2025-6-19 18.97.9.170
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50156-2012
GB 50156-2012   Code for design and construction of automobile gasoline and gas filling station (English Version)
Standard No.: GB 50156-2012 Status:superseded remind me the status change

Email:

Language:English File Format:PDF
Word Count: 40,000 words Price(USD):220.0 remind me the price change

Email:

Implemented on:2013-3-1 Delivery: via email in 1 business day
,,
Standard No.: GB 50156-2012
English Name: Code for design and construction of automobile gasoline and gas filling station
Chinese Name: 汽车加油加气站设计与施工规范
Professional Classification: GB    National Standard
Issued by: MOHURD
Issued on: 2012-06-28
Implemented on: 2013-3-1
Status: superseded
Superseded by:GB 50156-2012(2014) Code for design and construction of automobile gasoline and gas filling station
GB 50156-2021 Technical standard of fuelling station
Superseded on:2013-3-1
Superseding:GB 50156-2002(2006) Code for Design and Construction of Automobile Gasoline and Gas Filling Station
Language: English
File Format: PDF
Word Count: 40,000 words
Price(USD): 220.0
Delivery: via email in 1 business day
1 General Provisions 1.0.1 This code is formulated with a view to implementing the national relevant principles and policies in the design and construction of filling station, unifying the technical requirements, and achieving safety and usability, advanced technology, economy and rationality. 1.0.2 This code is applicable to the design and construction of newly-built, expanded and renovated filling station, gas filling station and fuel and gas combined filling station engineering. 1.0.3 In addition to this code, the design and construction of filling station shall also comply with those in the current relevant ones of the nation. 2 Terms, Symbols and Abbreviations 2.1 Terms 2.1.1 Filling station General term of fuel filling station, gas filling station as well as fuel and gas combined filling station. 2.1.2 Fuel filling station Place where fuel storage facilities are provided, and a fuel dispenser is used to fill vehicle fuel oil such as gasoline and diesel for motor vehicles and other convenient services may be provided. 2.1.3 Gas filling station Place where gas storage facilities are provided, and a gas dispenser is used to fill vehicle fuel gas such as LPG, CNG or LNG for motor vehicles and other convenient services may be provided. 2.1.4 Fuel and gas combined filling station Place where fuel (gas) storage facilities are provided, vehicle fuel oil and vehicle fuel gas may be filled for motor vehicles, and other convenient services may also be provided. 2.1.5 Station house Building for filling station management and operation, where other convenient services may be provided. 2.1.6 Operational area Area in the filling station where such equipments as fuel (gas) unloading facilities, fuel (gas) storage facilities, fuel dispenser, gas dispenser, dispensing (bleeding) pole, vent pipe (bleeder), combustible liquid tank car unloading parking space, vehicle-mounted storage bottles group trailer parking space, LPG (LNG) pump and CNG (LPG) compressor are arranged. The boundary line of this area is the boundary line of equipment explosion danger area plus 3m, and is the outer edge of diesel-filling equipment plus 3m. 2.1.7 Auxiliary service area Area outside the operational area within the range of property line of filling station. 2.1.8 Safe-break valve Device that may be separated into two sections under certain external force action and has self-sealing function. This device is installed on the hose of fuel dispenser, gas dispenser or dispensing (bleeding) pole and is the dedicated protective device to prevent the hose from being snapped off to have any leakage accident. 2.1.9 Piping components
1 General Provisions 2 Terms, Symbols and Abbreviations 2.1 Terms 2.2 Symbols 2.3 Abbreviations 3 Basic Requirements 4 Site Selection 5 Station Layout 6 Fuel Filling Process and Facilities 6.1 Oil Tank 6.2 Fuel Dispenser 6.3 Process Pipeline System 6.4 Portable Fuel Device 6.5 Seepage-proof Measures 6.6 Self Help Fuel Filling Station (Area) 7 LPG Filling Process and Facilities 7.1 LPG Tank 7.2 Pump and Compressor 7.3 LPG Dispenser 7.4 LPG Pipeline System 7.5 Unloading Point of Tank Car 8 CNG Filling Process and Facility 8.1 Process and Facility of CNG Normal Filling Station and Primary Filling Station 8.2 Process Facility of Secondary CNG Filling Station 8.3 Safety Protection of CNG Process Facility 8.4 CNG Pipeline and Components 9 LNG and L-CNG Filling Process and Facilities 9.1 LNG Tank, Pump and Gasifier 9.2 LNG Unloading 9.3 LNG Filling Area 9.4 LNG Pipeline System 10 Fire-fighting Facilities and Water Supply and Drainage 10.1 Arrangement of Fire-fighting Equipment 10.2 Fire Water Supply 10.3 Water Supply and Drainage System 11 Electrical, Alarm and Emergency Shut-off System 11.1 Power Supply and Distribution 11.2 Lightning Protection and Electrostatic Protection 11.3 Charging Facilities 11.4 Alarm System 11.5 Emergency Shut-off System 12 Heating and Ventilation, Buildings (Structures) and Greening 12.1 Heating and Ventilation 12.2 Buildings (Structures) 12.3 Greening 13 Engineering Construction 13.1 General Requirements 13.2 Materials and Equipment Inspection 13.3 Civil Engineering 13.4 Equipment Installation Engineering 13.5 Pipeline Engineering 13.6 Electrical Instruments Installation Engineering 13.7 Corrosion Protection and Thermal Insulation Engineering 13.8 Hand-over Documents Appendix A Start and End Points for Calculating Distance Appendix B Classification of Protection Category of Civil Buildings Appendix C Grade and Range Division of Explosion Danger Areas in Filling Station Explanation of Wording in this Code List of Quoted Standards
Code of China
Standard
GB 50156-2012  Code for design and construction of automobile gasoline and gas filling station (English Version)
Standard No.GB 50156-2012
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count40,000 words
Price(USD)220.0
Implemented on2013-3-1
Deliveryvia email in 1 business day
Detail of GB 50156-2012
Standard No.
GB 50156-2012
English Name
Code for design and construction of automobile gasoline and gas filling station
Chinese Name
汽车加油加气站设计与施工规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOHURD
Issued on
2012-06-28
Implemented on
2013-3-1
Status
superseded
Superseded by
GB 50156-2012(2014) Code for design and construction of automobile gasoline and gas filling station
GB 50156-2021 Technical standard of fuelling station
Superseded on
2013-3-1
Abolished on
Superseding
GB 50156-2002(2006) Code for Design and Construction of Automobile Gasoline and Gas Filling Station
Language
English
File Format
PDF
Word Count
40,000 words
Price(USD)
220.0
Keywords
GB 50156-2012, GB/T 50156-2012, GBT 50156-2012, GB50156-2012, GB 50156, GB50156, GB/T50156-2012, GB/T 50156, GB/T50156, GBT50156-2012, GBT 50156, GBT50156
Introduction of GB 50156-2012
1 General Provisions 1.0.1 This code is formulated with a view to implementing the national relevant principles and policies in the design and construction of filling station, unifying the technical requirements, and achieving safety and usability, advanced technology, economy and rationality. 1.0.2 This code is applicable to the design and construction of newly-built, expanded and renovated filling station, gas filling station and fuel and gas combined filling station engineering. 1.0.3 In addition to this code, the design and construction of filling station shall also comply with those in the current relevant ones of the nation. 2 Terms, Symbols and Abbreviations 2.1 Terms 2.1.1 Filling station General term of fuel filling station, gas filling station as well as fuel and gas combined filling station. 2.1.2 Fuel filling station Place where fuel storage facilities are provided, and a fuel dispenser is used to fill vehicle fuel oil such as gasoline and diesel for motor vehicles and other convenient services may be provided. 2.1.3 Gas filling station Place where gas storage facilities are provided, and a gas dispenser is used to fill vehicle fuel gas such as LPG, CNG or LNG for motor vehicles and other convenient services may be provided. 2.1.4 Fuel and gas combined filling station Place where fuel (gas) storage facilities are provided, vehicle fuel oil and vehicle fuel gas may be filled for motor vehicles, and other convenient services may also be provided. 2.1.5 Station house Building for filling station management and operation, where other convenient services may be provided. 2.1.6 Operational area Area in the filling station where such equipments as fuel (gas) unloading facilities, fuel (gas) storage facilities, fuel dispenser, gas dispenser, dispensing (bleeding) pole, vent pipe (bleeder), combustible liquid tank car unloading parking space, vehicle-mounted storage bottles group trailer parking space, LPG (LNG) pump and CNG (LPG) compressor are arranged. The boundary line of this area is the boundary line of equipment explosion danger area plus 3m, and is the outer edge of diesel-filling equipment plus 3m. 2.1.7 Auxiliary service area Area outside the operational area within the range of property line of filling station. 2.1.8 Safe-break valve Device that may be separated into two sections under certain external force action and has self-sealing function. This device is installed on the hose of fuel dispenser, gas dispenser or dispensing (bleeding) pole and is the dedicated protective device to prevent the hose from being snapped off to have any leakage accident. 2.1.9 Piping components
Contents of GB 50156-2012
1 General Provisions 2 Terms, Symbols and Abbreviations 2.1 Terms 2.2 Symbols 2.3 Abbreviations 3 Basic Requirements 4 Site Selection 5 Station Layout 6 Fuel Filling Process and Facilities 6.1 Oil Tank 6.2 Fuel Dispenser 6.3 Process Pipeline System 6.4 Portable Fuel Device 6.5 Seepage-proof Measures 6.6 Self Help Fuel Filling Station (Area) 7 LPG Filling Process and Facilities 7.1 LPG Tank 7.2 Pump and Compressor 7.3 LPG Dispenser 7.4 LPG Pipeline System 7.5 Unloading Point of Tank Car 8 CNG Filling Process and Facility 8.1 Process and Facility of CNG Normal Filling Station and Primary Filling Station 8.2 Process Facility of Secondary CNG Filling Station 8.3 Safety Protection of CNG Process Facility 8.4 CNG Pipeline and Components 9 LNG and L-CNG Filling Process and Facilities 9.1 LNG Tank, Pump and Gasifier 9.2 LNG Unloading 9.3 LNG Filling Area 9.4 LNG Pipeline System 10 Fire-fighting Facilities and Water Supply and Drainage 10.1 Arrangement of Fire-fighting Equipment 10.2 Fire Water Supply 10.3 Water Supply and Drainage System 11 Electrical, Alarm and Emergency Shut-off System 11.1 Power Supply and Distribution 11.2 Lightning Protection and Electrostatic Protection 11.3 Charging Facilities 11.4 Alarm System 11.5 Emergency Shut-off System 12 Heating and Ventilation, Buildings (Structures) and Greening 12.1 Heating and Ventilation 12.2 Buildings (Structures) 12.3 Greening 13 Engineering Construction 13.1 General Requirements 13.2 Materials and Equipment Inspection 13.3 Civil Engineering 13.4 Equipment Installation Engineering 13.5 Pipeline Engineering 13.6 Electrical Instruments Installation Engineering 13.7 Corrosion Protection and Thermal Insulation Engineering 13.8 Hand-over Documents Appendix A Start and End Points for Calculating Distance Appendix B Classification of Protection Category of Civil Buildings Appendix C Grade and Range Division of Explosion Danger Areas in Filling Station Explanation of Wording in this Code List of Quoted Standards
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: TransForyou Co., Ltd. 2008-2040
 
 
Keywords:
GB 50156-2012, GB/T 50156-2012, GBT 50156-2012, GB50156-2012, GB 50156, GB50156, GB/T50156-2012, GB/T 50156, GB/T50156, GBT50156-2012, GBT 50156, GBT50156