code of China
Standard
DL/T 614-2007   Multifunction electricity meterring equipment (A.C.) (English Version)
Standard No.DL/T 614-2007
Statusvalid
LanguageEnglish
File FormatPDF
Word Count9000 words
Price(USD)220.0
Implemented on2008-6-1
Deliveryvia email in 1 business day
Detail of DL/T 614-2007
Standard No.
DL/T 614-2007
English Name
Multifunction electricity meterring equipment (A.C.)
Chinese Name
多功能电能表
Chinese Classification
N22
Professional Classification
DL
ICS Classification
Issued by
NDRC
Issued on
2007-12-3
Implemented on
2008-6-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
DL/T 614-1997 Multifunction Watthour Meter
Language
English
File Format
PDF
Word Count
9000 words
Price(USD)
220.0
Keywords
DL/T 614-2007, DL 614-2007, DLT 614-2007, DL/T614-2007, DL/T 614, DL/T614, DL614-2007, DL 614, DL614, DLT614-2007, DLT 614, DLT614
Introduction of DL/T 614-2007
1 Scope This standard specifies technical elements in electric power industry during the ordering, acceptance and usage of multifunction electrical energy meters and simultaneously normalizes the function set-up. This standard is applicable to the single-phase and three-phase AC electric energy mounted multifunction electrical energy meters (hereinafter referred to as electrical energy meters) with the metering reference frequency of 50Hz (or 60Hz). This standard only specified the functions and technical performance that the electrical energy meters must be possessed of and must be achieved; and technical requirements for the multi-rate electrical energy meters may refer to relevant contents in this standard. 2 Normative References The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated references, subsequent amendments to (excluding amending error in the text), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of the normative document is applicable. For undated references, the latest edition of the normative document applies. GB/T 9092-1998 Time Switch for Tariff and Load Control (idt IEC 62054-21: 2004) GB/T 15284-2002 Particular Requirements for Multi-rate Electricity Meters GB/T 17215.211-2006 Electricity Metering Equipment(a.c.) - General Requirements, Tests and Test Conditions - Part 11: Metering Equipment (idt IEC 62052-11:2003) GB/T 17882-1999 Alternating Current Static Var-hour Meters for Reactive Energy (Classes 2 and 3) (eqv IEC 61268: 1995) DL/T 566 Technical Requirements for Loss-of-voltage Timers DL/T 645 Multi-function Watt-hour Meter Communication Protocol DL/T 830-2002 Technical Requirements for Stoking Single Phase Alternating Current Static Watt-hour Meter JB/T 6214-1992 Guide of Instrument's Reliability Verification Test and Measurement Test (Exponential Distribution) IEC 62053-21: 2003 Electricity Metering Equipment (A.C.) - Particular Requirements - Part 21: Static Meters for Active Energy (Class 1 and 2) IEC 62053-22: 2003 Electricity Metering Equipment (A.C.) - Particular Requirements - Part 22: Static Meters for Active Energy (Class 0.2S and 0.5S) IEC 62053-23: 2003 Electricity Metering Equipment (A.C.) – Particular requirements – Part 23: Static Meters for Reactive Energy 3 Terms and Definitions For the purpose of this standard, the terms and definitions established in GB/T 9092-1998 and the following ones apply. 3.1 Multifunction electrical energy meter It refers to electrical energy meters composed of metering unit and data processing unit and which has more than two functions such as time division and measuring demand besides metering active and reactive energy and are able to display, store and output data. 3.2 Loss of voltage In the three-phase (or single-phase) power supply system, where the load current of some phase is larger than the starting current but the voltage of the voltage line is less than 78% of the normal operating voltage of the electric energy meter for more than 1min; such operating condition is referred to as loss of voltage. 3.3 Critical voltage Electric energy meters are able to start the minimum operating voltage and this value is 60% of the lower limit of reference voltage. 3.4 No-voltage If voltages of three phases (single-phase meter with single-phase voltage) are all less than the critical voltage of electric energy meters and the load current is larger than the 5% rated (basic) current; such operating condition is referred to as no-voltage. 3.5 Loss of phase It refers to the state that the voltage of some phase is less than the critical voltage of electric energy meters and the load current is less than the starting current in three-phase power supply system. 3.6 Loss of current It refers to the state that the three-phase voltage is larger than the critical voltage of electric energy meters, any phase or two phases in three-phase current is less than the starting current and the load current of other phase lines is larger than 5% rated (basic) current. 3.7 Demand It refers to the average power within the specified time. 3.8 Demand interval It refers to the time interval to measure the continuous equality of the average power. 3.9 Maximum demand It refers to the maximum value of the demand recorded within the specified time period. 3.10 Sliding window time It refers to the time interval which is less than the demand interval to measure the maximum demand by recurrence in turn. 3.11 Freeze It refers to the operation to store important data at specific moment. 3.12 Time consumption and rates Several time periods that 24h in one day are divided into are referred to as time consumption, generally apex, peak, flat and valley time consumption. The corresponding price system with the time consumption of power supply consumption for electricity charge calculation is referred to as rate. 3.13 Harmonic content It refers to the component except the fundamental component in the periodic alternating current component. 3.14 Harmonic energy It refers to the sum of the electric energy except the electric energy of the fundamental wave in the periodic alternating current component. 3.15 Power orientation It is determined according to the definition in Appendix E of GB/T 17882-1999. 4 Classification and Configuration of Electrical Energy Meters 4.1 Classification according to accuracy class Electrical energy meters may be divided to 0.2S, 0.5S, 1 and 2 according to accuracy class. 4.2 Classification according to function Electrical energy meters may be divided into gate electrical energy meters, high-voltage electrical energy meters and low-voltage electrical energy meters. 4.2.1 Gate electrical energy meters Gate electrical energy meters are used for key clients of inter-regional interconnecting ties load-center substation, network power plants, interconnecting ties substation between provinces, gates between provinces, regions and cities as well as those with self-contained power supply and signing with network agreement. Such users are characteristic of active forward and reverse, reactive four-quadrant, large power flow variation, wide load dynamic range, high information acquisition frequency, large data transmission volume as well as multi-rate time-sharing metering and power factor assessment function.
Contents of DL/T 614-2007
Foreword I 1 Scope 2 Normative References 3 Terms and Definitions 4 Classification and Configuration of Electrical Energy Meters 5 Technical Requirements 6 Test Items and Requirements Appendix A (Informative) Detailed List for Test Items Appendix B (Informative) Recommended Calculation Method for Apparent Power and Apparent Electric Energy
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DL/T 614-2007, DL 614-2007, DLT 614-2007, DL/T614-2007, DL/T 614, DL/T614, DL614-2007, DL 614, DL614, DLT614-2007, DLT 614, DLT614