2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/DZ/T 0155-1995
DZ/T 0155-1995   Rules of construction for drill-pouring piles (English Version)
Standard No.: DZ/T 0155-1995 Status:valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 44000 words Translation Price(USD):1100.0 remind me the price change

Email:

Implemented on:1994-12-1 Delivery: via email in 1 business day

→ → →

,,1994-12-1,14113730603601D89FDD28EBD8DCD
Standard No.: DZ/T 0155-1995
English Name: Rules of construction for drill-pouring piles
Chinese Name: 钻孔灌注桩施工规程
Chinese Classification: D81    Geological exploration equipment
Professional Classification: DZ    Professional Standard - Geology&Mineralogy
Issued on: 1995-9-14
Implemented on: 1994-12-1
Status: valid
Target Language: English
File Format: PDF
Word Count: 44000 words
Translation Price(USD): 1100.0
Delivery: via email in 1 business day
1 Subject Content and Application Scope 1.1 Subject content This specification specifies the various technical requirements and related process operation provisions for the production and construction of bored cast-in-place piles. 1.2 Application scope This specification is applicable to the bored cast-in-place pile foundation construction in the industrial and civil buildings as well as structures including heavy facilities, wharfs, bridges and ports in the land or water area, to the landslide treatment by retaining the bored pile revetment, or to the special project construction such as batter pile, pedestal pile and root pile. 1.3 Basic requirements 1.3.1 This specification is the major basis and criterion for the construction management and testing of bored cast-in-place piles, which proposes the definite requirements for the construction design, hole-forming technology, underwater concrete pouring technology, quality testing and tests of the bored cast-in-place piles. The site operation personnel, technical personnel and production management personnel assuming the construction task must strictly comply with and implement this specification. 1.3.2 Bored cast-in-place pile is a underground concealed works, of high quality requirements and multiple construction procedures, that shall be completed continuously within a relatively short time. Therefore, the construction must be carried out seriously in procedures (see procedure chart). Complete technical data shall be provided, construction design shall be formulated and construction preparation shall be completed. The construction management system, post responsibility system, shift system, quality inspection system, equipment, machines and tools maintenance system, and safe production system shall be established for each procedure according to this specification and the design requirements, to achieve the purpose of division of work and specific responsibility, so as to carry out the construction regularly and rapidly.
1 Subject Content and Application Scope 2 Normative References 3 Quality Criteria of Bored Cast-in-place Pile 4 Construction Design 5 Construction Preparation 6 Hole Forming 7 Flushing Fluid and Purification 8 Hole Cleaning 9 Reinforcement Cage Fabrication and Suspending 10 Concrete Preparation and Grouting 11 Construction of Special Pile 12 Quality Inspection and Project Acceptance Appendix A Drill Bit (Additional) Appendix B Steel Bar and Welding Criteria (Additional) Appendix C Static Test of Pile Foundation (Additional) Appendix D Coring Sampling (Additional)
Referred in DZ/T 0155-1995:
*JGJ4-
*GBJ 202-1983 Specifications for construction and acceptance of ground and foundations
*GBJ 7-1989 Specifications for Design of Building Foundations
*GBJ 301-1988 Quality inspection and assessment of building construction
*JTJ 041-2000 Technical Specifications for Construction of Highway Bridges and Culverts
Code of China
Standard
DZ/T 0155-1995  Rules of construction for drill-pouring piles (English Version)
Standard No.DZ/T 0155-1995
Statusvalid
LanguageEnglish
File FormatPDF
Word Count44000 words
Price(USD)1100.0
Implemented on1994-12-1
Deliveryvia email in 1 business day
Detail of DZ/T 0155-1995
Standard No.
DZ/T 0155-1995
English Name
Rules of construction for drill-pouring piles
Chinese Name
钻孔灌注桩施工规程
Chinese Classification
D81
Professional Classification
DZ
ICS Classification
Issued by
Issued on
1995-9-14
Implemented on
1994-12-1
Status
valid
Superseded by
Superseded on
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
44000 words
Price(USD)
1100.0
Keywords
DZ/T 0155-1995, DZ 0155-1995, DZT 0155-1995, DZ/T0155-1995, DZ/T 0155, DZ/T0155, DZ0155-1995, DZ 0155, DZ0155, DZT0155-1995, DZT 0155, DZT0155
Introduction of DZ/T 0155-1995
1 Subject Content and Application Scope 1.1 Subject content This specification specifies the various technical requirements and related process operation provisions for the production and construction of bored cast-in-place piles. 1.2 Application scope This specification is applicable to the bored cast-in-place pile foundation construction in the industrial and civil buildings as well as structures including heavy facilities, wharfs, bridges and ports in the land or water area, to the landslide treatment by retaining the bored pile revetment, or to the special project construction such as batter pile, pedestal pile and root pile. 1.3 Basic requirements 1.3.1 This specification is the major basis and criterion for the construction management and testing of bored cast-in-place piles, which proposes the definite requirements for the construction design, hole-forming technology, underwater concrete pouring technology, quality testing and tests of the bored cast-in-place piles. The site operation personnel, technical personnel and production management personnel assuming the construction task must strictly comply with and implement this specification. 1.3.2 Bored cast-in-place pile is a underground concealed works, of high quality requirements and multiple construction procedures, that shall be completed continuously within a relatively short time. Therefore, the construction must be carried out seriously in procedures (see procedure chart). Complete technical data shall be provided, construction design shall be formulated and construction preparation shall be completed. The construction management system, post responsibility system, shift system, quality inspection system, equipment, machines and tools maintenance system, and safe production system shall be established for each procedure according to this specification and the design requirements, to achieve the purpose of division of work and specific responsibility, so as to carry out the construction regularly and rapidly.
Contents of DZ/T 0155-1995
1 Subject Content and Application Scope 2 Normative References 3 Quality Criteria of Bored Cast-in-place Pile 4 Construction Design 5 Construction Preparation 6 Hole Forming 7 Flushing Fluid and Purification 8 Hole Cleaning 9 Reinforcement Cage Fabrication and Suspending 10 Concrete Preparation and Grouting 11 Construction of Special Pile 12 Quality Inspection and Project Acceptance Appendix A Drill Bit (Additional) Appendix B Steel Bar and Welding Criteria (Additional) Appendix C Static Test of Pile Foundation (Additional) Appendix D Coring Sampling (Additional)
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
DZ/T 0155-1995, DZ 0155-1995, DZT 0155-1995, DZ/T0155-1995, DZ/T 0155, DZ/T0155, DZ0155-1995, DZ 0155, DZ0155, DZT0155-1995, DZT 0155, DZT0155