2025-12-5 216.73.216.21
Code of China Chinese Classification Professional Classification ICS Classification Latest News Value-added Services

Position: Chinese Standard in English/GB 50309-2007
GB 50309-2007   Code for quality inspection and acceptance of industrial furnaces building (English Version)
Standard No.: GB 50309-2007 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 35000 words Translation Price(USD):700.0 remind me the price change

Email:

Implemented on:2008-4-1 Delivery: via email in 1 business day

→ → →

,2018-5-1,2008-4-1,1411381818369620C383D57182E17
Standard No.: GB 50309-2007
English Name: Code for quality inspection and acceptance of industrial furnaces building
Chinese Name: 工业炉砌筑工程质量验收规范
Chinese Classification: P34    Industrial construction engineering
Professional Classification: GB    National Standard
ICS Classification: 91.040.20 91.040.20    Buildings for commerce and industry 91.040.20
Source Content Issued by: Ministry of Construction
Issued on: 2007-10-23
Implemented on: 2008-4-1
Status: superseded
Superseded by:GB 50309-2017 Standard for quality inspection and acceptance of industrial furnaces building
Superseded on:2018-5-1
Superseding:GB 50309-1992
Target Language: English
File Format: PDF
Word Count: 35000 words
Translation Price(USD): 700.0
Delivery: via email in 1 business day
1 General provisions 1.0.1 This standard is formulated with a view to unifying the quality inspection and acceptance method of industrial furnace building, promoting enterprises to intensify management, and ensuring engineering quality. 1.0.2 This standard is applicable to quality acceptance of industrial furnace building engineering. 1.0.3 The dominant item in this standard, if not indicated with inspection amount, shall be inspected by 100%. 1.0.4 The quality acceptance of industrial furnace building shall meet the requirements of the current relevant national standards, besides this standard. 2 Division, procedure and organization of quality acceptance 2.1 Division of quality acceptance 2.1.1 The quality acceptance of industrial furnace building shall be divided by inspection lot, subitem project, subsection project and unit project. 2.1.2 The division of quality inspection and acceptance for industrial furnace building by inspection lot, subitem project, subsection project and unit project shall meet the following requirements: 1 Inspection lots shall be divided by part layer number, construction section and expansion joint according to the industrial furnace quantities and the requirements of construction and quality inspection control. 2 Subitem project shall be divided by industrial furnace structural composition or section, and a subitem project may be consisted of one or several inspection lots. When the quantities of a industrial furnace masonry are less than 100m3, a furnace may be regarded as a subitem project. 3 Subsection project shall be divided by industrial furnace (set). When a subsection project has large scale and can be divided into two or more mutually independent engineering projects, these mutually independent engineering projects may be regarded as a subsection project (or sub-subsection project). If a subsection project has only a subitem project, the subitem project is regarded as a subsection project. 4 Unit project shall be divided by industrial furnace building engineering in a independent production system. When a unit project has large scale and can be divided into two or more mutually independent engineering projects, these mutually independent engineering projects may be regarded as a subsection project (or sub-subsection project). If a unit project has only a subsection project, the subsection project is regarded as a unit project. 1) In an independent production system, industrial furnace building engineering may be regarded as a subsection project and form a unit project with other profession or other building installation engineering, when the quantities of the industrial furnace building is less than 500 m3. 2) When several industrial furnaces are set up in a building or a structure, the building engineering for these industrial furnaces may be regarded as a unit project, and the building engineering for each industrial furnace is regarded as a subsection project. 2.2 Quality acceptance 2.2.1 Qualified quality of inspection lot shall meet the following requirements: 1 The dominant items shall meet the requirements of this standard; 2 All random inspection points for general items shall meet the requirements of this standard. Among the random inspection points for permissible error item, over 80% the actual measured values shall be within the permissible error range in this standard (the actual measured values in critical items shall all be within the permissible error range in this standard). 2.2.2 Qualified quality of subitem project shall meet the following requirements: 1 All inspection lots in the subitem project shall meet the requirements of qualified quality; 2 Inspection lots in the subitem project shall have complete quality assurance information. 2.2.3 Qualified quality of subsection project shall meet the following requirements: 1 The quality of all subitem projects in the subsection project shall all be qualified; 2 Subitem projects in the subsection project shall have complete quality assurance information. 2.2.4 Qualified quality of unit project shall meet the following requirements: 1 The quality of all subsection projects in the unit project shall all be qualified; 2 Subsection projects in the unit project shall have complete quality assurance information. 2.2.5 The inspection lots whose quality cannot conform to the requirements of this standard shall be treated promptly till meeting qualified quality. When the quality after treatment always cannot meet the requirements of the original design, the inspection lots that, the original design organization recognizes, satisfy the production safety and use function, may be accepted.
1 General provisions 2 Division, procedure and organization of quality acceptance 2.1 Division of quality acceptance 2.2 Quality acceptance 2.3 Division, procedure and organization of quality acceptance 3 General requirements for quality inspection and acceptance of industrial furnaces building 3.1 General Requirements 3.2 Bottom and wall 3.3 arch crown 3.4 Pipes 4 Unshaped refractory 4.1 Refractory castable 4.2 Refractory plastics 4.3 Material ramming mass 4.4 Gunning refractory 5 Refractory ceramic fibre 5.1 Layer-spread inner liner 5.2 Corbelling inner liner 5.3 Unshaped refractory ceramic fibre inner liner 6 Blast furnace and its auxiliary facilities 6.1 General Requirements 6.2 Blast furnace bottom 6.3 Blast furnace hearth 6.4 Blast furnace bosh and parts above it 6.5 Air heating furnace bottom and wall 6.6 Checker brick of air heating furnace 6.7 Top of air heating furnace 6.8 Hot air duct 7 Coke Oven and Dry Cooling Equipment 7.1 Foundation-platform Masonry of Coke Oven 7.2 Coke-oven Checker Chamber 7.3 Coke-oven Inclined Flue 7.4 Coke-oven Carbonization Chamber 7.5 Coke Oven Top 7.6 Cooling Zone of Coke Cooling Room 7.7 Slope Air Duct of Coke Cooling Room 7.8 Pre-store Zone of Coke Cooling Room 7.9 Bottom and Wall of Dust-collecting Settling Tank 7.10 Dust-collecting Settling Tank Vault 7.11 Cyclone Dust Collector 8 Steel Converter, Electric Steel Furnace, Mixer Furnace, Torpedo Car and RH Refining Furnace 8.1 Converter 8.2 Electric Steel Furnace 8.3 Mixer Furnace 8.4 Torpedo Car 8.5 RH Refining Furnace 9 Soaking Furnace, Heating Furnace and Heat Treatment Furnace 9.1 Soaking Furnace 9.2 Heating Furnace and Heat Treatment Furnace 10 Reverberating Furnace, Rotary Melting Furnace, Flash Smelting Furnace, Isa Furnace, Horizontal Converter and Ore-smelting Electric Furnace 10.1 Reverberating Furnace 10.2 Rotary Melting Furnace 10.3 Flash Smelting Furnace 10.4 Isa Furnace 10.5 Horizontal Converter 10.6 Ore-smelting Electric Furnace 11 Aluminum Cell 12 Carbon Calcinator and Carbon Roaster 12.1 Carbon Calcinator 12.2 Carbon Roaster 13 Glass Smelting Kiln 14 Rotary Kiln and its Auxiliary Facilities 15 Tunnel Kiln and Roller Kiln 15.1 Tunnel Kiln 15.2 Roller Kiln 16 Reformer and Cracking Furnace 17 Industrial Boiler Annex A Quality Acceptance Records of the Inspection Lot Annex B Quality Acceptance Records of the Subitem Project Annex C Quality Acceptance Records of the Subsection (Sub-subsection) Project Annex D Examination Records of Quality Assurance Information Annex E Quality Final Acceptance Records of the Unit (Sub-unit) Project Annex F Lists of Inspection Instruments Explanation of Wording in This Code
Referred in GB 50309-2007:

GB 50309-2007 is referred in:
* GB 51093-2015 Technical code for hydrochloric acid regeneration engineering according to spraying and roasting technology of iron and steel enterprises
Code of China
Standard
GB 50309-2007  Code for quality inspection and acceptance of industrial furnaces building (English Version)
Standard No.GB 50309-2007
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count35000 words
Price(USD)700.0
Implemented on2008-4-1
Deliveryvia email in 1 business day
Detail of GB 50309-2007
Standard No.
GB 50309-2007
English Name
Code for quality inspection and acceptance of industrial furnaces building
Chinese Name
工业炉砌筑工程质量验收规范
Chinese Classification
P34
Professional Classification
GB
ICS Classification
Issued by
Ministry of Construction
Issued on
2007-10-23
Implemented on
2008-4-1
Status
superseded
Superseded by
GB 50309-2017 Standard for quality inspection and acceptance of industrial furnaces building
Superseded on
2018-5-1
Abolished on
Superseding
GB 50309-1992
Language
English
File Format
PDF
Word Count
35000 words
Price(USD)
700.0
Keywords
GB 50309-2007, GB/T 50309-2007, GBT 50309-2007, GB50309-2007, GB 50309, GB50309, GB/T50309-2007, GB/T 50309, GB/T50309, GBT50309-2007, GBT 50309, GBT50309
Introduction of GB 50309-2007
1 General provisions 1.0.1 This standard is formulated with a view to unifying the quality inspection and acceptance method of industrial furnace building, promoting enterprises to intensify management, and ensuring engineering quality. 1.0.2 This standard is applicable to quality acceptance of industrial furnace building engineering. 1.0.3 The dominant item in this standard, if not indicated with inspection amount, shall be inspected by 100%. 1.0.4 The quality acceptance of industrial furnace building shall meet the requirements of the current relevant national standards, besides this standard. 2 Division, procedure and organization of quality acceptance 2.1 Division of quality acceptance 2.1.1 The quality acceptance of industrial furnace building shall be divided by inspection lot, subitem project, subsection project and unit project. 2.1.2 The division of quality inspection and acceptance for industrial furnace building by inspection lot, subitem project, subsection project and unit project shall meet the following requirements: 1 Inspection lots shall be divided by part layer number, construction section and expansion joint according to the industrial furnace quantities and the requirements of construction and quality inspection control. 2 Subitem project shall be divided by industrial furnace structural composition or section, and a subitem project may be consisted of one or several inspection lots. When the quantities of a industrial furnace masonry are less than 100m3, a furnace may be regarded as a subitem project. 3 Subsection project shall be divided by industrial furnace (set). When a subsection project has large scale and can be divided into two or more mutually independent engineering projects, these mutually independent engineering projects may be regarded as a subsection project (or sub-subsection project). If a subsection project has only a subitem project, the subitem project is regarded as a subsection project. 4 Unit project shall be divided by industrial furnace building engineering in a independent production system. When a unit project has large scale and can be divided into two or more mutually independent engineering projects, these mutually independent engineering projects may be regarded as a subsection project (or sub-subsection project). If a unit project has only a subsection project, the subsection project is regarded as a unit project. 1) In an independent production system, industrial furnace building engineering may be regarded as a subsection project and form a unit project with other profession or other building installation engineering, when the quantities of the industrial furnace building is less than 500 m3. 2) When several industrial furnaces are set up in a building or a structure, the building engineering for these industrial furnaces may be regarded as a unit project, and the building engineering for each industrial furnace is regarded as a subsection project. 2.2 Quality acceptance 2.2.1 Qualified quality of inspection lot shall meet the following requirements: 1 The dominant items shall meet the requirements of this standard; 2 All random inspection points for general items shall meet the requirements of this standard. Among the random inspection points for permissible error item, over 80% the actual measured values shall be within the permissible error range in this standard (the actual measured values in critical items shall all be within the permissible error range in this standard). 2.2.2 Qualified quality of subitem project shall meet the following requirements: 1 All inspection lots in the subitem project shall meet the requirements of qualified quality; 2 Inspection lots in the subitem project shall have complete quality assurance information. 2.2.3 Qualified quality of subsection project shall meet the following requirements: 1 The quality of all subitem projects in the subsection project shall all be qualified; 2 Subitem projects in the subsection project shall have complete quality assurance information. 2.2.4 Qualified quality of unit project shall meet the following requirements: 1 The quality of all subsection projects in the unit project shall all be qualified; 2 Subsection projects in the unit project shall have complete quality assurance information. 2.2.5 The inspection lots whose quality cannot conform to the requirements of this standard shall be treated promptly till meeting qualified quality. When the quality after treatment always cannot meet the requirements of the original design, the inspection lots that, the original design organization recognizes, satisfy the production safety and use function, may be accepted.
Contents of GB 50309-2007
1 General provisions 2 Division, procedure and organization of quality acceptance 2.1 Division of quality acceptance 2.2 Quality acceptance 2.3 Division, procedure and organization of quality acceptance 3 General requirements for quality inspection and acceptance of industrial furnaces building 3.1 General Requirements 3.2 Bottom and wall 3.3 arch crown 3.4 Pipes 4 Unshaped refractory 4.1 Refractory castable 4.2 Refractory plastics 4.3 Material ramming mass 4.4 Gunning refractory 5 Refractory ceramic fibre 5.1 Layer-spread inner liner 5.2 Corbelling inner liner 5.3 Unshaped refractory ceramic fibre inner liner 6 Blast furnace and its auxiliary facilities 6.1 General Requirements 6.2 Blast furnace bottom 6.3 Blast furnace hearth 6.4 Blast furnace bosh and parts above it 6.5 Air heating furnace bottom and wall 6.6 Checker brick of air heating furnace 6.7 Top of air heating furnace 6.8 Hot air duct 7 Coke Oven and Dry Cooling Equipment 7.1 Foundation-platform Masonry of Coke Oven 7.2 Coke-oven Checker Chamber 7.3 Coke-oven Inclined Flue 7.4 Coke-oven Carbonization Chamber 7.5 Coke Oven Top 7.6 Cooling Zone of Coke Cooling Room 7.7 Slope Air Duct of Coke Cooling Room 7.8 Pre-store Zone of Coke Cooling Room 7.9 Bottom and Wall of Dust-collecting Settling Tank 7.10 Dust-collecting Settling Tank Vault 7.11 Cyclone Dust Collector 8 Steel Converter, Electric Steel Furnace, Mixer Furnace, Torpedo Car and RH Refining Furnace 8.1 Converter 8.2 Electric Steel Furnace 8.3 Mixer Furnace 8.4 Torpedo Car 8.5 RH Refining Furnace 9 Soaking Furnace, Heating Furnace and Heat Treatment Furnace 9.1 Soaking Furnace 9.2 Heating Furnace and Heat Treatment Furnace 10 Reverberating Furnace, Rotary Melting Furnace, Flash Smelting Furnace, Isa Furnace, Horizontal Converter and Ore-smelting Electric Furnace 10.1 Reverberating Furnace 10.2 Rotary Melting Furnace 10.3 Flash Smelting Furnace 10.4 Isa Furnace 10.5 Horizontal Converter 10.6 Ore-smelting Electric Furnace 11 Aluminum Cell 12 Carbon Calcinator and Carbon Roaster 12.1 Carbon Calcinator 12.2 Carbon Roaster 13 Glass Smelting Kiln 14 Rotary Kiln and its Auxiliary Facilities 15 Tunnel Kiln and Roller Kiln 15.1 Tunnel Kiln 15.2 Roller Kiln 16 Reformer and Cracking Furnace 17 Industrial Boiler Annex A Quality Acceptance Records of the Inspection Lot Annex B Quality Acceptance Records of the Subitem Project Annex C Quality Acceptance Records of the Subsection (Sub-subsection) Project Annex D Examination Records of Quality Assurance Information Annex E Quality Final Acceptance Records of the Unit (Sub-unit) Project Annex F Lists of Inspection Instruments Explanation of Wording in This Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50309-2007, GB/T 50309-2007, GBT 50309-2007, GB50309-2007, GB 50309, GB50309, GB/T50309-2007, GB/T 50309, GB/T50309, GBT50309-2007, GBT 50309, GBT50309