2025-12-14 216.73.216.3
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 16543-2025
GB 16543-2025   Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace (English Version)
Standard No.: GB 16543-2025 Status:to be valid remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 8500 words Translation Price(USD):255.0 remind me the price change

Email:

Implemented on:2026-11-1 Delivery: via email in 1~3 business day

→ → →

,,2026-11-1,C5A1B253878B92BC1762263305235
Standard No.: GB 16543-2025
English Name: Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace
Chinese Name: 高炉喷吹烟煤系统防爆安全规范
Professional Classification: GB    National Standard
Source Content Issued by: SAMR; SAC
Issued on: 2025-10-31
Implemented on: 2026-11-1
Status: to be valid
Superseding:GB 16543-2008 Safety regulations for explosion prevention and protection on bituminous coal injection system into blast furnace
Target Language: English
File Format: PDF
Word Count: 8500 words
Translation Price(USD): 255.0
Delivery: via email in 1~3 business day
GB 16543-2025 Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace English, Anglais, Englisch, Inglés, えいご This is a draft translation for reference among interesting stakeholders. The finalized translation (passing through draft translation, self-check, revision and verification) will be delivered upon being ordered. ICS 55.200 CCS H 57 National Standard of the People's Republic of China ‌GB 16543-2025 Replaces GB 16543-2008 Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace 高炉喷吹烟煤系统防爆安全规范 Issue date: 2025-10-31 Implementation date: 2026-11-01 Issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China the Standardization Administration of the People's Republic of China Contents Foreword 1 Scope 2 Normative References 3 Terms and Definitions 4 General Requirements 5 Building and Structure Requirements 5.1 Plant Buildings 5.2 Raw Coal Bins 6 Process System and Equipment Requirements 6.1 Coal Mills 6.2 Coal Bins, Bin Pumps, Storage Tanks, and Injection Tanks 6.3 Piping 6.4 System Operation 7 Explosion Control Measures 7.1 Ignition Source Prevention 7.2 Fire Extinguishing Measures 7.3 Inerting Measures 7.4 Explosion Venting 7.5 Explosion Isolation 7.6 Monitoring, Alarm, and Safety Interlocks 8 Operational Safety Management 8.1 Maintenance and Repair 8.2 Personal Protective Equipment (PPE) Requirements 8.3 Hot Work 8.4 Dust Cleaning 9 Verification Methods 1 Scope This document specifies the general requirements for dust explosion prevention and protection measures in blast furnace injection of bituminous coal systems and mixed coal systems, including detailed requirements for buildings, structures, process systems, equipment, explosion control measures, and operational safety management. It also describes verification methods. This document applies to the design, production, maintenance, repair, and management of dust explosion prevention and protection measures in blast furnace injection of bituminous coal systems and mixed coal systems. 2 Normative References The provisions of the following documents constitute essential clauses of this document through normative citations. For dated references, only the cited version applies; for undated references, the latest version (including all amendments) applies. GB/T 3836.35 Explosive Atmospheres – Part 35: Classification of Explosive Dust Atmospheres GB 12158 General Requirements for Preventing Static Electricity Accidents GB 15577 Safety Regulations for Dust Explosion Prevention GB/T 15604 Terms for Dust Explosion Prevention GB 15605 Standards for Dust Explosion Venting GB 39800.1 Specification for Personal Protective Equipment (PPE) – Part 1: General Requirements GB 46768 Technical Specifications for Confined Space Operations GB 50058 Code for Design of Electrical Installations in Explosive Atmospheres GB 50414 Fire Protection Design Standards for Iron and Steel Metallurgical Enterprises GB 50607 Design Code for Blast Furnace Coal Injection Engineering TSG 21 Safety Technical Supervision Regulations for Stationary Pressure Vessels 3 Terms and Definitions Terms and definitions defined in GB/T 15604 and the following apply to this document. 3.1 Pulverized Bituminous Coal A collection of coal particles with dry ash-free volatile matter content exceeding 10%, capable of suspension in airflow. Note: Abbreviated as "pulverized coal." 3.2 Blast Furnace Bituminous Coal Injection System The entire production system from raw coal storage in the coal injection area to drying, pulverization, transportation, and injection into the blast furnace. 3.3 Pulverized Coal Preparation System The system from raw coal bins, heating furnaces, and gas supply systems to pulverized coal silos, including drying, grinding, collecting, and storing pulverized coal. 3.4 Pulverized Coal Conveying System The system from silo pumps after the pulverized coal preparation system to bag filters before the injection system. Note: Abbreviated as "conveying system." 3.5 Pulverized Coal Injection System The system from injection tanks to injection lances, delivering pulverized coal into the blast furnace with carrier gas. Note: Abbreviated as "injection system." 3.6 Drying Medium Inert gas at elevated temperature used for drying and conveying pulverized coal in the preparation system. 3.7 Carrying Medium Gas used to convey pulverized coal in the conveying and injection systems. 3.8 Pulverized Coal Silo A container for temporarily storing pulverized coal at atmospheric pressure. 3.9 Pulverized Coal Storage Tank A pressure vessel in the injection system that receives pulverized coal from silos at atmospheric pressure and discharges it into injection tanks under pressure. 3.10 Injection Tank A pressure vessel with operating pressure exceeding blast furnace hot blast pressure. 3.11 Mixer A device for gas-powder mixing and output. 3.12 Fluidizer A device for fluidizing pulverized coal in containers. 3.13 Mixed Coal A mixture of different coal types (e.g., bituminous and anthracite). 4 General Requirements 4.1 Identify dust explosion risks in the bituminous coal injection system, including the number, location, and hazardous zones of equipment. Assess explosion risks and implement measures to eliminate or control them effectively. 4.2 Establish dust explosion prevention safety management systems (including dust collection system management) and operational procedures. Procedures must include safety measures for explosion prevention and emergency response. 4.3 During design and production, control the following hazards: a) Spontaneous combustion of raw coal in storage areas, silos, or bins, leading to ignited coal entering mills. b) Blockages or interruptions in coal feed, causing temperature spikes. c) Pulverized coal combustion due to: 1) Dead zones in containers or pipelines; 2) Loaded mill trips; 3) Excessive heating furnace air temperature; 4) Air ingress into inert-gas-filled equipment; 5) Hot air or flammable gas backflow into raw coal bins. d) Combustible gas release during grinding, forming explosive mixtures. e) Free radicals promoting coal combustion. f) Significant deviations between actual and design coal types. g) Fire risks triggering explosions or vice versa. h) Asphyxiation hazards from inert gas in equipment. i) Inadequate maintenance or operation by untrained personnel. j) Stronger explosion forces and shorter ignition cycles in air-pressurized systems. k) Unreliable oxygen-coal lance safety interlocks.
Code of China
Standard
GB 16543-2025  Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace (English Version)
Standard No.GB 16543-2025
Statusto be valid
LanguageEnglish
File FormatPDF
Word Count8500 words
Price(USD)255.0
Implemented on2026-11-1
Deliveryvia email in 1~3 business day
Detail of GB 16543-2025
Standard No.
GB 16543-2025
English Name
Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace
Chinese Name
高炉喷吹烟煤系统防爆安全规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
SAMR; SAC
Issued on
2025-10-31
Implemented on
2026-11-1
Status
to be valid
Superseded by
Superseded on
Abolished on
Superseding
GB 16543-2008 Safety regulations for explosion prevention and protection on bituminous coal injection system into blast furnace
Language
English
File Format
PDF
Word Count
8500 words
Price(USD)
255.0
Keywords
GB 16543-2025, GB/T 16543-2025, GBT 16543-2025, GB16543-2025, GB 16543, GB16543, GB/T16543-2025, GB/T 16543, GB/T16543, GBT16543-2025, GBT 16543, GBT16543
Introduction of GB 16543-2025
GB 16543-2025 Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace English, Anglais, Englisch, Inglés, えいご This is a draft translation for reference among interesting stakeholders. The finalized translation (passing through draft translation, self-check, revision and verification) will be delivered upon being ordered. ICS 55.200 CCS H 57 National Standard of the People's Republic of China ‌GB 16543-2025 Replaces GB 16543-2008 Safety specification for explosion prevention and protection on bituminous coal injection system into blast furnace 高炉喷吹烟煤系统防爆安全规范 Issue date: 2025-10-31 Implementation date: 2026-11-01 Issued by the General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China the Standardization Administration of the People's Republic of China Contents Foreword 1 Scope 2 Normative References 3 Terms and Definitions 4 General Requirements 5 Building and Structure Requirements 5.1 Plant Buildings 5.2 Raw Coal Bins 6 Process System and Equipment Requirements 6.1 Coal Mills 6.2 Coal Bins, Bin Pumps, Storage Tanks, and Injection Tanks 6.3 Piping 6.4 System Operation 7 Explosion Control Measures 7.1 Ignition Source Prevention 7.2 Fire Extinguishing Measures 7.3 Inerting Measures 7.4 Explosion Venting 7.5 Explosion Isolation 7.6 Monitoring, Alarm, and Safety Interlocks 8 Operational Safety Management 8.1 Maintenance and Repair 8.2 Personal Protective Equipment (PPE) Requirements 8.3 Hot Work 8.4 Dust Cleaning 9 Verification Methods 1 Scope This document specifies the general requirements for dust explosion prevention and protection measures in blast furnace injection of bituminous coal systems and mixed coal systems, including detailed requirements for buildings, structures, process systems, equipment, explosion control measures, and operational safety management. It also describes verification methods. This document applies to the design, production, maintenance, repair, and management of dust explosion prevention and protection measures in blast furnace injection of bituminous coal systems and mixed coal systems. 2 Normative References The provisions of the following documents constitute essential clauses of this document through normative citations. For dated references, only the cited version applies; for undated references, the latest version (including all amendments) applies. GB/T 3836.35 Explosive Atmospheres – Part 35: Classification of Explosive Dust Atmospheres GB 12158 General Requirements for Preventing Static Electricity Accidents GB 15577 Safety Regulations for Dust Explosion Prevention GB/T 15604 Terms for Dust Explosion Prevention GB 15605 Standards for Dust Explosion Venting GB 39800.1 Specification for Personal Protective Equipment (PPE) – Part 1: General Requirements GB 46768 Technical Specifications for Confined Space Operations GB 50058 Code for Design of Electrical Installations in Explosive Atmospheres GB 50414 Fire Protection Design Standards for Iron and Steel Metallurgical Enterprises GB 50607 Design Code for Blast Furnace Coal Injection Engineering TSG 21 Safety Technical Supervision Regulations for Stationary Pressure Vessels 3 Terms and Definitions Terms and definitions defined in GB/T 15604 and the following apply to this document. 3.1 Pulverized Bituminous Coal A collection of coal particles with dry ash-free volatile matter content exceeding 10%, capable of suspension in airflow. Note: Abbreviated as "pulverized coal." 3.2 Blast Furnace Bituminous Coal Injection System The entire production system from raw coal storage in the coal injection area to drying, pulverization, transportation, and injection into the blast furnace. 3.3 Pulverized Coal Preparation System The system from raw coal bins, heating furnaces, and gas supply systems to pulverized coal silos, including drying, grinding, collecting, and storing pulverized coal. 3.4 Pulverized Coal Conveying System The system from silo pumps after the pulverized coal preparation system to bag filters before the injection system. Note: Abbreviated as "conveying system." 3.5 Pulverized Coal Injection System The system from injection tanks to injection lances, delivering pulverized coal into the blast furnace with carrier gas. Note: Abbreviated as "injection system." 3.6 Drying Medium Inert gas at elevated temperature used for drying and conveying pulverized coal in the preparation system. 3.7 Carrying Medium Gas used to convey pulverized coal in the conveying and injection systems. 3.8 Pulverized Coal Silo A container for temporarily storing pulverized coal at atmospheric pressure. 3.9 Pulverized Coal Storage Tank A pressure vessel in the injection system that receives pulverized coal from silos at atmospheric pressure and discharges it into injection tanks under pressure. 3.10 Injection Tank A pressure vessel with operating pressure exceeding blast furnace hot blast pressure. 3.11 Mixer A device for gas-powder mixing and output. 3.12 Fluidizer A device for fluidizing pulverized coal in containers. 3.13 Mixed Coal A mixture of different coal types (e.g., bituminous and anthracite). 4 General Requirements 4.1 Identify dust explosion risks in the bituminous coal injection system, including the number, location, and hazardous zones of equipment. Assess explosion risks and implement measures to eliminate or control them effectively. 4.2 Establish dust explosion prevention safety management systems (including dust collection system management) and operational procedures. Procedures must include safety measures for explosion prevention and emergency response. 4.3 During design and production, control the following hazards: a) Spontaneous combustion of raw coal in storage areas, silos, or bins, leading to ignited coal entering mills. b) Blockages or interruptions in coal feed, causing temperature spikes. c) Pulverized coal combustion due to: 1) Dead zones in containers or pipelines; 2) Loaded mill trips; 3) Excessive heating furnace air temperature; 4) Air ingress into inert-gas-filled equipment; 5) Hot air or flammable gas backflow into raw coal bins. d) Combustible gas release during grinding, forming explosive mixtures. e) Free radicals promoting coal combustion. f) Significant deviations between actual and design coal types. g) Fire risks triggering explosions or vice versa. h) Asphyxiation hazards from inert gas in equipment. i) Inadequate maintenance or operation by untrained personnel. j) Stronger explosion forces and shorter ignition cycles in air-pressurized systems. k) Unreliable oxygen-coal lance safety interlocks.
Contents of GB 16543-2025
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 16543-2025, GB/T 16543-2025, GBT 16543-2025, GB16543-2025, GB 16543, GB16543, GB/T16543-2025, GB/T 16543, GB/T16543, GBT16543-2025, GBT 16543, GBT16543