2025-5-16 18.97.14.82
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50019-2003
GB 50019-2003   Code for Design of Heating Ventilation and Air Conditioning (English Version)
Standard No.: GB 50019-2003 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 60000 words Price(USD):140.0 remind me the price change

Email:

Implemented on:2004-4-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50019-2003
English Name: Code for Design of Heating Ventilation and Air Conditioning
Chinese Name: 采暖通风与空气调节设计规范
Chinese Classification: P45    Heat supply, air supply, air conditioning and refrigerating engineering in general
Professional Classification: GB    National Standard
ICS Classification: 91.140.30 91.140.30    Ventilation and air-conditioning systems 91.140.30
Issued by: MOC; AQSIQ
Issued on: 2003-11-05
Implemented on: 2004-4-1
Status: superseded
Superseded by:GB 50736-2012 Design Code for Heating Ventilation and Air Conditioning of Civil Buildings
GB 50019-2015 Code for Design of Heating Ventilation and Air Conditioning in Industrial Buildings
Superseded on:2012-10-1
Superseding:GBJ 19-1987
Language: English
File Format: PDF
Word Count: 60000 words
Price(USD): 140.0
Delivery: via email in 1 business day
1.0.1 This code is worked out of to promote application of advanced technology, in heating, ventilation and air conditioning, reasonably utilize and save energy and re¬source, protect the environment ensure good quality and safety, improve working condi¬tion and build comfortable life. 1.0.2 The code is applicable to design of heating, ventilation and air conditioning in construction, extention and renovation of civil and industrial building. The code is not applicable to design of buildings with requirements for special pur¬pose, special requirements on purification and protection and design of clean workshops and temporary buildings. 1.0.3 Design scheme of heating, ventilation and air conditioning shall be defined and decided in accordance with purpose, functions, usages, composition of heating and cooling load, environments and power supply together with consideration to safety, environment protection, energy-saving and hygiene after an integrated technical and eco¬nomic comparison. New technology, new methods, new equipment and new material shall be given priority in design. 1.0.4 In design of heating, ventilation and air-conditioning, spaces for installation, operation and maintenance of equipments, pipes and fittings shall be reserved and holes and openings for installation and maintenance shall be reserved in design if necessary. Transportation passway and lifting facilities shall be established for large equipments and pipes. 1. 0.5 For any equipment and pipe possibly harmful to human body, safety protection measures shall be taken during design for heating, ventilation and air conditioning. 1.0.6 For work within earthquake regions or collapsible loess zones, earthquake resistant and valid preventive measures shall be adopted as per the current national standards and codes in heating, ventilation and air conditioning design. 1.0.7 In heating, ventilation and air conditioning design, requirements of the construction and acceptance shall be considered in accordance with relevant codes and requirements. Special requirements on construction and acceptance shall be specified in the design documents. 1.0.8 Design of heating, ventilation and air conditioning works shall meet not only the requirements stipulated in this standard (code), but also those in other current national standard.
1 General Provisions 2 Terms 3 Indoor and Outdoor Design Conditions 3.1 Indoor Air Design Conditions 3. 2 Outdoor Air Design Conditions 3. 3 Solar Irradiance in Summer 4 Heating 4.1 General Requirements 4. 2 Heat Load 4. 3 Heating with Radiators 4. 4 Hot Water Radiant Heating 4. 5 Gas-fired Infrared Radiant Heating 4. 6 Heating with Hot Air and Hot Air Curtain 4. 7 Electric Heating 4. 8 Heating Pipeline 4. 9 Household-based Heat Metering for Central Heating with Hot Water 5 Ventilation 5.1 General Requirements 5. 2 Natural Ventilation 5. 3 Mechanical Ventilation 5. 4 Emergency Ventilation 5. 5 Heat Insulation and Cooling 5. 6 Dust Removal and Purification of Harmful Gas 5. 7 Selection of Equipment and Installation 5. 8 Air-duct and Others 6 Air Conditioning 6.1 General Requirements 6. 2 Load Calculation 6. 3 Air Conditioning System 6. 4 Cold and Hot Water for Air Conditioning and Condensate Water System 6. 5 Air Distribution 6. 6 Air Treatment 7 Cold and Hot Source for Air Conditioning 7.1 General Requirements 7. 3 Heat Pump 7. 4 Lithium-bromide Absorption Unit 7. 5 Cold Storage and Heat Storage 7. 6 Heat Exchange Device 7. 7 Cooling Water System 7. 8 Refrigerating and Heat Supply Station 7. 9 Cold and Thermal Insulation of Equipments and Pipelines 8 Monitoring and Control 8.1 General Requirements 8. 2 Sensors and Actuators 8. 3 Monitoring and Control of Heating And Ventilation System 8. 4 Monitoring and Control of Air Conditioning System 8. 5 Monitor and Control to Air Conditioning Cold and Heat Source and Air Conditioning Water System 8.6 Central Level Monitor Management System 9 Sound Deadening and Vibration Isolation 9.1 General Requirements 9. 2 Silencing and Sound Insulation 9. 3 Vibration Isolation Appendix A Total Solar Irradiance in Summer Appendix B Solar Irradiance Through Standard Wiondow Glass in Summer Appendix C Map of Atmospheric Transparency Grades for Air Conditioning in Summer Appendix D Heat Loss for Heating Up Cold Air Infiltrated from Slots of Doors/Windows Appendix E Orientation Correction Factor (n Value) for Infiltrated Cold Air Volume Appendix F Calculation of Natural Ventilation Appendix G Minimum Wind Speed of Dust Removal Air Pipe Appendix H Capacity of Ice Storage Equipment and Air Conditioning Standard Refrigerating Output of Refrigerating Unit with Dual Duty Appendix J Minimum Thickness of Cold Insulation Materials of Equipments and Pipelines and Thickness of Condensation Prevention Materials of Condensate Pipes Explanation of Wording in This Code
GB 50019-2003 is referred in:
* GB 50059-2011 Code for Design of 35kV~110kV Substation
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50072-2010 Code for design of cold store
* GB/T 50668-2011 Standard for energy efficient building assessment
* GB 50620-2010 Code for design of viscose fibre plant
* GB 50049-2011 Code for design of small fossil fired power plant
* SY/T 6881-2012 Design Code for Water Treatment and Reinjection Engineering in Highly Hydrogen Sulfide Gas Field
* GB 16912-2008 Safety Technical Regulation for Oxygen and Relative Gases Produced with Cryogenic Method
* GBZ 1-2010 Hygienic Standards for the Design of Industrial Enterprises
* GB 50325-2010 Code for indoor environmental pollution control of civil building engineering
* SY/T 6881-2012 Design Code for Water Treatment and Reinjection Engineering in Highly Hydrogen Sulfide Gas Field
* GB 50059-2011 Code for Design of 35kV~110kV Substation
* GB/T 50668-2011 Standard for energy efficient building assessment
* GB 50660-2011 Code for Designing large and Middle Fossil Fuel Power Plant
* GB 50049-2011 Code for design of small fossil fired power plant
* GB 50620-2010 Code for design of viscose fibre plant
* GB 50325-2010 Code for indoor environmental pollution control of civil building engineering
* CJJ 34-2010 Design Code for City Heating Network
* GBZ 1-2010 Hygienic Standards for the Design of Industrial Enterprises
* GB 50072-2010 Code for design of cold store
* GB 16912-2008 Safety Technical Regulation for Oxygen and Relative Gases Produced with Cryogenic Method
* GB 50049-2011 Code for design of small fossil fired power plant
* SY/T 6881-2012 Design Code for Water Treatment and Reinjection Engineering in Highly Hydrogen Sulfide Gas Field
* SY/T 0091-2006 Code for Engineering Design of Computer Control System for Oil/gas Fields and Pipelines
Code of China
Standard
GB 50019-2003   Code for Design of Heating Ventilation and Air Conditioning (English Version)
Standard No.GB 50019-2003
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count60000 words
Price(USD)140.0
Implemented on2004-4-1
Deliveryvia email in 1 business day
Detail of GB 50019-2003
Standard No.
GB 50019-2003
English Name
Code for Design of Heating Ventilation and Air Conditioning
Chinese Name
采暖通风与空气调节设计规范
Chinese Classification
P45
Professional Classification
GB
ICS Classification
Issued by
MOC; AQSIQ
Issued on
2003-11-05
Implemented on
2004-4-1
Status
superseded
Superseded by
GB 50736-2012 Design Code for Heating Ventilation and Air Conditioning of Civil Buildings
GB 50019-2015 Code for Design of Heating Ventilation and Air Conditioning in Industrial Buildings
Superseded on
2012-10-1
Abolished on
Superseding
GBJ 19-1987
Language
English
File Format
PDF
Word Count
60000 words
Price(USD)
140.0
Keywords
GB 50019-2003, GB/T 50019-2003, GBT 50019-2003, GB50019-2003, GB 50019, GB50019, GB/T50019-2003, GB/T 50019, GB/T50019, GBT50019-2003, GBT 50019, GBT50019
Introduction of GB 50019-2003
1.0.1 This code is worked out of to promote application of advanced technology, in heating, ventilation and air conditioning, reasonably utilize and save energy and re¬source, protect the environment ensure good quality and safety, improve working condi¬tion and build comfortable life. 1.0.2 The code is applicable to design of heating, ventilation and air conditioning in construction, extention and renovation of civil and industrial building. The code is not applicable to design of buildings with requirements for special pur¬pose, special requirements on purification and protection and design of clean workshops and temporary buildings. 1.0.3 Design scheme of heating, ventilation and air conditioning shall be defined and decided in accordance with purpose, functions, usages, composition of heating and cooling load, environments and power supply together with consideration to safety, environment protection, energy-saving and hygiene after an integrated technical and eco¬nomic comparison. New technology, new methods, new equipment and new material shall be given priority in design. 1.0.4 In design of heating, ventilation and air-conditioning, spaces for installation, operation and maintenance of equipments, pipes and fittings shall be reserved and holes and openings for installation and maintenance shall be reserved in design if necessary. Transportation passway and lifting facilities shall be established for large equipments and pipes. 1. 0.5 For any equipment and pipe possibly harmful to human body, safety protection measures shall be taken during design for heating, ventilation and air conditioning. 1.0.6 For work within earthquake regions or collapsible loess zones, earthquake resistant and valid preventive measures shall be adopted as per the current national standards and codes in heating, ventilation and air conditioning design. 1.0.7 In heating, ventilation and air conditioning design, requirements of the construction and acceptance shall be considered in accordance with relevant codes and requirements. Special requirements on construction and acceptance shall be specified in the design documents. 1.0.8 Design of heating, ventilation and air conditioning works shall meet not only the requirements stipulated in this standard (code), but also those in other current national standard.
Contents of GB 50019-2003
1 General Provisions 2 Terms 3 Indoor and Outdoor Design Conditions 3.1 Indoor Air Design Conditions 3. 2 Outdoor Air Design Conditions 3. 3 Solar Irradiance in Summer 4 Heating 4.1 General Requirements 4. 2 Heat Load 4. 3 Heating with Radiators 4. 4 Hot Water Radiant Heating 4. 5 Gas-fired Infrared Radiant Heating 4. 6 Heating with Hot Air and Hot Air Curtain 4. 7 Electric Heating 4. 8 Heating Pipeline 4. 9 Household-based Heat Metering for Central Heating with Hot Water 5 Ventilation 5.1 General Requirements 5. 2 Natural Ventilation 5. 3 Mechanical Ventilation 5. 4 Emergency Ventilation 5. 5 Heat Insulation and Cooling 5. 6 Dust Removal and Purification of Harmful Gas 5. 7 Selection of Equipment and Installation 5. 8 Air-duct and Others 6 Air Conditioning 6.1 General Requirements 6. 2 Load Calculation 6. 3 Air Conditioning System 6. 4 Cold and Hot Water for Air Conditioning and Condensate Water System 6. 5 Air Distribution 6. 6 Air Treatment 7 Cold and Hot Source for Air Conditioning 7.1 General Requirements 7. 3 Heat Pump 7. 4 Lithium-bromide Absorption Unit 7. 5 Cold Storage and Heat Storage 7. 6 Heat Exchange Device 7. 7 Cooling Water System 7. 8 Refrigerating and Heat Supply Station 7. 9 Cold and Thermal Insulation of Equipments and Pipelines 8 Monitoring and Control 8.1 General Requirements 8. 2 Sensors and Actuators 8. 3 Monitoring and Control of Heating And Ventilation System 8. 4 Monitoring and Control of Air Conditioning System 8. 5 Monitor and Control to Air Conditioning Cold and Heat Source and Air Conditioning Water System 8.6 Central Level Monitor Management System 9 Sound Deadening and Vibration Isolation 9.1 General Requirements 9. 2 Silencing and Sound Insulation 9. 3 Vibration Isolation Appendix A Total Solar Irradiance in Summer Appendix B Solar Irradiance Through Standard Wiondow Glass in Summer Appendix C Map of Atmospheric Transparency Grades for Air Conditioning in Summer Appendix D Heat Loss for Heating Up Cold Air Infiltrated from Slots of Doors/Windows Appendix E Orientation Correction Factor (n Value) for Infiltrated Cold Air Volume Appendix F Calculation of Natural Ventilation Appendix G Minimum Wind Speed of Dust Removal Air Pipe Appendix H Capacity of Ice Storage Equipment and Air Conditioning Standard Refrigerating Output of Refrigerating Unit with Dual Duty Appendix J Minimum Thickness of Cold Insulation Materials of Equipments and Pipelines and Thickness of Condensation Prevention Materials of Condensate Pipes Explanation of Wording in This Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB 50019-2003, GB/T 50019-2003, GBT 50019-2003, GB50019-2003, GB 50019, GB50019, GB/T50019-2003, GB/T 50019, GB/T50019, GBT50019-2003, GBT 50019, GBT50019