GB 50168-1992   Code for construction and acceptance of cable levels electric equipment installation engineering (English Version)
Standard No.: GB 50168-1992 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 12000 words Translation Price(USD):300.0 remind me the price change

Email:

Implemented on:1993-7-1 Delivery: via email in 1 business day

→ → →

,2006-11-1,1993-7-1,14113813344860A17E535BBC7F692
Standard No.: GB 50168-1992
English Name: Code for construction and acceptance of cable levels electric equipment installation engineering
Chinese Name: 电气装置安装工程 电缆线路施工及验收规范
Professional Classification: GB    National Standard
Source Content Issued by: MOC
Issued on: 1992-12-16
Implemented on: 1993-7-1
Status: superseded
Superseded by:GB 50168-2006 Code for construction and acceptance of cable system electric equipment installation engineering
Superseded on:2006-11-1
Target Language: English
File Format: PDF
Word Count: 12000 words
Translation Price(USD): 300.0
Delivery: via email in 1 business day
Article 1.0.1 This code is formulated with a view to ensure the construction quality of cable installation, to promote the technical improvement of the circuit construction and to ensure the safety work of cable routes. Article 1.0.2 This code is applicable for the construction and acceptance of the installation engineering of electric power cable routes or control cable routes that work with a voltage of 500 kV or lower. The installation engineering of cable routes with special requirements such as mines, ships, metallurgy and chemistry, shall meet the corresponding discipline rules. Article 1.0.3 Installation of cable routes shall be carried out in accordance with approved design. Article 1.0.4 The transportation and storage of cable and its appendixes shall be in accordance with the requirement of this code. When the product is with special requirement they shall be in accordance with the requirement. Article 1.0.5 The storage period of cable and its appendixes before installation shall be not longer than 1 year. When a long-term storage is necessary, the period shall be in accordance with special regulations of equipment storage. Article 1.0.6 The adopted cable as well as its appendixes shall be in accordance with the regulations of the running technical standards of the country and qualified certificates shall be available. The equipment shall be with proper nameplate. Article 1.0.7 The safety technical measures adopted in construction shall be in accordance with this code as well as the running safety technical standards and product technical documents. The safety technical measures shall be set down beforehand for important construction projects or procedures. Article 1.0.8 The practice of the construction projects that are related to cable line installation shall be in accordance with the following requirements: A. The constructional engineering quality of buildings and structures that related to cable line installation shall be in accordance with the concerning regulations in the actual national codes of construction and acceptance of constructional engineering. B. Before installation of cable routes, the constructional engineering shall meet the following requirements: a. The pre-embedded fittings shall be in accordance with design and fixed firmly; b. Surfacing and float work shall be finished where there exist cable ducts, tunnels or vertical shafts; c. The temporary construction devices, templates and construction rubbish shall be cleared away where there exist cable layers, cable ducts or tunnels; the construction passage shall be unblocked and coverage plates shall be complete; d. The construction works that can not be carried out after the laying of cable routes shall be finished beforehand; e. Water discharge of cable duct shall be free and the installation of doors and windows of the cable room shall be finished. C. The decorating works of construction engineering caused by the necessity of vacancy-filling, boring or reaming for built-in fittings shall be finished before the startup of an installation finished cable line. Article 1.0.9 Hot galvanized products shall be applied as steel fixing device for installation of cable and its appendixes with exception of anchor-bolt. Article 1.0.10 The anti-jamming measures shall be adopted according to design regulations for the cable routes with requirement on anti-jamming. Article 1.0.11 For the construction and acceptance of cable routes, the regulations in this code shall be executed and the actual national standards or codes concerned shall also be observed.
Chapter 1 General Principles Chapter 2 Transportation and storage Chapter 3 Processing and laying of cable tubes Chapter 4 Manufacture and installation of cable support Chapter 5 Laying of the cable Section 1 General regulation Section 2 Laying of the cable inside production buildings or in tunnels or ditches Section 3 Laying of the cable inside tubes Section 4 Laying of directly embedded cables Section 5 Laying of underwater cables Section 6 Laying of cables above bridge Chapter 6 Manufacture of cable terminals and connectors Section 1 General regulations and preparation works Section 2 Manufacture requirements Chapter 7 Fire-fighting and flame retardant Chapter 8 Hand-over and acceptance of engineering Annex 1 Explanations on nouns applied in this code Annex 2 Typical calculation formulae for lateral Annex 3 Explanations on terms applied in this code Additional Explanation
GB 50168-1992 is referred in:
* DB 11/065-2000 Beijing Technical Code for Detection on Electrical Fire Prevention
* GB 17907-1999 Mechanical parking systems--General safety requirement
Code of China
Standard
GB 50168-1992  Code for construction and acceptance of cable levels electric equipment installation engineering (English Version)
Standard No.GB 50168-1992
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count12000 words
Price(USD)300.0
Implemented on1993-7-1
Deliveryvia email in 1 business day
Detail of GB 50168-1992
Standard No.
GB 50168-1992
English Name
Code for construction and acceptance of cable levels electric equipment installation engineering
Chinese Name
电气装置安装工程 电缆线路施工及验收规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
MOC
Issued on
1992-12-16
Implemented on
1993-7-1
Status
superseded
Superseded by
GB 50168-2006 Code for construction and acceptance of cable system electric equipment installation engineering
Superseded on
2006-11-1
Abolished on
Superseding
Language
English
File Format
PDF
Word Count
12000 words
Price(USD)
300.0
Keywords
GB 50168-1992, GB/T 50168-1992, GBT 50168-1992, GB50168-1992, GB 50168, GB50168, GB/T50168-1992, GB/T 50168, GB/T50168, GBT50168-1992, GBT 50168, GBT50168
Introduction of GB 50168-1992
Article 1.0.1 This code is formulated with a view to ensure the construction quality of cable installation, to promote the technical improvement of the circuit construction and to ensure the safety work of cable routes. Article 1.0.2 This code is applicable for the construction and acceptance of the installation engineering of electric power cable routes or control cable routes that work with a voltage of 500 kV or lower. The installation engineering of cable routes with special requirements such as mines, ships, metallurgy and chemistry, shall meet the corresponding discipline rules. Article 1.0.3 Installation of cable routes shall be carried out in accordance with approved design. Article 1.0.4 The transportation and storage of cable and its appendixes shall be in accordance with the requirement of this code. When the product is with special requirement they shall be in accordance with the requirement. Article 1.0.5 The storage period of cable and its appendixes before installation shall be not longer than 1 year. When a long-term storage is necessary, the period shall be in accordance with special regulations of equipment storage. Article 1.0.6 The adopted cable as well as its appendixes shall be in accordance with the regulations of the running technical standards of the country and qualified certificates shall be available. The equipment shall be with proper nameplate. Article 1.0.7 The safety technical measures adopted in construction shall be in accordance with this code as well as the running safety technical standards and product technical documents. The safety technical measures shall be set down beforehand for important construction projects or procedures. Article 1.0.8 The practice of the construction projects that are related to cable line installation shall be in accordance with the following requirements: A. The constructional engineering quality of buildings and structures that related to cable line installation shall be in accordance with the concerning regulations in the actual national codes of construction and acceptance of constructional engineering. B. Before installation of cable routes, the constructional engineering shall meet the following requirements: a. The pre-embedded fittings shall be in accordance with design and fixed firmly; b. Surfacing and float work shall be finished where there exist cable ducts, tunnels or vertical shafts; c. The temporary construction devices, templates and construction rubbish shall be cleared away where there exist cable layers, cable ducts or tunnels; the construction passage shall be unblocked and coverage plates shall be complete; d. The construction works that can not be carried out after the laying of cable routes shall be finished beforehand; e. Water discharge of cable duct shall be free and the installation of doors and windows of the cable room shall be finished. C. The decorating works of construction engineering caused by the necessity of vacancy-filling, boring or reaming for built-in fittings shall be finished before the startup of an installation finished cable line. Article 1.0.9 Hot galvanized products shall be applied as steel fixing device for installation of cable and its appendixes with exception of anchor-bolt. Article 1.0.10 The anti-jamming measures shall be adopted according to design regulations for the cable routes with requirement on anti-jamming. Article 1.0.11 For the construction and acceptance of cable routes, the regulations in this code shall be executed and the actual national standards or codes concerned shall also be observed.
Contents of GB 50168-1992
Chapter 1 General Principles Chapter 2 Transportation and storage Chapter 3 Processing and laying of cable tubes Chapter 4 Manufacture and installation of cable support Chapter 5 Laying of the cable Section 1 General regulation Section 2 Laying of the cable inside production buildings or in tunnels or ditches Section 3 Laying of the cable inside tubes Section 4 Laying of directly embedded cables Section 5 Laying of underwater cables Section 6 Laying of cables above bridge Chapter 6 Manufacture of cable terminals and connectors Section 1 General regulations and preparation works Section 2 Manufacture requirements Chapter 7 Fire-fighting and flame retardant Chapter 8 Hand-over and acceptance of engineering Annex 1 Explanations on nouns applied in this code Annex 2 Typical calculation formulae for lateral Annex 3 Explanations on terms applied in this code Additional Explanation
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50168-1992, GB/T 50168-1992, GBT 50168-1992, GB50168-1992, GB 50168, GB50168, GB/T50168-1992, GB/T 50168, GB/T50168, GBT50168-1992, GBT 50168, GBT50168