2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50059-1992
GB 50059-1992   Design code for substation(35~110kv) (English Version)
Standard No.: GB 50059-1992 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 10000 words Translation Price(USD):250.0 remind me the price change

Email:

Implemented on:1993-5-1 Delivery: via email in 1 business day

→ → →

,2012-8-1,1993-5-1,141138133449570B1E6A4A5649202
Standard No.: GB 50059-1992
English Name: Design code for substation(35~110kv)
Chinese Name: 35~110kV变电所设计规范
Chinese Classification: P62    Power transmission and transformation engineering
Professional Classification: GB    National Standard
ICS Classification: 91.140.50 91.140.50    Electricity supply systems 91.140.50
Source Content Issued by: SQTSB; MOC
Issued on: 1992-09-25
Implemented on: 1993-5-1
Status: superseded
Superseded by:GB 50059-2011 Code for Design of 35kV~110kV Substation
Superseded on:2012-8-1
Superseding:GBJ 59-1983
Target Language: English
File Format: PDF
Word Count: 10000 words
Translation Price(USD): 250.0
Delivery: via email in 1 business day
Article 1.0.1 This code is made to implement seriously the relevant national technical and economical policies in the design of substations so as to meet the requirements of safety and reliable operation, advanced technology and rationality and economy. Article 1.0.2 This code applies to the design of newly built substations with voltage of 35 ~ 110kV, capacity of single transformer of 5000kVA and above. Article 1.0.3 The design of substation shall be based on the 5 ~ 10 years planning for the project; both the short and long-term planning shall be taken into consideration, with the stress on the short-term; the relationship between the short-term construction and the long-term development shall be handled correctly and proper consideration shall be given to the possibility of future extension. Article 1.0.4 The design of substation must be based on the overall situation giving an allround consideration to the design scheme according to the load nature, power consumption capacity, project characteristics and the regional power supply conditions, and determined rationally according to China’s reality. Article 1.0.5 The design of substation must follow the principle of saving on land. Article 1.0.6 The design of substation must also comply with the relevant national codes and standards currently in force, in addition to implementing this code.
Contents Chapter 1 General CHAPTER 2 SITE SELECTION AND ARRANGEMENT CHAPTER 3 ELECTRICAL PART Section 1 Main transformer Section 2 Electrical main wiring Section 3 Substation power supply and operation power supply Section 4 Control room Section 5 Secondary wiring Section 6 Lighting Section 7 Capacitor units in parallel Section 8 Cable laying Section 9 Remote control and communication Section 10 Indoor and outdoor power distribution devices Section 11 Relay protection and automatic devices Section 12 Electrical measuring instrument devices Section 13 Over-voltage protections Section 14 Earthing CHAPTER 4 CIVIL WORKS Section 1 General Regulations Section 2 Load Section 3 Buildings Section 4 Structures Section 5 Heating and ventilation Section 6 Fire prevention Appendix I Minimum Horizontal Net Distance Between Underground Pipelines Appendix II Minimum Net Vertical Distance for Crossing of Underground Pipelines and for Crossing Pipeline with Road Appendix III Limit of Deflection and Cracking Appendix IV Evenly Distributed Live Load of Buildings and Relevant Factors Appendix V Maximum Distance of Anti Seismic Transverse Brick Walls Appendix VI Limit of Local Size of Multi-story Brick Bearing Buildings Type Appendix VII Calculated Length of Pressed Rod Inside and Outside the Plane of Λ-shape Column Appendix VIII Calculated Length of Pressed Rod Appendix IX Minimum Fire Resistance Class for Buildings and Structures of Substation Appendix X Minimum Fire prevention Net Distance for Buildings, Structures and Equipment
GB 50059-1992 is referred in:
* DL/T 5136-2001 Technical Code for Designing of Electrical Secondary Wiring in Fossil Fuel Power Plants and Substations
Code of China
Standard
GB 50059-1992  Design code for substation(35~110kv) (English Version)
Standard No.GB 50059-1992
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count10000 words
Price(USD)250.0
Implemented on1993-5-1
Deliveryvia email in 1 business day
Detail of GB 50059-1992
Standard No.
GB 50059-1992
English Name
Design code for substation(35~110kv)
Chinese Name
35~110kV变电所设计规范
Chinese Classification
P62
Professional Classification
GB
ICS Classification
Issued by
SQTSB; MOC
Issued on
1992-09-25
Implemented on
1993-5-1
Status
superseded
Superseded by
GB 50059-2011 Code for Design of 35kV~110kV Substation
Superseded on
2012-8-1
Abolished on
Superseding
GBJ 59-1983
Language
English
File Format
PDF
Word Count
10000 words
Price(USD)
250.0
Keywords
GB 50059-1992, GB/T 50059-1992, GBT 50059-1992, GB50059-1992, GB 50059, GB50059, GB/T50059-1992, GB/T 50059, GB/T50059, GBT50059-1992, GBT 50059, GBT50059
Introduction of GB 50059-1992
Article 1.0.1 This code is made to implement seriously the relevant national technical and economical policies in the design of substations so as to meet the requirements of safety and reliable operation, advanced technology and rationality and economy. Article 1.0.2 This code applies to the design of newly built substations with voltage of 35 ~ 110kV, capacity of single transformer of 5000kVA and above. Article 1.0.3 The design of substation shall be based on the 5 ~ 10 years planning for the project; both the short and long-term planning shall be taken into consideration, with the stress on the short-term; the relationship between the short-term construction and the long-term development shall be handled correctly and proper consideration shall be given to the possibility of future extension. Article 1.0.4 The design of substation must be based on the overall situation giving an allround consideration to the design scheme according to the load nature, power consumption capacity, project characteristics and the regional power supply conditions, and determined rationally according to China’s reality. Article 1.0.5 The design of substation must follow the principle of saving on land. Article 1.0.6 The design of substation must also comply with the relevant national codes and standards currently in force, in addition to implementing this code.
Contents of GB 50059-1992
Contents Chapter 1 General CHAPTER 2 SITE SELECTION AND ARRANGEMENT CHAPTER 3 ELECTRICAL PART Section 1 Main transformer Section 2 Electrical main wiring Section 3 Substation power supply and operation power supply Section 4 Control room Section 5 Secondary wiring Section 6 Lighting Section 7 Capacitor units in parallel Section 8 Cable laying Section 9 Remote control and communication Section 10 Indoor and outdoor power distribution devices Section 11 Relay protection and automatic devices Section 12 Electrical measuring instrument devices Section 13 Over-voltage protections Section 14 Earthing CHAPTER 4 CIVIL WORKS Section 1 General Regulations Section 2 Load Section 3 Buildings Section 4 Structures Section 5 Heating and ventilation Section 6 Fire prevention Appendix I Minimum Horizontal Net Distance Between Underground Pipelines Appendix II Minimum Net Vertical Distance for Crossing of Underground Pipelines and for Crossing Pipeline with Road Appendix III Limit of Deflection and Cracking Appendix IV Evenly Distributed Live Load of Buildings and Relevant Factors Appendix V Maximum Distance of Anti Seismic Transverse Brick Walls Appendix VI Limit of Local Size of Multi-story Brick Bearing Buildings Type Appendix VII Calculated Length of Pressed Rod Inside and Outside the Plane of Λ-shape Column Appendix VIII Calculated Length of Pressed Rod Appendix IX Minimum Fire Resistance Class for Buildings and Structures of Substation Appendix X Minimum Fire prevention Net Distance for Buildings, Structures and Equipment
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50059-1992, GB/T 50059-1992, GBT 50059-1992, GB50059-1992, GB 50059, GB50059, GB/T50059-1992, GB/T 50059, GB/T50059, GBT50059-1992, GBT 50059, GBT50059