GB 50460-2008   Code for Construction of Oil and Gas Transmission Pipeline Aerial Crossing Engineering (English Version)
Standard No.: GB 50460-2008 Status:superseded remind me the status change

Email:

Target Language:English File Format:PDF
Word Count: 18000 words Translation Price(USD):360.0 remind me the price change

Email:

Implemented on:2009-6-1 Delivery: via email in 1 business day

→ → →

2016-06-01,2016-6-1,2009-6-1,141138181848628DF0C9838630173
Standard No.: GB 50460-2008
English Name: Code for Construction of Oil and Gas Transmission Pipeline Aerial Crossing Engineering
Chinese Name: 油气输送管道跨越工程施工规范
Professional Classification: GB    National Standard
Source Content Issued by: AQSIQ; MOHURD
Issued on: 2008-12-15
Implemented on: 2009-6-1
Status: superseded
Superseded by:GB 50460-2015 Code for construction of oil and gas transmission pipeline aerial crossing engineering
Superseded on:2016-6-1
Abolished on:2016-06-01
Target Language: English
File Format: PDF
Word Count: 18000 words
Translation Price(USD): 360.0
Delivery: via email in 1 business day
1.0.1 This code is formulated with the view to improve the construction level of oil and gas transmission pipeline, guarantee the construction quality, and make the construction engineering achieve state-of-art technology, economy and rationality, safe and reliable. 1.0.2 This code is applicable to construction, reconstruction and extension engineering of oil and gas transmission pipeline aerial crossing artificial or natural obstacles; it is not applicable to laying pipeline along existing bridge. 1.0.3 During the construction process, requirements on occupational health and safety, environmental protection, protection of historical relics shall comply with provisions of national or local regulations. 1.0.4 Not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with for construction of oil and gas transmission pipeline aerial crossing engineering.
1 General Provision 2 Terms 3 Basic Requirements 4 Construction Preparations 5 Materials and Fittings Supply & Inspection 5.1 Basic requirements 5.2 Inspection for materials, pipes and fittings 6 Surveys and Pipe Alignment 6.1 Basic requirements 6.2 Horizontal control 6.3 Vertical control 6.4 Setting out for construction survey 7 Foundation Constructions 7.1 Pit excavation 7.2 Construction of reinforced concrete foundation 7.3 Construction of steel pile foundation 7.4 Construction of cast-in-situ pile foundation 8 Tower Constructions 8.1 Preparation of steel tower 8.2 Assembly of steel tower 8.3 Construction of reinforced concrete tower 8.4 Assembly of joint plate for saddle or tower top 9 Construction of Suspension Cable Type Pipeline Aerial Crossing 9.1 Basic requirements 9.2 Preparation of steel wire rope 9.3 Installation of main cable 9.4 Installation of other cables 9.5 Fabrication and installation of deck structure 9.6 Anchor block 10 Construction of Obliquely-cable Stayed Type Pipeline Aerial Crossing 10.1 Basic requirements 10.2 Preparation of steel wire rope 10.3 Installation of temporary traction rope 10.4 Fabrication and installation of deck structure 10.5 Stay cable installation 11 Construction of Truss Type Pipeline Aerial Crossing 11.1 Laying off and assembling 11.2 Welding and inspection for truss 11.3 Truss installation 12 Construction of Other Pipeline Aerial Crossing 13 Assembly, Welding and Testing of Aerial Pipeline 13.1 Processing and assembling of pipeline section 13.2 Pipeline welding 13.3 Weld quality inspection 13.4 Assemble and welding of bend 13.5 Making and assembly of expansion joint 13.6 Transmitting and positioning of aerial pipeline 14 Pipeline Cleaning and Pressure Test 14.1 Basic requirements 14.2 Pipe cleaning and pressure test 15 Corrosion Prevention and Thermal Retardation 15.1 Corrosion prevention 15.2 Thermal retardation 16 Health, Safety and Environment 17 Engineering Handover Annex A Temperature Control Measures for Mass Concrete Explanation of Wording in this Code
Code of China
Standard
GB 50460-2008  Code for Construction of Oil and Gas Transmission Pipeline Aerial Crossing Engineering (English Version)
Standard No.GB 50460-2008
Statussuperseded
LanguageEnglish
File FormatPDF
Word Count18000 words
Price(USD)360.0
Implemented on2009-6-1
Deliveryvia email in 1 business day
Detail of GB 50460-2008
Standard No.
GB 50460-2008
English Name
Code for Construction of Oil and Gas Transmission Pipeline Aerial Crossing Engineering
Chinese Name
油气输送管道跨越工程施工规范
Chinese Classification
Professional Classification
GB
ICS Classification
Issued by
AQSIQ; MOHURD
Issued on
2008-12-15
Implemented on
2009-6-1
Status
superseded
Superseded by
GB 50460-2015 Code for construction of oil and gas transmission pipeline aerial crossing engineering
Superseded on
2016-6-1
Abolished on
2016-06-01
Superseding
Language
English
File Format
PDF
Word Count
18000 words
Price(USD)
360.0
Keywords
GB 50460-2008, GB/T 50460-2008, GBT 50460-2008, GB50460-2008, GB 50460, GB50460, GB/T50460-2008, GB/T 50460, GB/T50460, GBT50460-2008, GBT 50460, GBT50460
Introduction of GB 50460-2008
1.0.1 This code is formulated with the view to improve the construction level of oil and gas transmission pipeline, guarantee the construction quality, and make the construction engineering achieve state-of-art technology, economy and rationality, safe and reliable. 1.0.2 This code is applicable to construction, reconstruction and extension engineering of oil and gas transmission pipeline aerial crossing artificial or natural obstacles; it is not applicable to laying pipeline along existing bridge. 1.0.3 During the construction process, requirements on occupational health and safety, environmental protection, protection of historical relics shall comply with provisions of national or local regulations. 1.0.4 Not only the requirements stipulated in this code, but also those in the current relevant ones of the nation shall be complied with for construction of oil and gas transmission pipeline aerial crossing engineering.
Contents of GB 50460-2008
1 General Provision 2 Terms 3 Basic Requirements 4 Construction Preparations 5 Materials and Fittings Supply & Inspection 5.1 Basic requirements 5.2 Inspection for materials, pipes and fittings 6 Surveys and Pipe Alignment 6.1 Basic requirements 6.2 Horizontal control 6.3 Vertical control 6.4 Setting out for construction survey 7 Foundation Constructions 7.1 Pit excavation 7.2 Construction of reinforced concrete foundation 7.3 Construction of steel pile foundation 7.4 Construction of cast-in-situ pile foundation 8 Tower Constructions 8.1 Preparation of steel tower 8.2 Assembly of steel tower 8.3 Construction of reinforced concrete tower 8.4 Assembly of joint plate for saddle or tower top 9 Construction of Suspension Cable Type Pipeline Aerial Crossing 9.1 Basic requirements 9.2 Preparation of steel wire rope 9.3 Installation of main cable 9.4 Installation of other cables 9.5 Fabrication and installation of deck structure 9.6 Anchor block 10 Construction of Obliquely-cable Stayed Type Pipeline Aerial Crossing 10.1 Basic requirements 10.2 Preparation of steel wire rope 10.3 Installation of temporary traction rope 10.4 Fabrication and installation of deck structure 10.5 Stay cable installation 11 Construction of Truss Type Pipeline Aerial Crossing 11.1 Laying off and assembling 11.2 Welding and inspection for truss 11.3 Truss installation 12 Construction of Other Pipeline Aerial Crossing 13 Assembly, Welding and Testing of Aerial Pipeline 13.1 Processing and assembling of pipeline section 13.2 Pipeline welding 13.3 Weld quality inspection 13.4 Assemble and welding of bend 13.5 Making and assembly of expansion joint 13.6 Transmitting and positioning of aerial pipeline 14 Pipeline Cleaning and Pressure Test 14.1 Basic requirements 14.2 Pipe cleaning and pressure test 15 Corrosion Prevention and Thermal Retardation 15.1 Corrosion prevention 15.2 Thermal retardation 16 Health, Safety and Environment 17 Engineering Handover Annex A Temperature Control Measures for Mass Concrete Explanation of Wording in this Code
About Us   |    Contact Us   |    Terms of Service   |    Privacy   |    Cancellation & Refund Policy   |    Payment
Tel: +86-10-8572 5655 | Fax: +86-10-8581 9515 | Email: coc@codeofchina.com | QQ: 672269886
Copyright: Beijing COC Tech Co., Ltd. 2008-2040
 
 
Keywords:
GB 50460-2008, GB/T 50460-2008, GBT 50460-2008, GB50460-2008, GB 50460, GB50460, GB/T50460-2008, GB/T 50460, GB/T50460, GBT50460-2008, GBT 50460, GBT50460